Skip Navigation

Federal Communications Commission

English Display Options

Commission Document

PUBLIC SAFETY AND HOMELAND SECURITY BUREAU APPROVES REGION 15 (IOWA) 700 MHZ REGIONAL PLAN

Download Options

Released: August 4, 2011

PUBLIC NOTICE

Federal Communications Commission

News Media Information 202 / 418-0500

445 12th St., S.W.

Internet: http://www.fcc.gov

Washington, D.C. 20554

TTY: 1-888-835-5322

DA 11-1355

August 4, 2011

PUBLIC SAFETY AND HOMELAND SECURITY BUREAU APPROVES

REGION 15 (IOWA) 700 MHZ REGIONAL PLAN

WT Docket No. 02-378

Introduction. On March 15, 2011, the Region 15 (Iowa)1 700 MHz Regional Planning
Committee (RPC) (Region 15) submitted a proposed 700 MHz Public Safety Plan (Plan) for General Use2
spectrum in the 769-775/799-805 MHz band for review and approval.3 For the reasons discussed below,
we approve the Region 15 700 MHz Plan.
Background. In 1998, the Commission established a structure to allow RPCs optimal flexibility
to meet state and local needs, encourage innovative use of the spectrum, and accommodate new and as yet
unanticipated developments in technology and equipment.4 Each of the fifty-five (55) RPCs is required to
submit its plan for the General Use spectrum.5 The Commission's role in relation to the RPCs is limited
to (1) defining the regional boundaries; (2) requiring fair and open procedures, i.e., requiring notice,
opportunity for comment, and reasonable consideration; (3) specifying the elements that all regional plans
must include; and (4) reviewing and accepting proposed plans (or amendments to approved plans) or
rejecting them with an explanation.6
On July 31, 2007, the Commission adopted a Second Report and Order revising the rules
governing wireless licenses in the 700 MHz band.7 The Commission adopted a plan for the 700 MHz


1 The Region 15 (Iowa) 700 MHz regional planning area includes all (99) counties in the State of Iowa and the Sac
and Fox Tribe of Mississippi in Iowa/Meskwaki (the 12 mile settlement covers 7,000 acres in two counties and
provides tribal schools, tribunal courts, and a police force to support 800 citizens).
2 The General Use spectrum is administered by RPCs and is licensed for public safety services on a site-by-site basis
in accordance with the relevant Commission-approved regional plan and frequency coordination.
3 See Letter from Leslie E. Fish, Chair, Region 15 (Iowa) 700 MHz Regional Planning Committee, to Federal
Communications Commission, Office of the Secretary, WT Docket No. 02-378 (filed March 15, 2011) (submitting
regional plan).
4 See Development of Operational, Technical and Spectrum Requirements for Meeting Federal, State and Local
Public Safety Agency Communication Requirements Through the Year 2010, WT Docket No. 96-86, First Report
and Order and Third Notice of Proposed Rulemaking,
14 FCC Rcd 152 (1998) (First Report and Order); Second
Memorandum Opinion and Order
, 15 FCC Rcd 16844 (2000). See also 47 C.F.R. 90.527.
5 See 47 C.F.R. 90.527. Each RPC must incorporate certain common elements into its 700 MHz plan. A list of
700 MHz RPCs and region activities is available at http://www.fcc.gov/pshs/public-safety-spectrum/700-MHz/.
6 First Report and Order, 14 FCC Rcd at 195 87.
7 Implementing a Nationwide, Broadband, Interoperable Public Safety Network in the 700 MHz Band; Development
of Operational, Technical and Spectrum Requirements for Meeting Federal, State and Local Public Safety

