Released: June 3, 2014
image01-00.jpg612x792

Federal Communications Commission

DA 14-756

Before the

Federal Communications Commission

Washington, D.C. 20554

In the Matter of

)

)

City of San Diego, California

)

WT Docket No. 02-55

Request for Waiver and Extension of Time

)

ORDER

Adopted: June 3, 2014

Released: June 3, 2014

By the Deputy Chief, Policy and Licensing Division, Public Safety and Homeland Security Bureau:

I.

INTRODUCTION

1.

Under consideration is the May 28, 2014 Request for Waiver and Extension of Time

(Request) filed by the City of San Diego, California (San Diego). San Diego seeks an extension of time

until August 15, 2014 to submit a cost estimate for reconfiguration of its 800 MHz communications

system. Previously, San Diego was granted an extension of time, for the same purpose, until June 1,

2014.1 For the reasons set out below, the Request is granted.

II. BACKGROUND

2.

San Diego operates a two-site, twelve channel system, which includes 3,400 mobile and

7,800 portable units and also interoperates with agencies throughout the region and County.2 San Diego

represents that preparation of the cost estimate relies on the work of Motorola Solutions (Motorola).3

Previously, San Diego advised the Commission that the Motorola Statement of Work (SOW) was

scheduled for delivery between May 11 and June 11, 2014.4 San Diego states that a Motorola

representative recently advised that a July 15, 2014 “delivery of its statement of work was more

realistic.”5 San Diego states that the Motorola representative “related the challenge that integrating a

cutover plan for the City’s system to the new frequencies requires clarifying with a level of precision still

needed the City’s wide ranging subscriber base.”6 San Diego notes that the planning review process has

evolved from an estimated 600 unit replacement count to approximately 3,000 units.7 San Diego adds

that there is also the challenge of designing how best to verify the readiness of the replacement

1 Improving Public Safety Communications in the 800 MHz Band, WT Docket No. 02-55, Order, 29 FCC Rcd

2163, Appendix B (PSHSB 2014).

2 Request at 1-2.

3 Id. at 2.

4

Id.

5

Id.

6

Id.

7

Id.

1

image02-00.jpg612x792

Federal Communications Commission

DA 14-756

frequencies in the context of users in Mexico clearing these channels, as recommended by the 800 MHz

Transition Administrator (TA).8 Assuming Motorola delivers the SOW by July 15, San Diego and its

consultant will examine the migration plan for reprogramming, review the replacement frequencies,

evaluate co-channel and adjacent channel interference and testing protocols and prepare a plan to

implement San Diego’s responsibilities.9 Therefore, San Diego contends that it has justified an over two-

month extension of time within which to submit a cost estimate to Sprint Corporation and the TA.

III. DECISION

3.

Section 1.46(a) of the Commission’s rules states that “[i]t is the policy of the Commission

that extensions of time shall not be routinely granted.”10 The Bureau has emphasized that the “import of

that rule is especially relevant to 800 MHz rebanding where delay in rebanding by one licensee can cause

a ‘domino effect’ delay in the rebanding efforts of other licensees that have met the Commission’s 800

MHz band reconfiguration deadlines with a consequent delay of the overall program. We therefore afford

a high degree of scrutiny to the reasons licensees advance for extensions of time.”11

4.

We have applied the requisite high degree of scrutiny to San Diego’s Request and find that

San Diego has exercised diligence but has been prevented from preparing its cost estimate for submission

to Sprint Corporation and the 800 MHz Transition Administrator by the lack of a timely SOW and cost

proposal from Motorola.12 Motorola’s delay in providing its SOW and cost proposal is a matter

apparently outside San Diego’s control. We remain concerned that Motorola, the vendor for many

Mexico border area U.S. licensees, is the source of delay underlying several requests for extension of time

by rebanding licensees.

5.

It is problematic whether San Diego actually requires one month to review, revise if

necessary, and accept the Motorola SOW. Some of the effort that San Diego describes would appear to

be capable of being done in advance of the Motorola SOW, e.g., the review of replacement frequencies,

the evaluation of interference and the establishment of testing protocols. Nonetheless, we recognize that

the size of San Diego’s system and its interoperability with other systems make its reconfiguration

complex. Therefore, we are granting its Request with the understanding that we do not contemplate

further extensions of time for this licensee absent compelling and unforeseeable reasons.

IV. ORDERING CLAUSES

6.

Accordingly IT IS ORDERED, that the Further Request for Extension of Time to Submit

Cost Estimate for Frequency Reconfiguration, submitted May 28, 2014 by the City of San Diego,

California, IS GRANTED.

7.

IT IS FURTHER ORDERED, that the City of San Diego, California shall file a cost estimate

8

Id.

9 Id. at 2-3.

10 47 C.F.R. § 1.46(a).

11 Regents of the University of California, WT Docket No. 02-55, Order, 28 FCC Rcd 15920, 15921 (PSHSB

2013).

12 See, e.g., Improving Public Safety Communications in the 800 MHz Band, WT Docket No. 02-55, Order, DA

14-623 (PSHSB rel. May 9, 2014) (Granting Orange County, California an extension of time to submit a cost

estimate for the reconfiguration of the County’s 800 MHz communications system).

2

image03-00.jpg612x792

Federal Communications Commission

DA 14-756

with Sprint Corporation and the 800 MHz Transition Administrator on or before August 15, 2014.

8.

IT IS FURTHER ORDERED that, if the City of San Diego, California fails to file a cost

estimate with Sprint Corporation and the 800 MHz Transition Administrator by August 15, 2014, it shall

file a further request for extension of time within which to do so, in which the City of San Diego,

California, sets forth its efforts to comply with the instant Order, being specific as to dates and

descriptions of those efforts.

9.

This action is taken under delegated authority pursuant to Sections 0.191(a) and 0.392 of the

Commission's Rules, 47 C.F.R. §§ 0.191(a), 0.392.

FEDERAL COMMUNICATIONS COMMISSION

Michael J. Wilhelm

Deputy Chief, Policy and Licensing Division

Public Safety and Homeland Security Bureau

3

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.