Bureaus Send Letter to ATIS Re Rural Call Completion Issues

Download Options

Released: December 6, 2011
Federal Communications Commission
Washington, D.C. 20554
December 6, 2011
DA 11-1985
Thomas Goode
General Counsel
ATIS
1200 G Street NW
Washington DC 20005
Dear Mr. Goode:
Thank you for your letter of October 7, 2011, describing the work underway at ATIS on call
termination issues affecting rural areas, and for the offer on behalf of the ATIS NGIFF to assist
the Federal Communications Commission’s Rural Call Completion Task Force in the evaluation
of technical issues related to these call termination problems. The Commission considers the call
termination issue to be a matter of serious concern, and we appreciate ATIS’s prompt response to
this letter to assist the Commission in evaluating, investigating and resolving the issue.1
First, we request an update on any efforts to coordinate with rural incumbent local exchange
carriers to obtain the additional data that would allow ATIS to undertake more detailed study.2
Second, at the Commission’s October 18, 2011, Rural Call Completion Workshop, AT&T
proposed the development of Industry Best Practices for managing intermediate providers and
similarly binding any of their suppliers through contractual or other means. Please provide
information on any work by ATIS in connection with such best practices development, including
the level and nature of active participation from the industry, the expected form and general
timeframes for a deliverable item, and the nature of any contemplated contractual terms, and
quality measures the Industry Best Practices may cover.
Finally, as ATIS has noted, rural customers “have experienced problems with their phone
service, ranging from situations in which the calling party hears ringing but the called party hears
nothing (or there is an unusually long call set-up), the called party’s phone rings but the party
hears dead air when the call is answered, or there is extremely poor quality on answerable
calls.”3 The same concerns have been raised in meetings with the Commission.4 Indeed, on

1 See http://www.fcc.gov/document/fcc-launches-rural-call-completion-task-force-sets-oct-18-workshop
2 See Letter from Thomas Goode, General Counsel, ATIS, to Fred Goodwin, Senior Telecommunications Engineer,
Oregon Public Utility Commission and Don Gray, Telecommunications Analyst, Nebraska Public Service
Commission (Aug. 5, 2011). Available at http://www.atis.org/legal/committee.asp#NGIIF
3 Id.
4 See, e.g., Letter from Jill Canfield, Director, Legal & Industry, NTCA, to Marlene H. Dortch, Secretary, Federal
Communications Commission, WC Docket No. 07-135 et al. (Oct. 7, 2011); Letter from Rural Telecommunications

Federal Communications Commission

DA 11-1985

several occasions over the past few months the Commission’s Rural Call Completion Task Force
staff have experienced these very same problems when attempting to contact certain rural
incumbent local exchange carriers.
It appears that some of these call completion concerns may be attributable to the interworking of
TDM- and IP-based technologies in today’s current generation network and are under the control
of originating carriers and intermediate providers within the call path. As a result, to help the
Rural Call Completion Task Force further investigate the call completion issue and better
understand existing industry standards, please provide the following information. In particular,
for each of the following, please identify whether any are addressed in existing ATIS guidelines
(and, if so, identify the relevant guideline); whether new clarifying guidelines specific to today’s
IP and TDM interworking are planned; and when such guidelines might be available.
·
Excessive call setup delay, which we define to include a delay before the called party
hears ringing that is in excess of 8 seconds. We understand that one possible cause of
excessive call setup delay appears to be a practice of continuing to sequentially search
to find a low-cost path to the rural terminating carrier at the expense of providing
acceptable service quality.
o Does ATIS have or plan guidelines relating, for example, to limits on
searching, or the speed with which intermediate providers should release the
call back to a prior carrier in the call path when faced with apparent delays?
·
Call looping, in which a call is handed over for completion to a provider that has
previously handed off the call, may also be a cause of excessive call setup delay or
setup failure.
o Does ATIS have, or is ATIS planning, guidelines or recommended practices
for detecting and avoiding looping situations?
·
False audible ringing, in which the caller believes he has heard prolonged ringing
before the called phone has actually been rung. This would seem to be a departure
from the long-established telephony signaling practice – and caller expectation – of a
ring back tone not being received before the terminating provider affirmatively
signals that the called party is being alerted that there is an incoming call.
o What guidelines or practices does ATIS recommend for ring tone generation
and the handling of announcements from the terminating carrier? How does
ATIS address the practice of an originating or intermediate provider triggering
audible ringing to the caller before having been signaled by the terminating
provider? Does ATIS recommend any practices for avoiding the caller
experiencing dead air in lieu of false audible ringing?




Industry Representatives to FCC Investigations and Hearing Division (June 13, 2011) (stating that “[s]tories abound
of customers in rural areas who – only after they receive calls via other means (e.g., on a cell phone) or emails from
friends, family, or business colleagues – find that those trying to reach them at home or in the office have been
unable to do so because either the call never went through or it rang a dozen times without answer.”). Available at
https://prodnet.www.neca.org/publicationsdocs/wwpdf/061311callterm.pdf
2

Federal Communications Commission

DA 11-1985

The Rural Call Completion Task Force appreciates ATIS’s interest and cooperation to resolve
this serious matter. We look forward to working with you to ensure the availability and
reliability of voice service for all Americans, including customers in all rural and high-cost areas.
Sincerely,
Sharon Gillett
Chief, Wireline Competition Bureau

James Arden Barnett, Jr.
Chief, Public Safety and Homeland Security
Bureau
3

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.