Skip Navigation

Federal Communications Commission

English Display Options

Commission Document

FCC Proposes to Remove Barriers to Wireless Infrastructure

Download Options

Released: September 26, 2013

NEWS
Federal Communications Commission

News Media Information 202 / 418-0500

445 12th Street, S.W.

Internet: http://www.fcc.gov

Washington, D. C. 20554

TTY: 1-888-835-5322

This is an unofficial announcement of Commission action. Release of the full text of a Commission order constitutes official acti on.
See MCI v. FCC. 515 F 2d 385 (D.C. Circ 1974).

FOR IMMEDIATE RELEASE:

NEWS MEDIA CONTACT:

September 26, 2013
Cecilia Sulhoff: (202) 418-0587
Email: cecilia.sulhoff@fcc.gov

FCC PROPOSES TO REMOVE BARRIERS TO WIRELESS INFRASTRUCTURE

Washington, D.C. As the Nation's demand for wireless broadband service continues to grow at a rapid
pace, the Federal Communications Commission continues its work to remove barriers to the deployment of
infrastructure that supports such service.
Today the Commission adopted a Notice of Proposed Rulemaking (NPRM) initiating a review of its wireless
infrastructure policies. The NPRM builds upon the Broadband Acceleration Initiative, including a 2011
Notice of Inquiry seeking comment on measures needed to reduce obstacles to obtaining access to rights-of-
way and locations for wireless facilities.
Specifically, the NPRM seeks comment on:
Streamlining the environmental and historic preservation review processes for newer technologies,
including small cells and distributed antenna systems;
Removing barriers to the deployment of temporary towers, that are used in cases of emergencies or
to add capacity during short term events;
The meaning of terms included in a provision of the Middle Class Tax Relief and Job Creation Act
of 2012 which states "a State or local government may not deny, and shall approve, any eligible
facilities request for a modification of an existing wireless tower or base station that does not
substantially change the physical dimensions of such tower or base station;" and
Clarification of issues addressed in the Commission's "shot clock" order which set time periods for
state and local governments to complete review of wireless siting applications.
Increasing certainty in the FCC's processes and removing barriers to infrastructure deployment will spur
public and private investment, while expanding wireless coverage and capacity throughout the Nation.
For more information on the FCC's infrastructure rules and processes see:
www.fcc.gov/encyclopedia/tower-and-antenna-siting.
Action by the Commission September 26, 2013, by Notice of Proposed Rulemaking (FCC 13-122). Acting
Chairwoman Clyburn, Commissioners Rosenworcel and Pai with Acting Chairwoman Clyburn,
Commissioners Rosenworcel and Pai issuing statements.
WT Docket No. 13-238
FCC
For more news and information about the FCC please visit: www.fcc.gov.

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.