Skip Navigation

Federal Communications Commission

English Display Options

by: Wireline Competition Bureau

October 1, 2012 - 05:00 PM

Please provide comments to the issue below as part of the 2012 WCB cost model virtual workshop for inclusion in the record. Comments are moderated for conformity to the workshop’s guidelines.

Background

The Bureau believes most of the hardware necessary in each wire center is captured by the requirements for voice or inter-office transport.

Hybrid Cost Proxy Model: The HCPM envisions a network that requires a circuit switch for voice calls, digital loop carriers (DLCs), and serving area interfaces (SAIs). The HCPM also includes the costs associated with the main distribution frame (MDF), the purchase and installation of power equipment costs, and appropriate engineering costs.

CQBAT: The CQBAT model includes costs for an all-IP network, including routers, Ethernet switches, and rack space, in addition to costs for buildings, land, and power. For fiber-to-the-premises (FTTP) configurations, the cost of optical line terminators (OLTs) is also included.

Questions for Comment

  1. If we adopt a green-field model, the Bureau proposes to use the CQBAT cost categories. Is there any reason to deviate from CQBAT's approach? Are there other categories that should be added, or some categories that should not be included in a forward-looking cost model?
  2. If we adopt a brown-field model, what costs should be removed or added?

Sources

Not seeing comment form in IE 8? Turn off IE compatibility mode to see comments.
Updated: October 19, 2012 - 05:17 PM
blog comments powered by Disqus
close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.