ORAL ARGUMENT SCHEDULED FOR MAY 15, 2012
USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 1 of 105
BRIEF FOR APPELLEE
IN THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
NO. 11-1270
ROYCE INTERNATIONAL BROADCASTING COMPANY,
APPELLANT,
V.
FEDERAL COMMUNICATIONS COMMISSION
APPELLEE.
ON APPEAL OF AN ORDER OF THE FEDERAL
COMMUNICATIONS COMMISSION
AUSTIN C. SCHLICK
GENERAL COUNSEL
PETER KARANJIA
DEPUTY GENERAL COUNSEL
RICHARD K. WELCH
DEPUTY ASSOCIATE GENERAL COUNSEL
MAUREEN K. FLOOD
COUNSEL
FEDERAL COMMUNICATIONS COMMISSION
WASHINGTON, D.C. 20554
(202) 418-1740

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 2 of 105

CERTIFICATE AS TO PARTIES, RULINGS, AND RELATED CASES

1. Parties.
All parties, intervenors, and amici in this case are listed in the Brief of
Appellant.
2. Rulings under review.
Royce Int’l Broad. Co. Request for Additional Time to Construct New Unbuilt
Station KIEV(AM), Culver City, California,
23 FCC Rcd 9010 (2008) (JA ).
3. Related cases.
The Order on appeal has not previously been before this Court or any other
court, and counsel is not aware of any related case before this or any other
court.

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 3 of 105

TABLE OF CONTENTS

TABLE OF CONTENTS .................................................................................. i
TABLE OF AUTHORITIES .......................................................................... iii
GLOSSARY .................................................................................................... vi
JURISDICTION................................................................................................1
QUESTION PRESENTED ...............................................................................3
STATUTES AND REGULATIONS ................................................................3
COUNTERSTATEMENT OF THE CASE ......................................................3
COUNTERSTATEMENT OF THE FACTS....................................................5
I.
STATUTORY AND REGULATORY BACKGROUND.........................5
II. FACTUAL BACKGROUND ....................................................................9
A.
The Bureau’s Denial Of Royce’s Petition For Waiver Of
Rule 73.3598(a). ..................................................................................10
B.
Impact Of The KIEV(AM) Construction Permit On
Third-Party Applications For Radio Stations......................................16
C.
The Bureau’s Denial Of Royce’s Motion To File An
Application For Review. .....................................................................17
D.
The Order On Appeal. ........................................................................20
SUMMARY OF ARGUMENT ......................................................................22
ARGUMENT ..................................................................................................24
I.
THE STANDARD OF REVIEW IS HIGHLY
DEFERENTIAL.......................................................................................24
II. THE COMMISSION ACTED WITHIN ITS DISCRETION
IN DISMISSING ROYCE’S UNTIMELY APPLICATION
FOR REVIEW .........................................................................................25
i

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 4 of 105
III. THE COMMISSION PROPERLY CONCLUDED THAT
ROYCE WAS NOT ENTITLED TO A WAIVER OF THE
CONSTRUCTION DEADLINE .............................................................31
A.
Royce’s Zoning Problems Did Not Justify A Waiver And
Further Extension Of The KIEV(AM) Construction
Deadline...............................................................................................32
B.
The ITU Condition Does Not Entitle Royce To An
Extension Of The KIEV(AM) Construction Deadline. ......................35
C.
The Commission’s Application of Its Waiver Policy In
This Case Is Consistent With The Agency’s Precedent......................37
CONCLUSION ...............................................................................................43
ii

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 5 of 105

TABLE OF AUTHORITIES

CASES

21st Century Telesis Joint Venture v. FCC, 318 F.3d
192 (D.C. Cir. 2003)....................................................................................31
BDPCS, Inc. v. FCC, 351 F.3d 1177 (D.C. Cir.
2003)..................................................................................................... 31, 34
Bowman Transp., Inc. v. Arkansas-Best Freight
Sys., Inc., 419 U.S. 281 (1974)....................................................................26
Comcast v. FCC, 526 F.3d 763 (D.C. Cir. 2008)............................................42
Delta Radio, Inc. v. FCC, 387 F.3d 897 (D.C. Cir.
2004)............................................................................................................26
Environmentel, LLC v. FCC, 661 F.3d 80 (D.C. Cir.
2011)............................................................................................................38
ICC v. Bhd. of Locomotive Eng’rs, 482 U.S. 270
(1987) ............................................................................................................3
*
NetworkIP, LLC v. FCC, 548 F.3d 116 (D.C. Cir.
2008)............................................................................................... 26, 30, 31
Reuters LTD. v. FCC, 781 F.2d 946 (D.C. Cir.
1986)............................................................................................................31
Richman Bros. Records, Inc. v. FCC, 124 F.3d 1302
(D.C. Cir. 1997).............................................................................................3
Royce Int’l Broad. Co. v. FCC, 820 F.2d 1332
(D.C. Cir. 1987)...........................................................................................29
Sw. Bell Tel. Co. v. FCC, 116 F.3d 593 (D.C. Cir.
1997)..............................................................................................................2
Virgin Islands Tel. Corp. v. FCC, 989 F.2d 1231
(D.C. Cir. 1993)...........................................................................................31

ADMINISTRATIVE DECISIONS

*
1998 Biennial Regulatory Review – Streamlining of
Mass Media Applications, Rules, and Processes,
13 FCC Rcd 23056 (1998) ............................................................... 6, 7, 8, 9
iii

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 6 of 105
*
1998 Biennial Regulatory Review – Streamlining of
Mass Media Applications, Rules, and Processes,
14 FCC Rcd 17525 (1999) ....................................... 6, 7, 8, 9, 31, 32, 33, 39
Application of Indep. Commc’ns, Inc., 15 FCC Rcd
7080 (1999) .................................................................................................26
Application of RDH Ltd. P’ship, 6 FCC Rcd 4764
(1991) ..........................................................................................................27
Applications of Northwest Broad., Inc., Assignor,
and Western Pacific, Inc., Assignee, 6 Comm.
Reg. (P&F) 685 (1997)................................................................................26
Birach Broad. Corp., 23 FCC Rcd 3141 (2008) .............................................37
Clear Channel Broad. Licenses, Inc., 26 FCC Rcd
7153 (2011), pet. for rev. pending, Blakeney
Commc’ns, Inc. v. FCC
(D.C. Cir. No. 11-1203) .......................................25
Cram Commc’ns, LLC, 23 FCC Rcd 658 (2008)............................................37
Crystal Broad. Partners, 11 FCC Rcd 4680 (1996) .......................... 18, 25, 26
Florida Inst. of Tech. v. FCC, 952 F.2d 549 (D.C.
Cir. 1992).....................................................................................................29
Hancock Commc’ns, Inc., 10 FCC Rcd 13068
(1995) ..........................................................................................................29
Hoyt Sherman Place Foundation, 21 FCC Rcd
10760 (Media Bur. 2006) ............................................................................38
JNE Invs., Inc., 23 FCC Rcd 623 (2008) ........................................................37
Letter to Rebecca Duke, Esq., 18 FCC Rcd 5034
(Media Bur. 2003) .......................................................................................38
Meredith New Heritage Strategic Partners, L.P., 9
FCC Rcd 6841 (1994) .................................................................................18
MTD, Inc., 6 FCC Rcd 34 (1991)....................................................................25
Noble Syndications, Inc., 74 F.C.C. 2d 124 (1979) ........................................25
Regionet Wireless License LLC, 17 FCC Rcd 21263
(2002) ..........................................................................................................25
Texas Grace Commc’ns, 16 FCC Rcd 19167 (2001)................... 39, 40, 41, 42
iv

