Commission Document

PSHSB Extends 700 MHz Narrowbanding Deadline for State of Louisiana

Download Options

Released: October 15, 2012

Federal Communications Commission

DA 12-1643

Before the

Federal Communications Commission

WASHINGTON, D.C. 20554

In the Matter of
)
)
State of Louisiana
)
PS Docket 06-229
)
WT Docket No. 96-86
Request for Waiver of the December 31, 2016
)
700 MHz Narrowbanding Deadline
)

ORDER

Adopted: October 15, 2012

Released: October 15, 2012

By the Chief, Public Safety and Homeland Security Bureau:

I.

INTRODUCTION

1.
On July 3, 2012, the State of Louisiana (Louisiana) filed a request for waiver1 of the
Federal Communications Commission’s (Commission’s) 700 MHz narrowbanding deadline, which
requires licensees in the 700 MHz public safety narrowband spectrum (769-775/799-805 MHz) to operate
using a channel bandwidth of no more than 6.25 kilohertz, or equivalent efficiency, by December 31,
2016.2 For the reasons discussed below, we grant Louisiana’s waiver request for an extension of the
deadline until December 31, 2024,3 as conditioned herein and subject to any action the Commission may
take on this matter in future proceedings.4

II.

BACKGROUND

2.
In 2006, Louisiana created a Statewide Interoperability Executive Committee (SIEC) to
establish and administer a statewide shared communication system to help protect life and property in the
state, which is particularly vulnerable to potentially disastrous weather events.5 The SIEC is comprised of
twenty voting members, fifteen of whom are representatives of local and first responder associations.6
The SIEC provides governance and oversees the development and maintenance of the Louisiana Wireless


1 Petition for Waiver of the Commission’s Rules, State of Louisiana, PS Docket No. 06-229 (filed July 3, 2012)
(Louisiana Petition).
2 47 C.F.R. § 90.535(d)(2).
3 Louisiana seeks an eight-year waiver of the deadline until December 31, 2024. See Louisiana Petition at 5.
4 Louisiana previously filed a petition for rulemaking seeking an extension of the narrowbanding deadline for all
700 MHz licensees from December 31, 2016 to December 31, 2024. See Petition for Rulemaking of the State of
Louisiana, RM-11577 (filed Oct. 5, 2009). In reaching the merits of Louisiana’s waiver request in this Order, we do
not prejudge the outcome of Louisiana’s petition for rulemaking. That petition will be addressed separately, and this
waiver is subject to the outcome of any broader proceeding that the Commission may undertake with respect to
Louisiana’s rulemaking petition.
5 Louisiana Petition at 2.
6 Id. For more information on the Louisiana SIEC, see http://gohsep.la.gov/interopmembers.aspx (last visited Sept.
12, 2012).

Federal Communications Commission

DA 12-1643

Information Network (LWIN), which operates on State and General Use channels in portions of the 700
MHz band designated for public safety narrowband use.7
3.
LWIN, which Louisiana estimates is the largest statewide public safety radio system in
the country, has 67,162 users from multiple public safety agencies within the state, which LWIN serves
from 118 sites.8 LWIN provides on-street portable radio coverage to approximately 95 percent of the
geographic area of the state and in-building coverage to approximately 95 percent of the nine largest
metropolitan areas of Louisiana.9 To date, Louisiana has spent $165 million on LWIN, including over $80
million of state general funding, for infrastructure, subscriber units, professional services, and other
costs.10 In order to make LWIN available to all relevant local users and to encourage migration to LWIN
from other existing systems that lack adequate interoperability, Louisiana funds 100 percent of LWIN’s
administration, maintenance, and operational costs, and does not charge fees to local first responder
agencies for access to LWIN.11
4.
In recent years, LWIN has enabled Louisiana to achieve a high level of interoperability
among participating jurisdictions.12 In anticipation of 2008’s Hurricane Gustav, for example, Louisiana
used LWIN to support evacuation of almost its entire coastline, and the LWIN system accommodated
over six million separate “push to talk” communications during a ten day period.13 After the BP Oil Spill
in 2010, Louisiana gave the United States Coast Guard access to LWIN and also connected LWIN to
other Gulf Region information networks to create a new system, GulfWIN, which provided the Coast
Guard with interoperable voice communications along the Gulf Coast from Corpus Christi, Texas to
Pensacola, Florida. In 2011, as part of the ten-year anniversary of the September 11 attacks, the
Department of Homeland Security publicly recognized the effectiveness of Louisiana’s LWIN system and
lauded Louisiana in one of five case studies where entities have achieved interoperability.14
5.
In support of its request for a waiver of the narrowbanding deadline until December 31,
2024, Louisiana states that it conducted an analysis of the potential cost of converting its network to the
Project 25 (P25) Phase II standards developed by the Telecommunications Industry Association (TIA) to
comply with the 6.25 kilohertz efficiency requirement.15 Based on this analysis, Louisiana estimates a
cost of $120,087,689 to narrowband its infrastructure by the December 31, 2016 deadline, including


