Skip Navigation

Federal Communications Commission

English Display Options

Commission Document

Closure of Wireline Competition Bureau Cost Model Virtual Workshop

Download Options

Released: July 24, 2013

PUBLIC NOTICE

Federal Communications Commission

News Media Information 202 / 418-0513

445 12th St., S.W.

Internet: http://www.fcc.gov

Washington, D.C. 20554

TTY: 1-888-835-5322

DA 13-1635

Released: July 24, 2013

WIRELINE COMPETITION BUREAU ANNOUNCES CLOSING OF THE BUREAU'S

COST MODEL VIRTUAL WORKSHOP

WC Docket No. 10-90

Today, the Wireline Competition Bureau (Bureau) announces the closing of the Bureau's
Connect America Cost Model (CAM) virtual workshop.
In October 2012, the Bureau announced the commencement of the virtual workshop to
solicit input and facilitate discussion on topics related to the development and adoption of the
forward-looking cost model for Connect America Phase II.1 We sought comment on 28 different
topics in the virtual workshop over the course of ten months.2 Filings in the virtual workshop
through July 17, 2013 have been submitted into the above-captioned docket.3
The Bureau has not yet finalized and adopted a cost model. Parties should submit any
additional input regarding the model development, including any follow-up commentary to topics
that have been previously posted in the virtual workshop, in WC Docket No. 10-90. Any additional
questions will be raised through Public Notice.
For additional information on this proceeding, contact Katie King (Katie.King@fcc.gov) of
the Wireline Competition Bureau, Telecommunications Access Policy Division, (202) 418-7400.
- FCC -


1 Wireline Competition Bureau Announces Commencement of Connect America Phase II Cost Model Virtual
Workshop
, WC Docket Nos. 10-90, 05-337, Public Notice, 27 FCC Rcd 11977 (Wireline Comp. Bur. 2012);
see also Wireline Competition Bureau Announces Connect America Phase II Cost Model Virtual Workshop,
WC Docket Nos. 10-90, 05-337, Public Notice, 27 FCC Rcd 11056 (Wireline Comp. Bur. 2012).
2 See WCB Cost Model Virtual Workshop 2012, http://www.fcc.gov/blog/wcb-cost-model-virtual-workshop-
2012 (last visited July 22, 2013).
3 Letter from Michael Jacobs, Legal Advisor to the Chief, Wireline Competition Bureau, FCC, to Marlene H.
Dortch, Secretary, FCC, WC Docket No. 10-90 (filed Feb. 6, 2013); Letter from Jamie Susskind, Legal
Advisor to the Chief, Wireline Competition Bureau, FCC, to Marlene H. Dortch, Secretary, FCC, WC Docket
No. 10-90 (filed Mar. 27, 2013); Letter from Michael Jacobs, Legal Advisor to the Chief, Wireline
Competition Bureau, FCC, to Marlene H. Dortch, Secretary, FCC, WC Docket No. 10-90 (filed Apr. 30,
2013); Letter from Michael Jacobs, Legal Advisor to the Chief, Wireline Competition Bureau, FCC, to
Marlene H. Dortch, Secretary, FCC, WC Docket No. 10-90 (filed June 25, 2013); Letter from Michael Jacobs,
Legal Advisor to the Chief, Wireline Competition Bureau, FCC, to Marlene H. Dortch, Secretary, FCC, WC
Docket No. 10-90 (filed July 22, 2013).

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.