Released: May 28, 2014
image01-00.jpg612x792

Federal Communications Commission

Washington, D.C. 20554

May 28, 2014

DA 14-725

Samuel L. Feder

Jenner & Block LLP

1099 New York Ave, NW

Suite 900

Washington, DC 20001

Monica Gambino

Crown Castle International Corp

2000 Corporate Drive

Canonsburg, PA 15317

Re: Call Sign WPYQ831; FCC File No. 0005438821 (OP LLC Request for a Limited Extension

or Waiver of the Section 27.14 Substantial Service Deadline for the 1670-1675 MHz Band);

FCC File No. 0005964295 (OP LLC Construction Notification); FCC File No. 0005852832

(OP LLC Renewal Application)

Dear Mr. Feder and Ms. Gambino:

For the reasons stated below, the Wireless Telecommunications Bureau (Bureau) grants OP LLC

(OP)1 a waiver and extends for two years, until October 1, 2015, the current deadline to complete

construction of its nationwide 1670-1675 MHz Band license, Call Sign WPYQ831 (the License). In

addition, the Bureau dismisses without prejudice OP’s initial construction notification and conditionally

grants OP’s renewal application.

OP holds a nationwide 5 MHz license for the 1670-1675 MHz Band. Pursuant to Section 27.14

of the Commission’s rules, OP must make a showing of “substantial service” in its license area within 10

years of its license grant, i.e., by October 1, 2013.2 Initially, on October 9, 2012, OP filed a request for a

three-year extension or waiver of its construction deadline.3 The Extension Request relied on a plan by

OP’s current de facto transfer lessee, One Dot Six Corp., an affiliate of LightSquared (LightSquared),4 to

use the spectrum as part of a nationwide, terrestrial broadband network.5 At that time, OP argued that a

three-year extension of the construction deadline was warranted based on LightSquared’s proposed

1 OP is an indirect subsidiary of Crown Castle International Corp. (Crown Castle).

2 See 47 C.F.R. §§ 27.13(e), 27.14(a).

3 FCC File No. 0005438821 OP LLC Request for a Limited Extension or Waiver of the Section 27.14 Substantial

Service Deadline for the 1670-1675 MHz Band (Oct. 9, 2012) (Extension Request).

4 Call sign WPYQ831 was previously leased to a predecessor of LightSquared. Extension Request at 2.

5 Extension Request at 2. OP states that Crown Castle originally planned to use the License to deploy advanced

services and to this end invested “tens of millions of dollars in a mobile video service.” Id.

image02-00.jpg612x792

May 28, 2014

DA 14-725

Page 2 of 5

plans.6

On November 5, 2012, the Bureau placed the Extension Request on Public Notice for comment.7

No substantive comments were received.

On September 30, 2013, OP filed: 1) a construction notification for the License purporting to

demonstrate that it had achieved substantial service for the License based on LightSquared’s actual

construction of a Digital Video Broadcast for Handheld (DVB-H) network;8 and 2) an application for

renewal of the License.9 OP, via LightSquared, later supplemented its construction showing on March

19, 2014.10

In support of its substantial service showing, OP states that its de facto transfer lessee11

constructed a DVB-H network using the License to provide one-way mobile video service.12 OP states

that the DVB-H network is comprised of 59 transmitters,13 deployed at a total capital investment of $7

million, and operated at a cost approximately $1 million annually.14 As of the date of its Construction

Notification, OP states that it covered approximately 88.5 million people, or 28.3 percent of the United

States population.15 Further, OP notes that approximately 16 percent of the network’s predicted

geographic coverage area is rural.16

OP states that the DVB-H network is used to provide one-way video service to LightSquared’s

existing Mobile Satellite Service (MSS) subscribers.17 According to OP, subscribers use mobile receivers

paired with one of three external antennas to receive service.18 OP states that LightSquared has been

rolling out this service as an add-on offering via its current network of distributors.19

OP further states

that LightSquared’s customer base includes “a variety of business and governmental end users with

6 Extension Request at 1.

7 See Wireless Telecommunications Bureau Seeks Comment on Request By OP LLC For Extension or Waiver of the

Construction Deadline Concerning its 1670-1675 MHz Band License, Public Notice, 27 FCC Rcd 13524 (2012).