7 Id. State and General Use channels for public safety entities are specified in 47 C.F.R. § 90.531(b)(5) and (6).
8 Id.
9 Id.
10 Id.
11 Id.
12 Id. at 3.
13 Id.
14 Id.
15 Id. at 5. P25, or Project 25, is a suite of standards for digital radio communications for use by North American
public safety agencies to enable interoperable communications with other agencies and mutual aid response teams
during emergencies. P25 Phase I is a Frequency Division Multiple Access (FDMA) digital technology that provides
one voice or data path in a 12.5 kilohertz channel. P25 Phase II is a Time Division Multiple Access (TDMA) digital
technology that provides two voice or data paths in a 12.5 kilohertz channel, thus meeting the 6.25 kilohertz
efficiency standard. See Project 25 Documents and Standards Reference, Public Safety Communications Research,
U.S. Department of Commerce – Boulder Laboratories (Jan. 18, 2012) at 2 available at
http://www.pscr.gov/outreach/p25dsr/menu_top/downloads/P25dsr.pdf.
2

Federal Communications Commission

DA 12-1643

software upgrades and hardware purchases and replacements.16 Louisiana further states that it would face
additional costs of $296,932,554 to conform its subscriber equipment to the Phase II standards, for a total
estimated cost of $417,020,243.17
6.
Louisiana contends that the above-described substantial investment to narrowband the
LWIN system will not yield commensurate spectral benefits in this case. Louisiana acknowledges the
Commission’s goal to promote efficient spectrum use and concedes that narrowbanding to 6.25 kilohertz
bandwidth would substantially increase the number of available 700 MHz channels in Louisiana.18
However, Louisiana claims that as part of the buildout of LWIN that it completed in January 2012, it
expanded channel capacity at every site where it expected LWIN to experience additional growth over the
next ten years.19 Therefore, Louisiana states, it has no near-term need for the additional spectrum
capacity that would flow from narrowbanding to 6.25 kilohertz channels.20 Louisiana also does not
believe that there will be demand for additional 700 MHz narrowband channels from other public safety
entities in Louisiana, because LWIN has enough capacity to meet their needs as well. Louisiana notes
that “[t]he overwhelming majority of [700 MHz] frequencies are licensed by the State on behalf of all the
users on LWIN,” and “there has not been a single public safety agency that has requested access to a 700
MHz General Use frequency outside of LWIN.”21 .
7.
Louisiana also contends that strict enforcement of the December 31, 2016 deadline could
cause public safety agencies in the Greater New Orleans region to leave the LWIN system, substantially
undermining LWIN’s ability to support statewide interoperability. Louisiana asserts that as a result of the
potential cost of complying with the narrowbanding mandate, the Greater New Orleans Region “may
leave LWIN and build a separate, incompatible 800 MHz radio system.”22 Were the New Orleans region
to convert to an 800 MHz system, Louisiana contends, interoperability would be seriously compromised
within this key region because LWIN users elsewhere in the state would no longer be able to interoperate
with their New Orleans-area counterparts.23 As a result, Louisiana argues, “the public’s best interest
would not be served as ability of first responders from cross jurisdictional boundaries to communicate
during times of emergencies would be severely diminished.”24
8.
Comments. On July 20, 2012, the Public Safety and Homeland Security Bureau (Bureau)
issued a Public Notice seeking comment on Louisiana’s Waiver Request.25 Comments were submitted by
Association of Public-Safety Communications Officials (APCO); the Arkansas Interoperable