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 7 of 105

STATUTES AND REGULATIONS

5 U.S.C. § 706(2)(a) ........................................................................................23
47 U.S.C. § 155(c)(4) ......................................................................................24
47 U.S.C. § 155(c)(7) ........................................................................................2
47 U.S.C. § 301 .................................................................................................5
47 U.S.C. § 307 .................................................................................................5
47 U.S.C. § 309 .................................................................................................5
47 U.S.C. § 319(a).............................................................................................5
47 U.S.C. § 319(b).............................................................................................6
47 U.S.C. § 402(b).............................................................................................2
47 U.S.C. § 405(a)...........................................................................................34
*
47 C.F.R. § 1.115(d)....................................................................... 3, 17, 22, 24
47 C.F.R. § 1.46(a) ................................................................................... 18, 25
47 C.F.R. § 1.46(c) ............................................................................. 17, 20, 25
*
47 C.F.R. § 73.3598(a) ........................................... 7, 11, 23, 30, 31, 32, 36, 41
47 C.F.R. § 73.3598(b)............................................................................... 8, 42
47 C.F.R. § 73.3598(e) ......................................................................................7
* Cases and other authorities principally relied upon are marked with
asterisks.

v

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 8 of 105

GLOSSARY

Bureau
Federal Communications Commission Media
Bureau
Commission or FCC
Federal Communications Commission
LSP Levine/Schwab
Partnership
Ontario
Ontario Broadcasting LLC
Royce
Royce International Broadcasting Company
Stocker
Stocker Resources, Inc.
vi

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 9 of 105
IN THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
NO. 11-1270
ROYCE INTERNATIONAL BROADCASTING COMPANY,
APPELLANT,
V.
FEDERAL COMMUNICATIONS COMMISSION
APPELLEE.
ON APPEAL OF AN ORDER OF THE FEDERAL
COMMUNICATIONS COMMISSION
BRIEF FOR APPELLEE

JURISDICTION

The Federal Communications Commission (“FCC” or “Commission”)
released the Order on appeal on July 5, 2008. Royce Int’l Broad. Co. Request
for Additional Time to Construct New Unbuilt Station KIEV(AM), Culver
City, California, 23 FCC Rcd 9010 (2008) (JA ) (“Order”). Appellant
Royce International Broadcasting Company (“Royce”) sought administrative
reconsideration, thereby tolling the period within which Royce could seek

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 10 of 105
1
judicial review of the Order. The Commission’s Media Bureau (“Bureau”),
acting on delegated authority, dismissed Royce’s petition for reconsideration
of the Order on June 28, 2011. Royce Int’l Broad. Co. Request for Additional
Time to Construct New Unbuilt Station KIEV(AM), Culver City, California,
26 FCC Rcd 9249 (Media Bur. 2011) (JA ) (“Order on Reconsideration”).
Royce filed its notice of appeal in this Court on July 28, 2011. The Court has
jurisdiction to review the Commission’s 2008 Order, but not the Bureau’s
2
2011 Order on Reconsideration, under 47 U.S.C. § 402(b).

1 See, e.g., Sw. Bell Tel. Co. v. FCC, 116 F.3d 593, 596-597 (D.C. Cir.
1997).
2 In addition to the Commission’s 2008 Order, Royce purports to challenge
the Bureau’s 2011 Order on Reconsideration, Br. i, 3. That decision,
however, is not reviewable for two independent reasons. First, it merely
denied rehearing of matters decided in the 2008 Order. See ICC v. Bhd. of
Locomotive Eng’rs
, 482 U.S. 270, 280 (1987) (“[W]here a party petitions an
agency for reconsideration on the ground of ‘material error,’ i.e., on the same
record that was before the agency when it rendered its original decision, ‘an
order which merely denies rehearing of . . . [the prior] order is not itself
reviewable.’”) (citation omitted). Second, “the filing of an application for
review by the [full] Commission [is] ‘a condition precedent to judicial
review’ of a decision taken pursuant to delegated authority” by a subordinate
bureau of the FCC. Richman Bros. Records, Inc. v. FCC, 124 F.3d 1302,
1303 (D.C. Cir. 1997) (quoting 47 U.S.C. § 155(c)(7)). Thus, Royce cannot
judicially challenge the Bureau-level Order on Reconsideration because it
failed to exhaust its administrative remedies.
2

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 11 of 105

QUESTION PRESENTED

An FCC rule provides that any person aggrieved by an action taken by
the Commission’s staff under delegated authority may ask the full
Commission to review that action, but must do so within 30 days. 47 C.F.R.
§ 1.115(d). Royce failed to file an application for Commission review of a
Bureau action within the 30-day filing window. It subsequently sought leave
to file an application out-of-time, citing a misunderstanding with its attorney
as the reason for missing the deadline. In the Order on review, the
Commission denied Royce’s request for additional time and dismissed
Royce’s untimely application for review.
The question presented is whether the Commission lawfully exercised
its discretion when it denied Royce’s motion to file an application for review
out-of-time and dismissed Royce’s untimely application on procedural
grounds.

STATUTES AND REGULATIONS

The pertinent statutory provisions and regulations are set forth in the
addendum to this brief.

COUNTERSTATEMENT OF THE CASE

Applicants for FCC permits to construct radio stations must complete
construction of facilities within a period specified by the Commission. In this
case, Royce obtained a permit to construct an AM radio station in 1984, yet it
3

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 12 of 105
still has not initiated construction – let alone built a radio station. After
obtaining 12 extensions of its original construction deadline, in December
2001 (two weeks before its construction period was to expire), Royce
requested an additional three-year waiver of its construction deadline.
According to Royce, it was entitled to another extension because it had
encountered difficulties in obtaining zoning approval due to disagreements
with the owner of the property upon which Royce planned to construct its
broadcasting facilities. The FCC’s Media Bureau denied Royce’s request,
finding that such “run of the mill” zoning difficulties are not the type of rare
and exceptional circumstance that would justify another waiver of the
construction deadline.
Royce sought to take an administrative appeal of the Bureau’s decision
to the full Commission, but failed to file an application for review of the
Bureau’s action within the 30-day deadline specified by the FCC’s governing
rule. In a late-filed motion, Royce sought permission to file an application
for review out-of-time, citing a miscommunication with its attorney as the
reason for its tardiness. The Bureau denied Royce’s request, and dismissed
its untimely application for review.
In the Order on appeal, the Commission affirmed the Bureau’s
decision. The Commission explained that alleged miscommunications
4

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 13 of 105
between Royce and its own attorney provided no basis to extend the filing
deadline for seeking review of staff-level action. The Commission further
determined that granting Royce’s motion could prejudice two other
companies whose licensing proposals could not be considered until final
disposition of Royce’s construction permit. And, even if Royce’s application
for review were properly before the agency, the Commission explained that it
lacked merit because the routine zoning difficulties cited by Royce are not a
rare and exceptional circumstance that would justify a waiver of the
construction deadline.

COUNTERSTATEMENT OF THE FACTS

I.

