Dear Ms. Minea:
On June 12, 2012, EchoStar Broadcasting Corporation (EBC) filed the above-captioned
application to modify its fixed earth station to add the DBSD G-1 (S2651) space station
operating at the 92.85 orbital location as a point of communication. EBC's narrative
statement indicates this modification is required to allow EBC to provide telemetry,
tracking, and control for the DBSD G-1 space station using C-band frequencies for
limited emergency or contingency operations, should the need arise, and for periodic
reliability testing. We dismiss the application as defective without prejudice to re-filing.1
Section 25.112(a)(1) of the Commission's rules, 47 C.F.R. 25.112(a)(1), requires the
Commission to return, as unacceptable for filing, any earth station application that is not
substantially complete, that contains internal inconsistencies, or that does not
substantially comply with the Commission's rules. EBC application is not complete for
the reasons stated below.
In response to item E18 of Schedule B, EBC indicates that a frequency
coordination report is not required for its proposed modification to its C-band
operations. However, Section 25.203(c) of the Commission's rules requires all
earth station applicants to complete frequency coordination if the earth station
will operate in frequency bands shared with terrestrial services on a co-primary
basis such as in the 3700-4200MHz and 5925-6425 MHz bands. If EBC chooses
to refile, it must include a frequency coordination report with its application.


1
If EchoStar Broadcasting Corporation re-files an application identical to the one dismissed, with the
exception of supplying the corrected information, it need not pay an application fee. See 47 C.F.R.
1.1111(d).

Federal Communications Commission DA 13-1581

EBC did not complete items E28 through E60 of Schedule B to the FCC Form
312 relating to the particulars of the proposed operations as required by section
25.130 (a)(1) of the Commission's rules, 47 C.F.R. 25.130(a)(1).
Accordingly, pursuant to Section 25.112(a)(1) of the Commission's rules, 47 C.F.R.
25.112(a)(1), and Section 0.261(a)(4) of the Commission's rules on delegations of
authority, 47 C.F.R. 0.261(a)(4), we dismiss the application of EchoStar Broadcasting
Corporation without prejudice to re-filing.
Sincerely,
Paul E. Blais
Chief, Systems Analysis Branch
Satellite Division
International Bureau
Cc: STEPTOE & JOHNSON LLP
Pantelis Michalopoulos
1330 Connecticut Ave, N.W.
Washington, DC 20036
pmichalopoulos@steptoe.com
2

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.