16 Id.
17 Id.
18 Id. at 3.
19 Id.
20 Id. at 3-4. Louisiana notes that over the ninety days prior to the submission of its waiver requests, “LWIN has
experienced on average 10,684,089 push to talks per month, while only experiencing an average of 555 busies
which equates to a 99.9999% first time push to talk success rate” on the existing LWIN channels. Id. at 4.
21 Id. at 4.
22 Id. at 6.
23 Id.
24 Id.
25 See Public Safety and Homeland Security Bureau Seeks Comment on Requests for Waiver of the December 31,
2016 700 MHz Narrowbanding Deadline filed by State of Louisiana, Public Notice, PS Docket No. 06-229, 2012
WL 2952510 (rel. July 20, 2012) (Public Notice).
3

Federal Communications Commission

DA 12-1643

Communications Committee (Arkansas); the Brazos Valley Wide Area Communications System
(BVWACS); the State of Maryland Interoperability Program Management Office (Maryland); the
Regional Wireless Cooperative (RWC); and the City of Scottsdale, Arizona (Scottsdale).
9.
All commenting parties generally support Louisiana’s waiver request, though some
parties differ as to the scope of relief that should be granted.26 RWC and Scottsdale specifically support
granting Louisiana an extension of the 700 MHz narrowbanding deadline from December 31, 2016 “to a
date of December 31, 2020; or a yet to be determined date based upon certain criteria set forth by the
Commission.”27 Further, APCO encourages the Commission to amend Section 90.535 of the
Commission’s rules, which, if done, would “obviate the need for waiver requests from Louisiana and
similarly situated 700 MHz band licensees.”28 Maryland limits its support to Louisiana alone, and
questions whether a “blanket nationwide policy change to extend the date for spectrum efficiency of 700
MHz channels is an appropriate strategy.” Instead, Maryland suggests a “localized approach to spectrum
efficiency.”29 Maryland also urges the Commission to limit any Louisiana waiver to only 700 MHz State
Use channels, noting that “the filing does not differentiate those areas internal to Louisiana and areas in
the border where the State must share spectrum with neighbors.”30
10.
Arkansas expresses particular support for the waiver request. Arkansas notes that the two
states share not only a common border, but also have comparable weather vulnerabilities and similar
statewide communications networks.31 Further, Arkansas says that it and Louisiana “stand ready to
support one another in the event of a catastrophic event, as evidenced by the recent installation of
interoperability gateway equipment near the state border.”32 This equipment allows LWIN and the
Arkansas Wireless Information Network (AWIN) to be linked together and provide direct
communications between emergency operations centers in each state.33 Arkansas emphasizes that the
interoperability achieved by Louisiana would be jeopardized if Louisiana is forced to comply with the
narrowbanding deadline, and states that “[s]hould the Greater New Orleans Homeland Security region
abandon the LWIN system for a less expensive alternative, the impact to statewide interoperability would
be devastating.”34 Arkansas further notes that such action would be contrary to the Department of
Homeland Security’s goals for interoperability.35
11.
Several commenters argue that the priority placed on the public safety broadband
network and the delayed availability of 700 MHz spectrum has negatively impacted the 700 MHz
narrowband equipment market. BVWACS, for example, submits that “[a]ssuming that the nationwide


26 See Regional Wireless Cooperative (RWC) Comments at 2; City of Scottsdale, Arizona (Scottsdale) Comments at
1; State of Maryland Interoperability Program Management Office Comments (Maryland) at 2; Brazos Valley Wide
Area Communications System (BVWACS) Comments at 1; Arkansas Interoperable Communications Committee
(Arkansas) Comments at 2; APCO Comments at 3 (filed ex parte).
27 See RWC Comments at 4 and Scottsdale Comments at 1.
28 APCO Comments at 2.
29 Maryland Comments at 9.
30 Id. at 3.
31 Arkansas Comments at 1.
32 Id.
33 Id.
34 Id. at 2.
35 Id.
4