STATUTORY AND REGULATORY BACKGROUND

The FCC is charged with licensing radio stations under the
Communications Act of 1934. See, e.g., 47 U.S.C. § 301. Station licenses
and construction permits are granted on written application, if the
Commission determines that “the public interest, convenience, and necessity
will be served” thereby. 47 U.S.C. §§ 307-309.
Section 319(a) of the Communications Act provides that “[n]o license
shall be issued … for the operation of any station unless a permit for its
construction has been granted by the Commission.” 47 U.S.C. § 319(a).
Pursuant to section 319(b), such construction permits “shall provide” that a
5

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 14 of 105
permit “will be automatically forfeited if the station is not ready for operation
within the time specified or within such further time as the Commission may
allow, unless prevented by causes not under the control of the grantee.”
47 U.S.C. § 319(b).
For many years, the FCC required permitees to complete construction
of radio stations within relatively short periods – i.e., 24 months to construct
a full-power television station and 18 months to construct other broadcast
facilities. Construction permits did not automatically expire at the end of
their specified construction period, and a permit was not deemed forfeited or
canceled until the Commission affirmatively acted to effectuate a forfeiture or
cancelation. See 1998 Biennial Regulatory Review – Streamlining of Mass
Media Applications, Rules, and Processes, 13 FCC Rcd 23056, 23087-88
(¶¶ 77-78) (1998) (“Streamlining Order”), recon. granted in part and denied
in part, Memorandum Opinion and Order, 14 FCC Rcd 17525 (1999)
(“Streamlining Reconsideration Order”) (together, the “Streamlining
Orders”).
This approach proved problematic. The Commission explained in
1998 that “applicants have in some instances filed for permits without taking
preliminary steps to ensure that they can begin – much less complete –
construction once an authorization is received.” Streamlining
6

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 15 of 105
Reconsideration Order, 14 FCC Rcd at 17539 (¶ 36). This “deprive[s] the
public of prompt initiation of additional broadcast service and represent[s] an
abuse of the Commission’s processes.” Id.
“[T]o address the warehousing of radio spectrum by permittees unable
or unwilling to build” (Order (¶ 3) (JA ) (citing Streamlining Order, 13 FCC
Rcd at 23087-88 (¶¶ 77-78))), the Commission in 1998 revised its rules
implementing section 319 of the Act. The revised rules expanded the
construction deadline to three years after the grant of the construction permit.
See 47 C.F.R. § 73.3598(a). If a permittee fails to complete construction by
the end of this period, the permit expires and is automatically forfeited
without further action by the Commission. See 47 C.F.R. § 73.3598(e);
Streamlining Order, 13 FCC Rcd at 23091 (¶ 89). The revised rules thus
“establish an incentive for all potential applicants to plan construction
carefully even prior to applying for a permit and, once a permit is received, to
bring to the construction process the same degree of urgency brought to other
business endeavors.” Streamlining Reconsideration Order, 14 FCC Rcd at
17539 (¶ 36). “[E]ven if the permittee encounters significant construction
difficulties,” the Commission found that the new “three-year construction
period,” should “allow sufficient time for a diligent permittee to complete
construction of a facility.” Streamlining Order, 13 FCC Rcd at 23088 (¶ 80).
7

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 16 of 105
The construction deadline in rule 73.3598(a) can be extended, or
“tolled,” but “only in limited circumstances directly preventing construction
and not within the applicant’s control,” including, for example, “natural
disasters.” Order (¶ 3) (JA ) (citing 47 C.F.R. § 73.3598(b)). A waiver of
the standard three-year construction deadline set forth in rule 73.3598(a) also
may be granted in “rare and exceptional circumstances other than those
delineated” in the Commission’s regulations. See Streamlining
Reconsideration Order, 14 FCC Rcd at 17541 (¶ 42). Only “[i]n these very
limited circumstances … will [the Commission] entertain requests for
waiver.” Id.
Zoning delays – and, as relevant here, a permittee’s difficulties
obtaining initial zoning approval – generally do not trigger tolling or
constitute a “rare and exceptional” circumstance justifying a waiver of the
three-year construction deadline. Order (¶ 3) (JA ); Streamlining Order,
13 FCC Rcd at 23091 (¶ 86); Streamlining Reconsideration Order, 14 FCC
Rcd 17359-40 (¶¶ 37-38). The Commission specifically excluded zoning
from the tolling exceptions in rule 73.3598(b) based on its determination that
“[t]he three-year construction period” – which doubled the period to construct
a radio station (i.e., from 18 months to three years) – “provides ample time to
8

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 17 of 105
complete th[e zoning] process and construct the station or choose a new site
free from zoning difficulties.” Streamlining Order, 13 FCC Rcd at 23091
(¶ 86).
As the Commission has explained, “diligent permittees will not find
zoning difficulties to be an insurmountable problem because permittees can,
in the vast majority of cases, find a way to resolve zoning issues either by
securing an alternative site or obtaining necessary approvals.” Streamlining
Reconsideration Order, 14 FCC Rcd at 17539 (¶ 37). Moreover, “diligent
permittees can eliminate or mitigate zoning delays by applying for approval
from the pertinent local authorities prior to the issuance of a construction
permit.” Id., 14 FCC Rcd at 17540 (¶ 38).

II.

FACTUAL BACKGROUND

The Commission granted Royce a permit to construct KIEV(AM), a
new AM radio station to serve Burbank, California, on October 23, 1984. At
Royce’s request, the Bureau subsequently extended the station’s original
construction deadline (October 23, 1985) ten times after Royce sequentially
lost its original transmitter site, encountered difficulties obtaining local
approval to build at alternative sites, and initiated litigation concerning its
proposed transmitter site. Order (¶ 2) (JA ). Royce further benefitted from
two separate construction deadline adjustments made by the Commission to
9

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 18 of 105
ease existing permittees’ transition to the new, stricter construction rules
adopted in 1998. See id. (¶ 3 & n.7) (JA ). As a result, KIEV(AM)’s
original construction deadline cumulatively was extended to December 21,
2001. Id. (¶ 3).
On January 28, 2000, more than 15 years after Royce obtained its
construction permit, Royce applied to the FCC to change its community of
license from Burbank, California to Culver City, California. Id. (¶ 4) (JA ).
Stating that the transmitter tower site identified in its initial application had
become unavailable, Royce amended its application on August 6, 2001, to
specify a new tower location, this time in the City of Montebello, California,
on an operating oil field owned by Stocker Resources, Inc. (“Stocker”). Id.
Stocker already held a local use permit for one microwave tower and a
satellite dish on the site, which Royce planned to use in conjunction with
construction of new facilities. Id. The Bureau granted Royce’s application
on September 28, 2001. Id. The revised construction permit required Royce
to complete construction at the Stocker site by the existing construction
deadline (i.e., December 21, 2001). Id.

A. The Bureau’s Denial Of Royce’s Petition For Waiver Of

Rule 73.3598(a).

On December 7, 2001 – two weeks before the expiration of its then-17-
year-old construction permit – Royce sought a waiver of the construction
10

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 19 of 105
period rule (47 C.F.R. § 73.3598(a)) and a three-year extension of its
construction deadline. Order (¶ 5) (JA ). Royce, which conceded that it had
not yet sought zoning approval to construct on the Stocker property, predicted
that the zoning process could take at least another five months. Id. Royce
nonetheless argued that it was entitled to a waiver of rule 73.3598(a) due to
circumstances beyond its control. Id. According to Royce, its new
construction plans were hindered after the property manager who offered to
assist Royce left Stocker in June 2001, and his replacement refused to allow
Royce to begin construction until it obtained appropriate authorization from
the City of Montebello. Id.
The Bureau denied Royce’s waiver request on December 20, 2001.
See Letter from Chief, Audio Services Division, Mass Media Bureau, FCC, to
Andrew S. Kersting, Esq., Ref. No. 1800B3-GDG (Dec. 20, 2001) (“Dec. 20,
2001 Bureau Letter”) (JA ). The Bureau explained that problems associated
with initial zoning approval generally do not entitle a permittee to “additional
construction time under the Commission’s revised rules.” Order (¶ 6) (JA ).
And it found unpersuasive Royce’s proffered reasons for why it had been
unable to obtain local zoning approval. Id.
In the same decision, however, the Bureau temporarily waived Royce’s
construction deadline based on the FCC staff’s mistaken understanding that
11