band to establish a nationwide, interoperable public safety broadband communications network for the
benefit of state and local public safety users. The Commission designated the lower half of the 700 MHz
public safety band for broadband communications (763-768/793-798 MHz) and consolidated existing
narrowband allocations in the upper half of the public safety 700 MHz band (769-775/799-805 MHz).
Plan Requirements. Each committee is required to submit its plan for the assignment of licenses
for General Use spectrum.8 Each regional plan must contain certain elements9 and must be coordinated
with adjacent regions.10 RPCs are expected to ensure that their committees are representative of all public
safety entities in their regions by providing adequate notice of all meetings, opportunity for comment, and
reasonable consideration of views expressed. Plans must include an explanation of how all eligible
entities within the region were given such notice.11 Plans should list the steps undertaken to encourage
and accommodate all eligible entities to participate in the planning process, such as holding meetings in
various parts of the region. In addition, a regional plan should describe outreach efforts made to tribal
governments.12
Regional plans may differ in approaches to spectrum planning and management. In particular,
some plans may make specific assignments to eligible public safety entities, while others may establish an
allotment pool approach based on political boundaries such as counties.13 However, all 700 MHz plans
submitted for review and approval must sufficiently address each of the common elements in the
Commission's regional plan requirements.14 RPCs also are encouraged to consider utilizing the
guidelines developed by the Public Safety National Coordination Committee (NCC).15
Review of the Region 15 700 MHz Plan. Region 15 convened its first meeting on May 29, 2002,
wherein it elected its chairman, and officers.16 The Plan, adopted by its members on April 12, 2010,17





Communications Requirements Through the Year 2010, PS Docket No. 06-229, WT Docket No. 96-86, Second
Report and Order
, 22 FCC Rcd 15289 (2007) (Second Report and Order).
8 See 47 C.F.R. 90.527, 90.531. The 700 MHz public safety band plan contains 24 MHz of spectrum for public
safety services at 763-775 MHz and 793-805 MHz, and the narrowband allocation is divided into several segments
by designated purpose: General Use, Interoperability, Secondary Trunking, State License, Low Power and Reserve
channels.
9 See 47 C.F.R. 90.527; see also First Report and Order, 14 FCC Rcd at 193-94 84.
10 See 47 C.F.R. 90.527; see also First Report and Order, 14 FCC Rcd at 190-96 77-89.
11 See First Report and Order, 14 FCC Rcd at 193-94 84. The Commission directed RPCs to promptly adopt
operating procedures that "ensure that all entities will be given reasonable notice of all committee meetings and
deliberations." Id. at 195 86.
12 Id. at 193-94 84.
13 See Plan, Appendix H - Region 15 Channel Allotment at 89-134 (Region 15 defines a county-like area to include
the geo-political boundaries of a given county plus 5 miles).
14 See 47 C.F.R. 90.527.
15 The NCC was a federal advisory committee established by the Commission in 1999 to address and advise the
Commission on operational and technical parameters for use of the 700 MHz public safety band. In addition, the
NCC was tasked with providing voluntary assistance in the development of coordinated regional plans, and
developed a Regional Planning Guidebook. Following the sunset of the NCC's charter on July 25, 2003, the
National Public Safety Telecommunications Council (NPSTC) agreed to continue to provide assistance to regional
planners. A copy of the 700 MHz Regional Planning Guidebook is available at the NPSTC website at
http://www.npstc.org/nccsubcom.jsp.
16 See Plan, Section 3.2 Operations of the Regional Planning Committee at 13.
2

includes By-laws,18 a detailed membership list,19 and meeting notices and summaries.20 The Plan
describes the procedures for requesting spectrum allotments,21 details the application review and scoring
process,22 outlines system implementation criteria and spectrum utilization.23 The Plan states that the
State of Iowa administers the state interoperability channels through its Statewide Interoperable
Communications Systems Board (ISICSB) and that the State will hold any required licenses to operate on
the interoperability frequencies.24 In addition, the Plan provides guidelines for use of the low power
channels,25 and notes that the Computer-Aided Pre-coordination Resource Database system (CAPRAD)
will be utilized to facilitate the application process.26 Finally, the Region 15 Chair has certified that all
planning meetings were open to the public, pursuant to 47 C.F.R. 90.531(a)(8).27
The Region 15 Plan pre-allocates the consolidated narrowband General Use spectrum by
county.28 The Plan was coordinated with all six adjacent regions to Region 15 including: Region 13
(Illinois), Region 22 (Minnesota), Region 24 (Missouri), Region 26 (Nebraska), Region 38 (South
Dakota), and Region 45 (Wisconsin).29