Federal Communications Commission

DA 12-1643

broadband network can be ready to fully incorporate mission-critical voice in ten years (2022), any 6.25
kHz narrowband voice equipment purchased in 2016 to meet the December 31, 2016 deadline would only
be 6 years old, thus becoming prematurely obsolete.”36 APCO agrees, submitting that because the
Commission made the 700 MHz spectrum available on June 17, 2009, “under the current rule, non-
compliant 6.25 kHz equipment in the 700 MHz band would have to be replaced long before the end of
normal equipment life-cycles (generally at least ten years from system deployment), at considerable
expense to cash-strapped state and local governments.”37 APCO also notes that “[q]uestions have also
been raised as to whether there will be competitive sources of standardized 6.25 kHz equipment available
in time to meet the 2016 deadline.”
12.
Some commenters echo Louisiana’s arguments about the high cost of replacement
equipment.38 RWC and Scottsdale both note that a large system such as Louisiana’s requires substantial
advance planning and coordination for an overhaul like narrowbanding, and that licensees are already
challenged to keep costs down in the face of reduced revenues.39 Additionally, BVWACS points out that
“[w]ith $ 7 billion of federal funds now dedicated to the broadband system, it seems unlikely that any
grant funding will be available to help licensees meet the 6.25 kHz narrowband deadline.”40
13.
Both RWC and Arkansas commend Louisiana for its efficient and effective allocation
and use of 700 MHz frequencies.41 Noting that Louisiana does not seem to be experiencing channel
congestion, Arkansas argues that “in areas of the nation where the spectrum is already being successfully
managed and there is no channel contention, it seems pointless to require this magnitude of a change
when the state and the citizens will not benefit from it.”42 However, Maryland notes that “[w]hile
Louisiana must be the master of its internal spectrum requirements, the inefficient use of spectrum in
border areas can adversely affect neighboring state governments that may have requirements for channels
necessitating the spectral efficiency for which the Commission’s rules were adopted.”43

III.

DISCUSSION

14.
Section 1.925 of the Commission’s rules states that to obtain a waiver of the
Commission’s rules, a petitioner must demonstrate either that: (i) the underlying purpose of the rule(s)
would not be served or would be frustrated by application to the present case, and that a grant of waiver
would be in the public interest;44 or (ii) in view of unique or unusual factual circumstances of the instant
case, application of the rule(s) would be inequitable, unduly burdensome, or contrary to the public
interest, or the applicant has no reasonable alternative.45 The applicant faces a high hurdle and must plead
with particularity the facts and circumstances that warrant a waiver.46


36 BVWACS Comments at 2.
37 APCO Comments at 2.
38 See RWC Comments at 4; Scottsdale Comments at 2; Arkansas Comments at 2.
39 RWC Comments at 4; Scottsdale Comments at 2.
40 BVWACS Comments at 1.
41 See RWC Comments at 4; Arkansas Comments at 2.
42 Arkansas Comments at 2.
43 Maryland Comments at 3.
44 47 C.F.R. § 1.925(b)(3)(i).
45 47 C.F.R. § 1.925(b)(3)(ii).
46 WAIT Radio v. FCC, 418 F.2d 1153, 1157 (D.C. Cir. 1969), aff’d, 459 F.2d 1203 (1973), cert. denied, 409 U.S.
(continued….)
5