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 20 of 105
the KIEV(AM) permit required approval from the International
3
Telecommunications Union (“ITU”). Order (¶ 6, n.19) (JA ). Believing
that ITU approval encumbered the KIEV(AM) construction permit, the
Bureau, on its own motion, stipulated that the permit “will expire 84 days
after receipt of approval from the [ITU] (equal to the 84 days between
conditional grant of KIEV’s major modification application and the permit’s
December 21, 2001 expiration).” Dec. 20, 2001 Bureau Letter at 4 (JA ).
Shortly thereafter, the Bureau learned that it had granted this waiver in
error. The FCC requests ITU approval for operations that may cause
interference in countries other than Mexico and Canada. Order (n.19) (JA ).
Because Royce’s construction permit affected only Mexican stations, and the
Mexican government cleared Royce’s proposal on November 8, 2001, there
was no need for ITU approval. Id. After discovering its mistake, the Bureau
promptly issued corrected decisions on January 8, 2002, and January 11,
2002, which removed the international condition from Royce’s construction
permit. See Letter from Chief, Audio Services Division, Mass Media Bureau,

3 The ITU is an international organization in which governments and the
private sector coordinate global telecom networks and services. The ITU
process allows ITU member states to coordinate use of radio frequency
spectrum to eliminate harmful interference between radio stations in different
countries.
12

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 21 of 105
FCC, to Andrew S. Kersting, Esq., Ref. No. 1800B3-GDG at 1 (Jan. 8, 2002)
(“Jan. 8, 2002 Bureau Letter”) (JA ); Letter from Chief, Audio Services
Division, Mass Media Bureau, FCC, to Andrew S. Kersting, Esq., Ref. No.
1800B3-1B at 4 (Jan. 11, 2002) (“Jan. 11, 2002 Bureau Letter”) (JA ). To
hold Royce harmless for the staff’s error, the Bureau “[i]n the interest of
fairness” also waived rule 73.3598(a) “to provide Royce with 84 days from
its current expiration date (until April 25, 2002) to complete construction.”
Jan. 11, 2002 Bureau Letter at 5 (JA ).
Despite having thereby obtained another extension of its construction
deadline, Royce sought reconsideration of the Bureau’s denial of its waiver
request. Relying on a January 23, 2002 letter from the City of Montebello,
Royce asserted that it could not have initiated zoning proceedings on its own
because the city “required written consent of the landowner to commence
zoning.” Order (¶ 7) (JA ). Royce then disclosed for the first time that
Stocker was unwilling to give its consent because the parties had not yet
13

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 22 of 105
resolved several issues concerning the location of the required transmitter
4
towers on Stocker’s property. See id. (¶ 7 & nn.22-23) (JA ).
The Bureau denied Royce’s petition on both procedural and substantive
grounds. Letter from Chief, Audio Division, Media Bureau, FCC, to Andrew
S. Kersting, Esq., Ref. No. 1800B3-IB/GDG (July 8, 2004) (“July 8, 2004
Bureau Letter”) (JA ). With respect to the petition’s procedural
deficiencies, the Bureau noted that reconsideration is appropriate only “when
a petitioner raises additional facts not known or not existing until after its last
opportunity to present such matters, or when there is a material error or
omission in the original action.” July 8, 2004 Bureau Letter at 3
(JA ) (citation omitted). The Bureau acknowledged that “each new
document” filed by Royce in support of its petition “is dated after our denial
of the waiver request.” Id. at 3 (JA ). But it explained that those filings
could not serve as grounds for reconsideration because “Royce offer[ed] no
evidence that such documents” – all of which concerned matters that
transpired before it filed its December 2001 waiver request – “could not have
been submitted with th[at] … request.” Id. at 4 (JA ).

4 Royce filed an application for a new use permit with the City of
Montebello on April 1, 2002. Order (¶ 8, n.27) (JA ). The City denied that
application because Royce was unable to obtain Stocker’s signature. Id.
(¶ 8) (JA ).
14

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 23 of 105
On the merits, the Bureau held that Royce had failed to “establish that
Montebello’s zoning processes are unique or even unusual so as to warrant an
exception to the general principle that initial zoning problems do not form a
basis for grant of additional construction time.” Id. at 4 (JA ). The Bureau
explained that “[a]n applicant must have reasonable assurance of the
availability of its specified tower location when it applies” for a construction
permit, and an applicant lacks such assurance “unless it contacts the local
authority prior to filing the construction permit application” with the
Commission. Id. Royce, by its own admission, “specified the Stocker tower
site in [its] August 2001 [modification application] but did not contact local
zoning authorities until January of 2002.” Id.
Separately, the Bureau rejected Royce’s claim that its construction
permit was “encumbered” because it required ITU approval. Id. at 6 (JA ).
The Bureau reiterated that the Commission’s International Bureau “notif[ied]
… the ITU about the particulars of Royce’s authorization … solely to update
that organization’s records,” not to seek that organization’s consent. Id.
Accordingly, the Bureau held that the ITU referral “forms no basis for
granting Royce additional time to construct.” Id.
15

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 24 of 105

B.

Impact Of The KIEV(AM) Construction Permit On

Third-Party Applications For Radio Stations.

Because Royce – since its original permit grant in 1984 – still had not
constructed any station facilities and had not received a waiver of its
extended construction deadline, its construction permit for KIEV(AM)
expired by its terms on April 25, 2002.
In January 2004, the Commission initiated a new auction for AM radio
station licenses. Order (¶ 9) (JA ). Royce and three other entities, including
the Levine/Schwab Partnership (“LSP”), filed mutually exclusive
applications to construct new radio stations in the Los Angeles area. Id.
None of these applications could co-exist with the (now-expired) KIEV(AM)
construction permit because they proposed to use radio frequency that could
5
interfere with the frequency assigned to KIEV(AM). Subsequently, in
November 2004, Ontario Broadcasting LLC (“Ontario”), licensee of

5 The Commission’s rules are designed to prevent broadcast stations from
interfering with one another. While a construction permit is outstanding, the
facilities specified in that permit are “protected” from interference as if those
facilities were in full operation. Other broadcasters operating on the same
frequencies (or adjacent frequencies) cannot alter their own facilities if doing
so would contravene the protection requirements. Likewise, the Commission
will not grant a new construction permit if it will cause interference with a
previously issued permit. Once a construction permit is forfeited, however,
the facilities specified in that permit are no longer entitled to interference
protection.
16

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 25 of 105
KSPA(AM), Ontario, California, filed an application proposing
improvements to KSPA(AM). Id. Due to concerns about interference posed
by the competing applications, the Bureau declined to act on the applications
“absent confirmation of [its] conclusion that the KIEV(AM) permit ha[d]
expired.” Id.

C. The Bureau’s Denial Of Royce’s Motion To File An

Application For Review.