8 FCC File No. 0005964295 OP LLC Construction Notification (Sept. 30, 2013) (Construction Notification).

9 FCC File No. 0005852832 OP LLC Renewal Application (Sept. 30, 2013) (Renewal Application).

10 Letter from Jeffery J. Carlisle, Executive Vice President, Regulatory Affairs and Public Policy, LightSquared, to

Marlene H. Dortch, Secretary, Federal Communications Commission (Mar. 19, 2014) (Construction Supplement).

11 Pursuant to the Commission’s rules, OP may rely on its de facto transfer lessee to meet its substantial service

requirement. See 47 C.F.R. § 1.9030(d)(5)(i).

12 Construction Notification at 1; Construction Supplement at 1.

13 According to OP, each DVB-H transmitter station is equipped with an Axcera transmitter and a Kathrein omni or

directional transmitting antenna. Construction Notification at 2.

14 Construction Supplement at 2. At the time it filed the Construction Notification, LightSquared had deployed 51

transmitter sites. Construction Notification at 1-2.

15 OP notes that with the addition of 8 transmitters since the filing of the Construction Notification, its coverage is

more extensive today.

16 Construction Supplement at 2.

17 Construction Notification at 1; Construction Supplement at 1.

18 Construction Supplement at 2.

19 Construction Notification at 3.

image03-00.jpg612x792

May 28, 2014

DA 14-725

Page 3 of 5

specialized service needs, who are managed and serviced directly by a variety of intermediate entities to

which LightSquared wholesales MSS capacity.”20 OP notes that LightSquared’s MSS subscribers have

used its MSS service over the past year within the coverage areas of each of the 59 deployed

transmitters.21

A waiver may be granted, pursuant to 1.925 of the Commission’s rules, if the petitioner

establishes that: 1) the underlying purpose of the rule would not be served or would be frustrated by

application to the instant case, and that grant of the waiver would be in the public interest; or 2) where the

petitioner establishes unique or unusual factual circumstances, that application of the rule would be

inequitable, unduly burdensome or contrary to the public interest, or the applicant has no reasonable

alternative.22

As an initial matter, we are not persuaded that OP’s current level of construction and coverage

(through its de facto transfer lessee) should be construed as “substantial service.” Substantial service is

defined as “service that is sound, favorable, and substantially above a level of mediocre service that might

minimally warrant renewal.”23 OP’s License in the 1670-1675 MHz Band authorizes nationwide

operation. While LightSquared uses the License to offer add-on, one-way video service to its existing

MSS customer base, LightSquared’s service coverage in the 1670-1675 MHz Band to this point has been

focused on select urban markets, resulting in coverage to only 28.3 percent of the U.S. population. Based

on the information provided in the Construction Notification, there is no or extremely limited coverage in

23 out of the 50 states (and Washington, DC). This low overall population coverage under a nationwide

authorization is insufficient to demonstrate substantial service. OP further notes that LightSquared’s

DVB-H system covers approximately 11,000 square miles of rural area, representing 16 percent of the

geographic area covered by its constructed transmitters.24 However, we also do not believe that the

limited level of rural coverage, resulting from the construction of transmitters in exclusively urban areas,

merits a finding of substantial service. As reflected in the Commission’s 16th Mobile Competition Report,

under our rural definition, roughly 59 million people, or 19 percent of the U.S. population, live in rural

counties.

These counties comprise 3.1 million square miles, or 86 percent of the geographic area of the

United States.25 Accordingly, we estimate LightSquared’s rural coverage in the 1670-1675 MHz Band to

be approximately 0.35 percent of the rural square miles of U.S. geography. While licensee’s have

flexibility in determining where to provide coverage and service offerings, we would expect construction

20 Construction Supplement at 1.

21 Id.

22 47 C.F.R. § 1.925. The Commission has stated that, in situations in which the circumstances are unique and the

public interest would be served, it would consider waiving construction requirements on a case-by-case basis. See

Amendment of the Commission’s Rules To Establish New Personal Communications Services, GEN Docket No.

90-314, Memorandum Opinion and Order, 9 FCC Rcd 4957, 5019 (1994) (PCS MO&O), citing WAIT Radio v.