Federal Communications Commission

DA 12-1643

15.
Based on the record before us, we find that Louisiana warrants waiver relief because it
has demonstrated that the underlying purpose of the 700 MHz narrowbanding deadline – to promote
spectrum efficiency and increase available capacity – would not be served by strict application to the
present case, and that a grant of the waiver would be in the public interest.47 Louisiana makes a
persuasive argument that it does not need additional 700 MHz capacity and that narrowbanding by the
2016 deadline would leave it “no better off than it is” because Louisiana’s recently completed expansion
included added channel capacity at every site where Louisiana expects LWIN to experience additional
growth.48 In addition, based on the record in this proceeding, we find it unlikely that other public safety
entities in Louisiana will require new 700 MHz channels created by narrowbanding in the near term. As
Louisiana points out, LWIN supports over 67,000 public safety users within the state and makes LWIN
channels available to all public safety agencies at no cost to the agencies. Thus, as Louisiana points out,
not a single public safety agency in Louisiana has requested access to 700 MHz General Use frequencies
outside of LWIN since the system was established.49
16.
We also find waiver relief to be in the public interest because it will ensure continued
statewide interoperability and enable the State’s largest homeland security region, Greater New Orleans,
to remain in the LWIN system. We agree with Louisiana that the possible breakaway of the Greater New
Orleans region from LWIN could have potentially detrimental consequences for interoperable
communications in an area that is at high risk for hurricanes and other emergencies that require highly
coordinated statewide and regional response. In this regard, we believe grant of the waiver is the best
means to preserve Louisiana’s significant achievement in building one of the most advanced statewide
interoperable systems in the nation.
17.
We note that while no commenter opposed Louisiana’s request, Maryland suggested that
we limit any relief in Louisiana to the 700 MHz state-licensed channels because “the filing does not
differentiate those areas internal to Louisiana and areas in the border where the State must share spectrum
with neighbors.”50 We decline to impose this limitation. While we are mindful that allowing continued
wideband operation by LWIN on all channels could give rise to issues with adjacent states, we note that
Arkansas, the only state bordering Louisiana that filed comments, supports the waiver grant, and that no
other state bordering Arkansas raised any objection to the waiver. However, we grant this waiver request
subject to the condition that Louisiana must cure any incidents of harmful interference that its operations
may cause to narrowbanded operations in neighboring jurisdictions in Arkansas, Texas, or Mississippi,
and conversely, Louisiana must accept interference to its operations from narrowbanded operations in
such neighboring jurisdictions. We further note that Louisiana must continue to abide by all applicable
regional planning and interstate coordination requirements in the deployment and operation of the LWIN
system.
18.
Finally, as noted above, a number of commenting parties urge the Commission to go
beyond Louisiana’s waiver request and re-evaluate the 700 MHz rules and narrowbanding deadlines as
they affect 700 MHz licensees nationwide, citing significant obstacles and changes in the 700 MHz
(Continued from previous page)


1027 (1972) (citing Rio Grande Family Radio Fellowship, Inc. v. FCC, 406 F.2d 664 (D.C. Cir. 1968)); Birach
Broad. Corp., Memorandum Opinion and Order, 18 FCC Rcd 1414, 1415 (2003).
47 See 47 C.F.R. § 1.925(b)(3)(i).
48 Louisiana Petition at 3, 6.
49 Id. at 4.
50 Maryland Comments at 3.
6

Federal Communications Commission

DA 12-1643

landscape since the narrowbanding deadline was set in 2002.51 However, because these comments
propose relief beyond that requested by the State of Louisiana, we do not address them here.52

IV.

ORDERING CLAUSES

19.
Accordingly, IT IS ORDERED that, pursuant to Section 4(i) of the Communications Act of
1934, as amended, 47 U.S.C. § 154(i), and Section 1.925(b)(3)(i) of the Commission’s rules, 47 C.F.R. §
1.925(b)(3)(i), the Request for Waiver associated with the captioned application filed by the State of
Louisiana on July 3, 2012, IS GRANTED, as conditioned to the extent described herein.
20.
We take this action under delegated authority pursuant to Sections 0.191 and 0.392 of the
Commission’s rules, 47 C.F.R. §§ 0.191, 0.392.
FEDERAL COMMUNICATIONS COMMISSION
David S. Turetsky
Chief
Public Safety and Homeland Security Bureau


51 See Arkansas Comments at 2; APCO Comments at 2; Maryland Comments at 8.
52 See note 4, supra.
7

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.