Dear Ms. Latif:
On July 15, 2013, New Cingular Wireless PCS, LLC (New Cingular Wireless) filed the
above-captioned application to add 100 Raysat antennas to its Fixed-Satellite Service
VSAT network authorization. Pursuant to Section 25.112(a)(1) of the Commission's
rules, 47 C.F.R. 25.112(a)(1), we dismiss the application as defective without prejudice
to re-filing.1
Section 25.112 of the Commission's rules, 47 C.F.R. 25.112, requires the Commission
to return, as unacceptable for filing, any earth station application that is not substantially
complete, contains internal inconsistencies, or does not substantially comply with the
Commission's rules. The deficiencies in New Cingular's application are as follows:
New Cingular Wireless lists the Total EIRP for all carriers in item E40 of
Schedule B to Form 312 as 41.7 dBW. This value is inconsistent with the value
of 6 Watts provided for the Total input power at antenna flange listed in item E38.
Based on a Total input power at antenna flange of 6 Watts, we calculate that the
Total EIRP for all carriers should be 37.78 dBW, not 41.7 dBW.2


1
If New Cingular Wireless re-files an application in which the deficiencies identified in this letter have
been corrected, but is otherwise identical to the one dismissed, it need not pay an application fee. See 47
C.F.R. 1.1111(d).
2
Total EIRP for all carriers (dBW) = 10 log10 (total input power at antenna flange) + antenna transmit
gain. Therefore, Total EIRP for all carriers (dBW) = 10 log10 (6W) + 30.0 dBi = 37.78 dBW. We also note
that if the application is re-filed with a corrected Total EIRP for all carriers, items E48 and E49 of Schedule
B must be corrected to correspond with the correct Total EIRP for all carriers.

Federal Communications Commission DA 13-1748

New Cingular Wireless did not submit a radiation hazard study, as required by the
underlined text included in item 28 of Form 312 and Section 1.1307(b) of the
Commission's rules, 47 C.F.R. 1.1307(b).
Accordingly, pursuant to Section 25.112(a)(1) of the Commission's rules, 47 C.F.R.
25.112(a)(1), and Section 0.261 of the Commission's rules on delegations of authority,
47 C.F.R. 0.261, we dismiss New Cingular Wireless's application without prejudice to
re-filing.
Sincerely,
Paul E. Blais
Chief, Systems Analysis Branch
Satellite Division
International Bureau
cc:
Michael P. Goggin
AT&T Mobility LLC
1120 20th Street, NW
Suite 1000
Washington, DC 20036
michael.p.goggin@att.com
2

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.