FCC, 418 F.2d 1153 (D.C. Cir. 1969).

23 47 C.F.R. § 27.14(a).

24 Construction Supplement at 2.

25 Implementation of Section 6002(b) of the Omnibus Budget Reconciliation Act of 1993 Annual Report and

Analysis of Competitive Market Conditions With Respect to Mobile Wireless, Including Commercial Mobile

Services, Sixteenth Report, 28 FCC Rcd 3700, 3939, ¶ 387 (2013).

image04-00.jpg612x792

May 28, 2014

DA 14-725

Page 4 of 5

of the License, a nationwide authorization, to be more robust at the ten-year construction deadline.

Accordingly, we dismiss without prejudice OP’s Construction Notification.26

Although we do not accept OP’s substantial service showing, we are encouraged with

LightSquared’s progress to date in deploying a system that provides additional services to its MSS

customer base. Accordingly, consistent with our prior decision in NRTC, we find that a waiver to extend

for two years the deadline for OP to meet its construction requirement is warranted in the public interest,27

and that the underlying purpose of the rule would be frustrated absent such relief. As in NRTC, OP holds

a nationwide license, for which it has undertaken construction of (via its de facto transfer lessee) a

network, and provides actual service to customers.28

We recognize that wireless providers seek to

distinguish their services with value added offerings, and thus providing OP with an additional two years

to further develop its service offering is consistent with the Commission’s public interest goal of

promoting efficient use of the spectrum. Through its construction of 51 sites29 and a DVB-H mobile

video network covering 28.3% of the U.S. population,30 OP has demonstrated that it has and will continue

to put the licenses to effective use and will not warehouse the spectrum. As in NRTC, OP’s demonstrated

construction efforts, while not yet reaching a level of substantial service, warrant additional time for

further construction to meet our substantial service requirement.31 Accordingly, we grant a two-year

waiver of the 10-year construction deadline in Section 27.14 of our rules; OP’s 10-year construction

deadline is now October 1, 2015. In addition, we grant OP’s Renewal Application for the License,

conditioned on OP satisfactorily demonstrating substantial service by the end of its extended construction

deadline, October 1, 2015.32

Because we find that a waiver is warranted based solely on OP’s demonstrated progress with

LightSquared’s actual DVB-H network buildout, as reflected in OP’s Construction Notification, we need

not address the arguments in the Extension Request regarding LightSquared’s proposed terrestrial

26 See Wireless Telecommunications Bureau, Mobility Division Announces the Dismissal of 220 MHz Service

Phase II Construction Notifications, Public Notice, 19 FCC Rcd 18095 (WTB, Mobility Division 2004) (Extending

five-year construction deadline for certain 220 MHz Service licensees and dismissing related construction

notifications without prejudice).

27 See NRTC LLC Demonstration of Five-Year Construction Requirements and Request for Extension of

Construction Deadline, Order, 24 FCC Rcd 8656, 8660, ¶ 11 (Mobility Division, Wireless Telecommunications

Bureau 2009) (NRTC Order) (granting extension of five- and ten-year construction deadlines).

28 NRTC Order, 24 FCC Rcd at 8660, ¶ 11 (granting construction deadline extension where nationwide licensee had

constructed 395 sites across 17 states).

29 An additional 8 sites were constructed after the construction deadline. Construction Supplement at 1.

30 Construction Supplement at 2.

31 NRTC Order, 24 FCC Rcd at 8660, ¶ 11.

32 OP will be required to file a construction notification within 15 days of the extended October 15, 2015 deadline.

See 47 C.F.R. § 1.946 (d).

image05-00.jpg612x792

May 28, 2014

DA 14-725

Page 5 of 5

broadband wireless network.

However, this grant is without prejudice to OP demonstrating that

additional time to construct through its de facto lessee’s proposed terrestrial broadband wireless network

is warranted based upon material changes to facts and circumstances during this extension period.

Action taken pursuant to 47 U.S.C. §§ 154(i), 47 C.F.R. §§ 1.925, 27.14.

Sincerely,

Roger S. Noel

Chief, Mobility Division

Wireless Telecommunications Bureau

Federal Communications Commission

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.