Skip Navigation

Federal Communications Commission

English Display Options

Commission Document

Cable Technical Requirements NPRM Comments Due 12/10/12 Replies 1/7/13

Download Options

Released: October 9, 2012

PUBLIC NOTICE

Federal Communications Commission

News Media Information 202 / 418-0500

Internet: http://www.fcc.gov

445 12th St., S.W.

TTY: 1-888-835-5322

Washington, D.C. 20554

DA 12-1607

Released: October 9, 2012

Notice of Comment and Reply Deadlines for

Cable Technical Requirements Notice of Proposed Rulemaking

and

Availability of Final Report of the Advisory Committee on Cable Signal Leakage

MB Docket No. 12-217

On August 3, 2012, the Commission adopted the Cable Television Technical and Operational
Requirements, Notice of Proposed Rulemaking, which proposes rules governing proof-of-performance
and cable signal leakage for cable and non-cable multichannel video programming distributors.1 The
deadline to file comments on this notice is 60 days after publication in the Federal Register, and the
deadline for reply comments is 30 days after that. The Federal Register published a summary of the
Notice of Proposed Rulemaking on October 9, 2012.2 Sixty days from this date is Saturday, December 8,
2012. Accordingly, the deadline to file comments in response to the Notice is Monday, December 10,
2012, and the deadline to file replies is Monday, January 7, 2013.
Additionally, the Media Bureau has made available the Final Report of the Advisory Committee
on Signal Leakage on the FCC’s Electronic Comment Filing System, or ECFS.3 The Final Report was
released on November 1, 1979, and is the basis of the FCC’s current signal leakage rules.
People with Disabilities: To request materials in accessible formats for people with disabilities
(Braille, large print, electronic files, audio format), send an e-mail to fcc504@fcc.gov or call the
Consumer & Governmental Affairs Bureau at 202-418-0530 (voice), 202-418-0432 (tty).
For further information regarding this proceeding, contact Jeffrey Neumann of the Engineering
Division of the Media Bureau, at 202-418-2046 or jeffrey.neumann@fcc.gov. For press inquiries, contact
Janice Wise, janice.wise@fcc.gov, 202-418-8165.
-FCC-


1 Cable Television Technical and Operational Requirements, Notice of Proposed Rulemaking, MB Docket 12-217,
FCC 12-86, 27 FCC Rcd 9678 (Aug. 3, 2012).
2 Cable Television Technical and Operational Requirements, 77 FR 61351 (Oct. 9, 2012).
3 Final Report of the Advisory Committee on Signal Leakage (Nov. 1, 1979), available at
http://apps.fcc.gov/ecfs/comment/view?id=6017099200. The FCC’s Electronic Comment Filing System is available
at http://apps.fcc.gov/ecfs/. Note, when searching for this entry in MB Docket 12-217, it is necessary to remove the
default date restriction (one year prior to the current date), as the date of the Final Report is November 1, 1979.

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.