The Bureau denied reconsideration of Royce’s waiver request on July
8, 2004, and released a public notice of that denial on July 13, 2004. Order
(¶ 10 & n.33) (JA ). Under the Commission’s rules, the deadline for filing
6
an application for review of that decision was August 12, 2004. Id. (¶ 10)
(JA ). Royce did not file an application for review by that date, however.
Instead, on August 17, 2004, Royce filed a motion to extend the filing
7
deadline to September 10. Id. Royce stated that it had retained new counsel

6 Applications for Commission review of actions taken on delegated
authority must be filed within 30 days of public notice, as that date is defined
in the Commission’s rules. 47 C.F.R. § 1.115(d).
7 Motions for extension of time generally must be filed at least seven days
prior to the filing deadline, except that the motion may be filed within the last
seven days if the party orally notifies parties and the Commission staff
responsible for acting on the motion that the motion has been or is being
filed. See 47 C.F.R. § 1.46(c). As described above, Royce failed to comply
with these requirements when it filed its motion five days after the deadline
had passed.
17

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 26 of 105
after discovering on August 10 (which Royce mistakenly believed was the
filing deadline) that its previous counsel had not filed an application for
review. Royce Int’l Broad. Co. Motion for Extension of Time at 1 (filed
Aug. 11, 2004) (JA ).
The extension, Royce asserted, would provide its
new counsel with sufficient time to prepare that application. Id. at 2 (JA ).
The Bureau denied Royce’s motion, finding no good cause to accept its
late-filed application for review. Letter from Chief, Audio Division, Media
Bureau, FCC, to Lauren A. Greenberg, Esq., Ref. No. 1800B3-IB/GDG at 1
(Aug. 20, 2004) (“Aug. 20, 2004 Bureau Letter”) (JA ). The Bureau
explained that “[m]otions for extension of time will not be routine[ly]
granted,” Aug. 20, 2004 Bureau Letter at 2, citing 47 C.F.R. § 1.46(a) (JA ),
and “[w]aiver of [a] filing deadline … is appropriate only where equities so
require and no party would be prejudiced thereby.” Id., citing Crystal Broad.
Partners, 11 FCC Rcd 4680, 4681 (1996). The Bureau “f[ound] no equities
in the instant matter.” Id. “Counsel” the Bureau reasoned, “is merely an
applicant’s agent,” so “[i]f counsel does not vigorously prosecute the
applicant’s interests, the applicant is ultimately responsible.” Id. The Bureau
further noted that Royce could have timely filed its application for review,
but did not, because Royce miscalculated the filing deadline. Id.
“Miscalculat[ing] … th[e] due date,” the Bureau explained, “does not
18

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 27 of 105
constitute good cause for granting Royce’s motion for acceptance of a late-
filed appeal.” Id. (citing Meredith New Heritage Strategic Partners, L.P.,
9 FCC Rcd 6841, 6842 (1994)).
Royce petitioned for reconsideration of the Bureau’s procedural ruling,
Order (¶ 10) (JA ), contending that no party would be prejudiced if the
Bureau accepted the late filing and further extended Royce’s construction
deadline. The Bureau disagreed, noting that granting Royce’s request would
further delay the Bureau’s consideration of Ontario’s pending request to
modify its facilities. Letter from Chief, Audio Division, Media Bureau, FCC,
to Lauren A. Greenberg, Esq., Ref. No. 1800B3-IB/GDG at 3 (Dec. 17, 2004)
(“Dec. 17, 2004 Bureau Letter”) (JA ). The Bureau thus denied Royce’s
request, concluding that “grant of additional time based on Royce’s flawed
reading of the Commission’s procedural rules would effectively warehouse
scarce broadcast spectrum” – an outcome that “would disserve the public
interest.” Id.
The Bureau, however, subsequently referred disposition of the
KIEV(AM) construction permit to the full Commission. Order (¶ 11) (JA ).
The Bureau authorized Royce to file a substantive application for review of
the staff’s waiver denial, and permitted Ontario to file an opposition thereto,
to “preserve[e] the Commission’s ability to reach the merits of the case.” Id.
19

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 28 of 105
On February 22, 2006, Royce filed an application for review and an
application to modify the KIEV(AM) permit to specify a new transmitter site.
Id. (¶ 11 & n.42) (JA ).

D. The Order

On Appeal.
In its June 5, 2008 Order, the Commission dismissed Royce’s
application for review as untimely. Order (¶¶ 13-14, 17) (JA ). It also
denied Royce’s petition for reconsideration of the Aug. 20, 2004 Bureau
Letter (JA ), which held the same. Id. (¶ 16) (JA ).
The Commission explained that Royce’s untimely motion did not
comply with the FCC’s rules concerning extensions of time because it was
submitted after the filing deadline. Id. (¶ 13 & n.48); see also n.7, above
(discussing 47 C.F.R. § 1.46(c)). Moreover, Royce’s “misunderstanding with
its former counsel regarding the preparation of an Application for Review”
provided no basis for a waiver, because Royce, as the applicant, “is ultimately
responsible if counsel does not vigorously prosecute [its] interests.” Order
(¶ 13) (JA ). The Commission further explained that considering Royce’s
late-filed application for review could prejudice other parties – specifically,
LSP and Ontario – which have “applications … in queue” that could “become
ripe for consideration with the expiration of the KIEV(AM) permit.” Id.
Finally, the FCC held that Royce’s “post-construction deadline efforts” to
20

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 29 of 105
find a replacement for the Stocker site “warrant neither a waiver of the
Commission’s procedural rules nor of the [s]ection 73.3598-mandated
construction deadlines.” Id. (¶ 14) (JA ).
The Commission “conclude[d] that the KIEV(AM) permit expired
under its own terms on April 25, 2002, as a result of the Bureau’s denial of
Royce’s request for additional construction time and Royce’s failure either to
file a timely Application for Review of that ruling or to construct within the
time allotted.” Id. “Having resolved this case procedurally,” the FCC
dismissed Royce’s untimely application for review as well as its 2006
application to modify the expired construction permit for KIEV(AM). Id.
The Commission went on to explain that “Royce would not have
prevailed even had [the agency] found a basis for reaching the merits of its
Application for Review.” Id. (¶ 15) (JA ). The Commission reiterated that
it “expan[ded] … radio station construction periods from eighteen months to
three years” in 1998 “to eliminate zoning issues as a basis for obtaining
additional time to complete station construction.” Id. The Commission
further noted that it “rejected suggestions to add site-related difficulties” like
Royce’s “to the tolling criteria” in rule 73.3958(a). Id. Moreover, “[u]nder
[the Commission’s] current broadcast station policies, the selection of a
transmitter site is an independent business decision within a permittee’s
21

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 30 of 105
control.” Id. Thus, “[e]ven accepting arguendo that Royce’s delay in
initiating zoning stemmed from restrictions required by Stocker,” this “fact[]
would not have warranted a waiver of the construction deadline” because it
“remains the case that Royce’s selection of the site and acceptance of
8
Stocker’s terms were matters within Royce’s control.” Id.

SUMMARY OF ARGUMENT

Royce obtained a construction permit more than 27 years ago, yet it has
never built the broadcast station authorized by that permit, let alone initiated
service to the public. Royce nonetheless contends that the Commission was
required to grant another extension of that permit’s construction deadline,
even though Royce’s permit, by its terms, expired on April 25, 2002. It was
not.
Royce’s failure to seek timely administrative review of the Media
Bureau’s decision is fatal to its appeal. Royce concedes that it did not file its
application for review within the 30-day window prescribed by 47 C.F.R.

8 On June 28, 2011, the Bureau dismissed on procedural grounds Royce’s
subsequent petition for reconsideration. Order on Reconsideration (¶ 1)
(JA ). The Bureau explained that Royce’s petition merely “reiterates
arguments already considered and rejected [by] the Commission[]” – notably,
Royce’s claim that LSP and Ontario would not be prejudiced if the
Commission waived the filing deadline for Royce’s untimely application for
review. Id. (¶ 2 & n.3) (JA ). As noted above (n.2), the 2011 Order on
Reconsideration
is not properly before the Court on this appeal.
22

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 31 of 105
§ 1.115(d). Consistent with its own precedent and precedent from this Court,
the Commission found that error by counsel does not provide an equitable
basis for waiving that filing deadline. The Commission further found that
other parties could be prejudiced if it considered and granted Royce’s late-
filed request for a deadline extension, because their pending applications
would not become ripe for consideration until final disposition of Royce’s
construction permit. The Commission thus did not abuse its discretion when
it dismissed Royce’s untimely application for review on procedural grounds.
Even if this Court were to reach the merits, the Commission properly
concluded that Royce was not entitled to a waiver of its construction
deadline. Royce failed to show that it missed its deadline due to rare and
exceptional circumstances beyond its control. Rather, as the Commission
explained, Royce encountered run-of-the-mill zoning problems – the type of
problems that do not justify waiver or tolling of the three-year construction
deadline in section 73.3598(a) of the FCC’s rules. Indeed, policy
considerations strongly militate against the grant of a waiver here: Royce’s
case presents a classic example of the type of “spectrum warehousing” that
led the Commission to tighten its broadcast construction rules in 1998.
23

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 32 of 105

ARGUMENT

I.

