Commission Document

Federal Communications Commission

DA 12-1965 

Before the

Federal Communications Commission

Washington, D.C. 20554

In The Matter of
)
)

State of New York
)
)

File Nos.  0005375295, 0005375296, 
Metropolitan Transportation Authority Police 
)
0005375297, 0005375298, 0005375299, 
Department
)
0005375301, 0005375302, 0005375303
)
0005375304
Request For Extended Implementation
)

ORDER

Adopted: December 6, 2012

Released: December 6, 2012

By the Deputy Chief, Policy and Licensing Division, Public Safety and Homeland Security Bureau:

I.

INTRODUCTION

1.
On November 16, 2012, the State of New York Metropolitan Transportation Authority 
Police Department (MTAPD) submitted a request for extension of “slow growth” authority for its new 
800 MHz communications system.1   MTAPD also requests waiver of Section 90.629 of the 
Commission’s rules2 which limits extended authorizations to five years (Waiver Request). On November 
30, 2012, we issued an Order approving the requested extension for one of MTAPD’s licenses:
WQCZ325.3  The instant Order approves the requested extensions for MTAPD’s remaining nine 
licenses.4 MTAPD proposes that, if the extension of its “slow growth” authority is granted, it will 
complete construction at all sites and its system will be fully operational, by January 31, 2017.5  For the 
reasons set out below, we find that MTAPD has shown good cause for grant of its requested waiver and 
extend the implementation date for the remaining nine licenses, to January 31, 2017.

II.

BACKGROUND

2.
Frequencies 808/853.2625 MHz and 808/853.8375 MHz were initially licensed to the 
MTAPD which assigned the frequencies to the New York State Office of Interoperable and Emergency 
Communications (New York), for use in the New York Statewide Wireless Network (SWN), a statewide 
                                                          
See Letter from Lieutenant Robert Howell, Metropolitan Transportation Police Department re Request for 
Extension of “Slow Growth” Authorization and Request for Waiver to the Extent Required (Nov. 16, 2012) (Waiver 
Request) attached to FCC File Nos. 0005375295, 0005375296, 0005375297, 0005375298, 0005375299, 
0005375300, 0005375301, 0005375302, 0005375303, and 0005375304 (filed Aug. 13, 2012 amended Nov. 16, 
2012).   
2 47 C.F.R. § 90.629 (applicants may request up to five years for constructing and placing a system into operation).
See State of New York and Metropolitan Transportation Authority/Police Department, Order, DA 12-1919 
(PSHSB PLD rel. Nov. 30, 2012).
4 The remaining nine licenses include: WQCY454, WQCZ321, WQCZ322, WQCZ323, WQCZ324, WQCZ326, 
WQCZ327, WQCZ328, and WQCZ329.
5 Waiver Request at 2.  MTAPD proposes to complete system construction in December 2015 and to be fully 
operational in January 2017.  Id.   

Federal Communications Commission

DA 12-1965  

system in which MTAPD would participate.6  The SWN was only partially constructed when New York, 
terminated the contract with the system vendor.7  The MTAPD successfully requested re-assignment of 
the channels but the relevant implementation period expires in December, 2012 leaving insufficient time 
for MTAPD to construct and activate its system.
3.
MTAPD represents that it has completed a preliminary design of its proposed system and 
has identified sites and calculated coverage from those sites.8  It estimates that the complete system will 
cost $110 million, $93 million of which is already committed, with the remainder to be provided in the 
Metropolitan Transit Authority’s 2015-2019 Capital Program.9  MTAPD has proposed a project timetable 
which contemplates the system will be fully operational in January, 2017.10

III.