17 See Plan, Section 1.6 Development of the Plan at 7; see also, Plan, Section 2.1 Notification/Operation of the
Region at 7-8 (meeting notices were published by FCC public notice, and notifications were sent to the Sac and Fox
Tribe of the Mississippi in Iowa/Meskwaki, and a copy of the proposed Regional Plan).
18 See Plan, Appendix A Membership at 22-23.
19 See Plan, Appendix B By-Laws at 24-28.
20 See Plan, Appendix C Meeting Notifications and Summary of Meeting Minutes at 29-40.
21 See Plan, Section 3.1 Procedure for Requesting Channels at 8-10 (the RPC will hold an initial 90 day application
filing window immediately following Bureau approval of the Plan. Thereafter, all applications will be considered
on a first come, first served basis).
22 See Plan, Section 4.0 Priority Matrix at 14-16 (application evaluation matrix point system and scoring
categories, noting that the matrix will be used only in the event that spectrum allocation requests conflict and all
requests cannot be accommodated).
23 See Plan, Section 7.0 System Design/Efficiency Requirements at 17-20 (includes interference protection criteria,
spectrum efficiency standards, system implementation, and voice channel loading recommendations).
24 See Plan, Section 5.0 Interoperability at 16-17; see also Plan, Appendix G Table of 700 MHz Interoperability
Channels at 86-88 (includes Project 25 Common Air Interface and Interoperability Channel Technical Parameters).
25 See Plan, Section 3.5 Low Power Pool Channels at 12-14 (channels set aside for on-scene incident response
purposes using low power mobiles and portables).
26 See Plan, Section 8.1 Database Maintenance at 20 (Region 15 will continue to use and maintain the CAPRAD
database as a tool to perform spectrum allocations and will update the database as allocations are made and FCC
authorizations are granted).
27 Plan, Section 9 Certification at 21 (by the RPC Chair, that all planning committee meetings, including
subcommittee or executive meetings were open to the public).
28 See Plan, Appendix H Region 15 Channel Allotments at 89-134 (Region 15 defines a county-like area to include
the geo-political boundaries of a given county plus 5 miles).
29 See Plan, Appendix E Adjacent Region Concurrences at 62-67; see also Plan, Appendix F - Inter-regional
Dispute Resolution Agreements at 68-85.
3

On April 8, 2011, the Bureau released a Public Notice seeking comment on the Region 15 Plan.30
We received no comments. Based on our review of the plan, we conclude that it complies with FCC rules
and policies. Accordingly, pursuant to Section 4(i) of the Communications Act of 1934, as amended,
47 U.S.C. 154(i), and Section 1.102(b) of the Commission's rules, 47 C.F.R. 1.102(b), the Region 15
(Iowa) 700 MHz Public Safety Plan is APPROVED.
This action is taken under delegated authority pursuant to Sections 0.191 and 0.392 of the
Commission's rules, 47 C.F.R. 0.191, 0.392.
Action by the Chief, Policy Division, Public Safety and Homeland Security Bureau.
FCC


30 See Public Safety and Homeland Security Bureau Seeks Comments on Region 15 (Iowa) 700 MHz Regional
Planning Committee Proposed Public Safety Plan, WT Docket No. 02-378, Public Notice, 26 FCC Rcd 5185
(PSHSB 2011). Comments were due April 28, 2011, and reply comments were due May 9, 2011.
4

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.