THE STANDARD OF REVIEW IS HIGHLY
DEFERENTIAL

Under the Administrative Procedure Act, this Court must uphold
agency action so long as it is not “arbitrary, capricious, an abuse of
discretion, or otherwise not in accordance with law.” 5 U.S.C. § 706(2)(a).
The scope of review “is a narrow one”; the Court “is not empowered to
substitute its judgment for that of the agency,” but instead may determine
only whether the agency has “articulate[d] a rational connection between the
facts found and the choice made.” Bowman Transp., Inc. v. Arkansas-Best
Freight Sys., Inc., 419 U.S. 281, 285 (1974) (internal quotation marks and
citations omitted). Further, the Court must afford “deference … to an
agency’s decision whether to waive one of its own procedural rules.”
NetworkIP, LLC v. FCC, 548 F.3d 116, 127 (D.C. Cir. 2008). Review of the
FCC’s denial of a waiver is “‘extremely limited;’” the Court “will ‘vacate
such denials only when the agency’s reasons are so insubstantial as to render
that denial an abuse of discretion.’” Delta Radio, Inc. v. FCC, 387 F.3d 897,
900 (D.C. Cir. 2004) (citation omitted).
As explained below, applying this “limited review,” Delta Radio, 387
F.3d at 901, the Court should affirm the FCC’s Order.
24

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 33 of 105

II.

THE COMMISSION ACTED WITHIN ITS DISCRETION
IN DISMISSING ROYCE’S UNTIMELY APPLICATION
FOR REVIEW

Under the Commission’s rules, applications for review must be filed
within 30 days of public notice. 47 C.F.R. § 1.115(d); see also 47 U.S.C. §
155(c)(4) (any person “aggrieved by” any decision taken by the FCC’s staff
on delegated authority “may file an application for review by the Commission
within such time and in such manner as the Commission shall prescribe”).
“Waiver of the deadline is appropriate only where equities so require and no
party would be prejudiced thereby.” Order (¶ 12) (JA ) (citing Crystal
Broad. Partners, 11 FCC Rcd at 4681). Motions for extension of time
25

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 34 of 105
generally must be filed at least seven days before the filing deadline, see 47
9
C.F.R. § 1.46(c), and are not routinely granted, id. § 1.46(a).
The Commission acted well within its discretion in denying Royce’s
motion for additional time to file its application for review. Royce concedes
that it missed the deadlines for both (1) its application for review and (2) its

9 Royce thus wrongly contends that “[t]he FCC has routinely granted
waivers of applicable filing deadlines.” Br. 53. As set forth above, the
Commission’s rules expressly discourage such waivers. See 47 C.F.R. §
1.46(a). And the waiver grants cited by Royce are easily distinguished. In
Regionet Wireless License LLC, 17 FCC Rcd 21263, 21265 (2002), MTD,
Inc.,
6 FCC Rcd 34, n.2 (1991), and Noble Syndications, Inc., 74 F.C.C. 2d
124, 128-29 (1979), the Commission found that no other parties would be
prejudiced if it accepted a party’s untimely filing. That is not the case here,
where the Commission found that LSP and Ontario could be prejudiced if it
considered Royce’s late-filed application for review and granted its request to
extend the KIEV(AM) construction deadline. Order (¶ 13) (JA ).
Moreover, in Clear Channel Broad. Licenses, Inc., 26 FCC Rcd 7153, 7156-
57 (2011), pet. for rev. pending, Blakeney Commc’ns, Inc. v. FCC (D.C. Cir.
No. 11-1203), the Commission waived the filing deadline for an FM radio
station that had completed construction of an upgrade, but had filed its license
application two days late. In those circumstances, “a waiver does not
undermine [s]ection 73.3598’s purpose” because the modified facilities were
“constructed and operating at the time the Construction Permit expired.”
Clear Channel, 26 FCC Rcd at 7157 (¶ 10). In sharp contrast, Royce has not
even commenced construction, let alone initiated service to the public in
connection with a construction permit it obtained more than 27 years ago.
This is the type of “indefinite warehousing of spectrum” that revised rule
73.3598(a) was designed to eliminate. Order (¶ 15) (JA ).
26

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 35 of 105
10
subsequent motion for an extension of time to file that application.
Br. 22-
23; see also Order (¶ 13)(JA ). It asserts (Br. 22) that its procedural default
nonetheless should be excused because it allegedly arose from a
misunderstanding with its counsel. But, as the Commission explained,
“[c]ounsel is merely an applicant’s agent, chosen by the applicant.” Order
(¶ 13) (JA ). “[T]hus[,] the applicant is ultimately responsible if counsel
does not vigorously prosecute the applicant’s interests.” Id. Indeed, the
Commission has repeatedly held that it will not waive a missed filing
deadline due to counsel’s error. See, e.g., Application of Indep. Commc’ns,
Inc., 15 FCC Rcd 7080, 7081 (¶ 6) (1999) (counsel’s illness does not justify
waiver of filing deadline); Applications of Northwest Broad., Inc., Assignor,
and Western Pacific, Inc., Assignee, 6 Comm. Reg. (P&F) 685 (¶ 9) (1997)
(declining to consider petitioners’ untimely objection to a license assignment,
which petitioners attributed to inexperienced counsel); Crystal Broad.
Partners, 11 FCC Rcd at 4681 (¶ 8) (declining to waive deadline after
counsel filed application for review four days late); Application of RDH Ltd.

10 This is not the first time that Royce “sought to be excused from the
[FCC’s] filing rules.” Royce Int’l Broad. Co. v. FCC, 820 F.2d 1332, 1334 &
n.2 (D.C. Cir. 1987) (describing Royce’s failure to comply with the FCC’s
procedural requirements); see also id. at 1336 (describing Edward Stolz,
Royce’s principal, as “not a broadcasting neophyte, but rather a licensee with
considerable, if troubled, experience in the ways of the Commission.”).
27

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 36 of 105
P’ship, 6 FCC Rcd 4764, 4765 (¶ 5) (1991) (“[r]egardless of … whether the
omission occurred in the office of applicant’s counsel, or in transit, the
applicant bears the full burden of its (or its agents’) failure to file a complete
application.”).
The Commission’s routine application of the filing-deadline rule,
moreover, is fully consistent with this Court’s precedent. The Court has
recognized that “[w]hen an agency imposes a strict deadline for filings, as the
FCC has done, many meritorious claims are not considered; that is the nature
of a strict deadline.” NetworkIP, 548 F.3d at 116. Accordingly, this Court
has “discourage[d] the Commission from entertaining late-filed pleadings ‘in
the absence of extremely unusual circumstances.’” BDPCS, Inc. v. FCC, 351
F.3d 1177, 1184 (D.C. Cir. 2003) (quoting 21st Century Telesis Joint Venture
v. FCC, 318 F.3d 192, 200 (D.C. Cir. 2003)). And it has consistently held
that error by counsel – like the “misunderstanding” cited by Royce here – is
not an “unusual circumstance” that justifies a waiver. See, e.g., NetworkIP,
548 F.3d at 126 (waiver of filing deadline after counsel failed to timely remit
the correct filing fee was arbitrary and capricious); Virgin Islands Tel. Corp.
v. FCC, 989 F.2d 1231, 1237 (D.C. Cir. 1993) (tardiness caused by
miscommunication among petitioner’s counsel was not an “unusual
circumstance” that excused its late-filed petition for reconsideration);
28

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 37 of 105
Reuters LTD. v. FCC, 781 F.2d 946, 952 (D.C. Cir. 1986) (FCC “acted
beyond its lawful authority when it entertained” a petition for reconsideration
filed two days late).