DISCUSSION

4.
  Section 90.629 of the Commission’s rules governing extended implementation of 
proposed facilities makes no provision for extension of the five-year maximum construction period that 
the rule allows for.  The Commission’s limited construction periods are intended to deter “spectrum 
warehousing” whereby parties hold licenses to the exclusion of others that could sooner provide service.11  
Accordingly, in order to obtain its requested extension of its “slow growth” authority, MTAPD must 
justify waiver of Section 90.629.
5.
The Commission will grant a waiver request if the waiver proponent shows that: “(i) The 
underlying purpose of the rule(s) would not be served or would be frustrated by application to the instant 
case, and that a grant of the requested waiver would be in the public interest; or (ii) In view of unique or 
unusual factual circumstances of the instant case, application of the rule(s) would be inequitable, unduly 
burdensome or contrary to the public interest, or the applicant has no reasonable alternative.”12

IV.

DECISION

6.
Here, we analyze MTAPD’s waiver request with reference to the second prong of the 
waiver standard – whether there exist unique or unusual factual circumstances that would make strict 
application of Section 90.629 inequitable, unduly burdensome or contrary to the public interest.  
MTAPD’s assignment of its frequencies to the SWN, and SWN’s unforeseen need to cancel the contract 
for its partially constructed system constitute an unusual set of facts that would render strict application of 
the rule both burdensome and contrary to the public interest.  Denial of the waiver request would burden 
MTAPD because, absent the waiver, it would have to retain its existing communications system which 
MTAPD represents does not provide “public safety-grade” service.13  We find no evidence of spectrum 
                                                          
Id. at 1.
Id.
Id.
Id. at 2.
10 Id.
11 Cf. Amendment of Parts 1 and 90 of the Commission's Rules Concerning the Construction, Licensing, and 
Operation of Private Land Mobile Radio Stations, Notice of Proposed Rule Making, PR Docket No. 90-4815 FCC 
Rcd 6401 (1990).
12 47 C.F.R. § 1.925.  On waiver standards generally, see Northeast Cellular Telephone Co. v. FCC., 897 F.2d 1164, 
1166 (D.C. Cir. 1990)("[A] waiver is appropriate only if special circumstances warrant a deviation from the general 
rule and such deviation will serve the public interest.") citing WAIT Radio v. FCC., 418 F.2d 1153, 1157-59 (D.C. 
Cir. 1969). 
13 Waiver Request at 1.

Federal Communications Commission

DA 12-1965  

warehousing by MTAPD, it has funding assurances for the greater part of its new system,14 and MTAPD 
has presented a reasonable schedule for system completion.  Accordingly, there are adequate public 
interest grounds for grant of the requested waiver.

V.

ORDERING CLAUSES

7.
Accordingly, pursuant to the authority of Sections 0.191 and 0.392 of the Commission's 
rules, 47 C.F.R. §§ 0.191, 0.392; Section 4(i) of the Communications Act of 1934, as amended, 47 U.S.C. 
§ 154(i) and Section 1.925 of the Commission’s Rules, 47 C.F.R. § 1.925, IT IS ORDERED that the 
Request for Extension of “Slow Growth” Authorization and Request for Waiver to the Extent Required 
filed by the State of New York Metropolitan Transportation Authority Police Department on November 
16, 2012 IS GRANTED to the extent discussed herein.
8.
IT IS FURTHER ORDERED, that the extended implementation period for frequencies 
808/853.2625 MHz and 808/853.8375 MHz, authorized in Federal Communications Commission 
licenses, Call Signs WQCY454, WQCZ321, WQCZ322, WQCZ323, WQCZ324, WQCZ326, WQCZ327, 
WQCZ328, and WQCZ329 IS EXTENDED until January 31, 2017. 
9.
This action is taken under delegated authority pursuant to Sections 0.191 and 0.392 of the 
Commission’s rules, 47 C.F.R. §§ 0.191, 0.392.
FEDERAL COMMUNICATIONS COMMISSION
Michael J. Wilhelm
Deputy Chief, Policy and Licensing Division
Public Safety and Homeland Security Bureau
                                                          
14 Id. at 2.

Edoc Internal Id: 
317761
Released On: 
Wed, 2012-12-05 19:00
Published On: 
December 06 2012
Adopted Date: 
Wed, 2012-12-05 19:00
Edoc ID: 
DA-12-1965

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.