Royce contends that the Commission erred when it found that LSP and
Ontario could be prejudiced if the agency considered Royce’s late-filed
application for review and granted Royce’s requested extension of its
construction permit. Br. 54-56. According to Royce, such prejudice should
be discounted because there is no assurance that the Commission will
ultimately grant the competing applications filed by LSP and Ontario. Br.
54-55. This argument misses the point: the Commission’s rules protecting
against interference (see n.5, above) prevent the FCC from even considering
those applications until final disposition of the KIEV(AM) construction
permit. See Order (¶ 9) (JA ); see also Br. 20 (conceding that LSP’s
application “w[as] filed subject to the proviso that [it could not] be granted
until final disposition of the KIEV Revised Construction Permit.”). Thus, the
Commission reasonably found that LSP and Ontario could be prejudiced if it
granted Royce’s motion for an extension of time and, after consideration of
its late-filed application for review, revived the KIEV(AM) construction
29

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 38 of 105
11
permit. Simply stated, consideration and grant of Royce’s untimely
application would prevent Commission consideration of the competing LSP
and Ontario applications – applications that have now been pending for more
12
than seven years.
Order (¶ 13) (JA ); Dec. 17, 2004 Bureau Letter at 3
(JA ).
The Commission has long held that “strict adherence to the principle of
finality” in licensing “promotes the prompt initiation of service.” Hancock
Commc’ns, Inc., 10 FCC Rcd 13068, 13069 (1995) (citing Florida Inst. of
Tech. v. FCC, 952 F.2d 549, 554 (D.C. Cir. 1992)). Here, valuable AM radio
spectrum has gone unused for more than 27 years, and granting Royce’s
motion to file an untimely application for review would have enabled Royce

11 In a somewhat analogous context, this Court has held that to demonstrate
the “injury in fact” required for Article III standing, a “disappointed bidder”
in an FCC spectrum auction “need not show that it would be successful if the
license were auctioned anew, but only that it was able and ready to bid and
that the decision of the Commission prevented it from doing so on an equal
basis.” High Plains Wireless L.P. v. FCC, 276 F.3d 599, 605 (D.C. Cir.
2002) (citing DirecTV v. FCC, 110 F.3d 816, 829 (D.C. Cir. 1997)).
12 Royce complains that Aug. 20, 2004 Bureau Letter did not discuss
Royce’s argument that no parties would be prejudiced by waiver of the filing
deadline. Br. 56. That claim was later considered and rejected by the Bureau
and the Commission. See Dec. 17, 2004 Bureau Letter at 3 (JA ); Order
(¶ 13) (JA ). Likewise, Royce complains the Bureau and the Commission
declined to consider its post-construction deadline efforts to locate a new site
for KIEV(AM). Br. 56. The Commission in fact did consider those efforts; it
simply found them to be unpersuasive. Order (¶ 14) (JA ).
30

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 39 of 105
to continue to “warehouse scarce broadcast spectrum” – an outcome that
“would disserve the public interest.” Dec. 17, 2004 Bureau Letter at 3
(JA ). Thus, there is no merit to Royce’s effort to minimize (see Br. 56) the
prejudice that, the Commission explained, would flow from the relief Royce
requested.
* * *
Royce’s conceded failure to file a timely application for review is
dispositive of this appeal. The Commission does not abuse its discretion
when it follows its own rules. See BDPCS, 351 F.3d at 1184. Here, the
Commission followed its settled rules – and this Court’s precedent – in
declining to excuse Royce’s untimely filing. That decision should be
affirmed.

III.

THE COMMISSION PROPERLY CONCLUDED THAT
ROYCE WAS NOT ENTITLED TO A WAIVER OF THE
CONSTRUCTION DEADLINE

Even if the Court were to reach the merits (which is unnecessary in
light of the FCC’s correct procedural ruling), it should defer to the
Commission’s determination that Royce was not entitled to a waiver of the
three-year construction deadline set by 47 C.F.R. § 73.3598(a). Order (¶ 15)
(JA ).
31

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 40 of 105

A.

Royce’s Zoning Problems Did Not Justify A Waiver And

Further Extension Of The KIEV(AM) Construction
Deadline.

The purpose of the three-year construction period in rule 73.3598(a) is
to ensure prompt station construction and the initiation of new radio service.
Streamlining Reconsideration Order, 14 FCC Rcd at 17539 (¶ 36). To
achieve that goal, the Commission “establish[ed] an incentive for all potential
applicants to plan construction carefully even prior to applying for a
[construction] permit and, once the permit is received, to bring to the
construction process the same degree of urgency brought to other business
endeavors.” Id. The Commission thereby sought to minimize instances in
which applicants file for permits without taking preliminary steps to begin –
much less complete – construction. Id. Yet that is precisely what happened
here: the Commission granted Royce the KIEV(AM) construction permit
more than 27 years ago, but Royce has never even commenced construction
of a radio station. Under those circumstances, the Commission reasonably
concluded that Royce was not entitled to a waiver and yet another extension
of the three-year construction period required by rule 73.3598(a).
Royce’s waiver request was predicated on the asserted problems it
encountered in obtaining initial zoning approval for the Stocker site. But
when the Commission revised its broadcast construction rules in 1998, it
32

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 41 of 105
unequivocally “exclu[ded] zoning matters from the category of
circumstances” that would toll the three-year construction deadline in rule
73.3598(a). Streamlining Reconsideration Order, 14 FCC Rcd at 17539
(¶ 37). The Commission reasoned that doubling the radio construction period
from 18 months to three years would provide “diligent permittees” enough
time to “resolve zoning issues[,] either by securing an alternate site or
obtaining the necessary approvals.” Id.; see also Order (¶ 15) (JA ). The
Commission, moreover, explained “that diligent permittees can eliminate or
mitigate zoning delays by applying for approval from pertinent local
authorities prior to the issuance of a construction permit.” Streamlining
Reconsideration Order, 14 FCC Rcd at 17540 (¶ 38).
Royce claims it is entitled to an exception to the general rule that
zoning problems will not justify tolling or waiver because the zoning delays it
experienced were allegedly beyond its control. That claim is not supported
by the record. Royce first sought Commission approval to build at the
Stocker site when it amended its major change application on August 6, 2001.
July 8, 2004 Bureau Letter at 2 (JA ). The Bureau granted that amendment
on September 28, 2001. Id. Royce, however, did not contact local zoning
authorities until January 2002, approximately four months after the
Commission issued the revised construction permit (i.e., Sept. 28, 2001) and
33

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 42 of 105
one month after its waiver request had been denied (i.e., Dec. 20, 2001). Id.
at 4 (JA ).
Royce protests that it was not responsible for this delay because
“Montebello’s policies precluded [Royce] from filing a zoning approval
application without [Stocker’s] consent” (Br. 36) – consent that Stocker
ultimately refused to provide. Id. at 37. This argument ignores Commission
precedent holding that “the selection of a transmitter site is an independent
business decision within a permittee’s control.” Order (¶ 15 & n.58) (JA )
(citing Streamlining Reconsideration Order, 14 FCC Rcd at 17539 (¶ 38 &
n.51)). With fewer than five months remaining before the expiration of the
December 21, 2001 construction deadline, Royce knowingly chose the
Stocker property as its transmitter site without having first applied for zoning
approval – approval that required the participation and consent of the
landowner. “Even accepting arguendo that Royce’s delay in initiating zoning
stemmed from restrictions required by Stocker,” the Commission observed,
“Royce’s selection of the site and acceptance of Stocker’s terms were matters
within Royce’s control.” Order (¶ 15) (JA ). The Commission was well
34

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 43 of 105
within its discretion in concluding that a waiver of the construction deadline
13
was not warranted under these circumstances. Id.

B.

The ITU Condition Does Not Entitle Royce To An

Extension Of The KIEV(AM) Construction Deadline.


Equally unavailing is Royce’s reliance on the Bureau’s initial
misunderstanding that the construction permit required ITU approval (Br. 38-
42) – an error the Bureau promptly corrected after discovery, and to Royce’s
benefit. As an initial matter, this argument is not properly before the Court
because it was not raised before the full Commission. See 47 U.S.C. §
405(a); Environmentel, LLC v. FCC, 661 F.3d 80, 83-84 (D.C. Cir. 2011). In
any event, the argument is meritless.
The Commission does not dispute that on December 20, 2001, the
Bureau erroneously found that the KIEV(AM) construction permit required
ITU approval. Dec. 20, 2001 Bureau Letter at 4-5 (JA ). Based on its

13 In an attempt to indirectly attack the Commission’s decision, Royce
launches a scattershot attack on two of the Bureau’s decisions (i.e., the
January 11, 2002 Bureau Letter and the July 8, 2004 Bureau Letter). Br. 34-
42. The Commission, however, did not rely on those staff-level decisions
when it found that Royce was not entitled to a waiver of its construction
deadline. See Order (¶ 15) (JA ). In any event, there is no dispute that
Royce designated the Stocker property as its transmitter site and that it
selected that site subject to the terms and conditions imposed by Stocker. It
follows that the subsequent zoning delays were “matters within Royce’s
control,” making it ineligible for a waiver of the construction deadline
established by rule 73.3598(a). Id.
35

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 44 of 105
understanding that the international condition precluded construction at the
authorized site, the Bureau, on its own motion, waived the deadline in rule
73.3598(a) to provide Royce 84 days following ITU approval to complete
construction (i.e., the time between the September 28, 2001 grant of the
revised construction permit and that permit’s expiration on December 21,
2001). See Dec. 20, 2001 Bureau Letter at 4 (JA ).
As it turned out, Royce’s construction permit only affected Mexican
stations, and the Mexican government cleared Royce’s proposal on
November 8, 2001; hence, as the Bureau quickly discovered, there was no
need for ITU approval. Jan. 11, 2002 Bureau Letter at 4 (JA ); Order (n.19)
(JA ). Accordingly, the Bureau promptly issued corrected decisions on
January 8, 2002 and January 11, 2002 that removed the international
condition from Royce’s construction permit. Jan. 8, 2002 Bureau Letter at 1
(JA ); Jan. 11, 2002 Bureau Letter at 4 (JA ).

Royce now claims that it found this “series of events … ambiguous and
confusing” until the Bureau released the July 8, 2004 Bureau Letter. Br. 44.
By that date, Royce asserts, “the KIEV construction deadline had lapsed” so
that “the damage had been done.” Id. Royce’s claim is undercut by the
facts. The earlier January 11, 2002 Bureau Letter (at 4 (JA )) clearly states:
“The International Bureau informs us that Mexico cleared this matter on
36

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 45 of 105
November 8, 2001, and that there are no remaining international impediments
to construction.” Thus, Royce was notified more than two years earlier that
the KIEV(AM) permit was not encumbered by the ITU approval process, and
that construction could commence. Royce accordingly cannot attribute its
failure to construct KIEV(AM) to the international condition that the Bureau
mistakenly (and only briefly) placed on the permit.
The Bureau, moreover, waived rule 73.3598(a) to provide Royce an
additional 84 days to construct KIEV(AM) (i.e., until April 25, 2002) even
though Royce was not entitled to an extension. As the Bureau explained,
“[h]ad we known at the time of our December 20, 2001 letter that the only
international impediment to construction was a Mexican clearance received
almost two months earlier, we would have found that Royce had an
opportunity to construct … and would not have given it any additional time.”
Jan. 11, 2002 Bureau Letter at 5 (JA ). Royce was hardly “penalized” by
the Bureau’s mistake (Br. 45); quite to the contrary, it received the benefit of
“an error in [its] favor.” Jan. 11, 2002 Bureau Letter at 5 (JA ).

C.

The Commission’s Application of Its Waiver Policy In

This Case Is Consistent With The Agency’s Precedent.

Royce contends that the Commission’s denial of its waiver request was
“inconsistent with the agency’s treatment of similarly-situated applicants.”
Br. 28. That is wrong. The Commission has consistently denied requests to
37

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 46 of 105
extend the three-year construction deadline in rule 73.3598(a) based on a
permittee’s zoning difficulties. See, e.g., Cram Commc’ns, LLC, 23 FCC Rcd
658, 662-63 (2008) (city-imposed moratorium on building permits was not
grounds for tolling permittee’s construction deadline); Birach Broad. Corp.,
23 FCC Rcd 3141, 3145-46 (2008) (permittee that did not seek zoning
approval until 27 months into the station’s construction period was not
entitled to tolling); JNE Invs., Inc., 23 FCC Rcd 623, 629-31 (2008)
(permittee that abandoned a permitted site in favor of an alternative site
where it encountered zoning difficulties was not entitled to tolling).
Royce ignores that precedent and instead relies on various staff-level
decisions granting waivers of the three-year construction deadline. Br. 45-50.
But reliance on staff-level decisions to set forth a claim of Commission
discrimination is foreclosed by this Court’s opinion in Comcast v. FCC, 526
F.3d 763, 769 (D.C. Cir. 2008). In that decision, this Court rejected just such
a claim and affirmed its “well-established view that an agency is not bound
by the actions of its staff if the agency has not endorsed those actions.” Id.
(internal quotation marks and citations omitted). Comcast makes clear that a
litigant must point to conflicting Commission-level decisions to establish a
claim of discriminatory treatment by the agency.
38

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 47 of 105

In any event, Royce’s reliance on the agency’s staff-level decisions is
unavailing because Royce is not similarly situated to the permittees that
received waivers in those cases.

1. In Hoyt Sherman Place Foundation, 21 FCC Rcd 10760 (Media
Bur. 2006) (Br. 45-46), for example, the Media Bureau granted a waiver to a
permitee because it “had acquired all necessary equipment to operate the
station but would be unable to complete construction by the expiration date
because … the owner had stripped the facilities down to the concrete walls,
removing all bathrooms, carpeting, soundproofing, etc.” Id. at 10761. In
contrast, Royce had not obtained initial zoning approval – let alone begun
construction of its station – when its permit finally expired on April 25, 2002.

2. Nor is Letter to Rebecca Duke, Esq., 18 FCC Rcd 5034, 5035-36
(Media Bur. 2003) (Br. 46-49) to the contrary. There, the Bureau waived a
permittee’s construction deadline after the local school system exercised
eminent domain over the station’s licensed transmitter site. Id., 18 FCC Rcd
at 5035. The Bureau explained that “[t]he forc[ible] taking of private land for
government use is rare and exceptional,” id., whereas “initial zoning is not a
tolling encumbrance.” Id., 18 FCC Rcd at 5036, n.6. Royce concedes that it
“did not lose its site as a result of a government acquisition,” Br. 47; Letter to
Rebecca Duke, Esq. is therefore inapposite.
39

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 48 of 105
3. Royce’s reliance on Oxenford is equally misplaced. See Br. 49-51
(citing Letter from Chief, Audio Division, Media Bureau, FCC to David
Oxenford, Esq., Ref. No. 1800B3-1B at 2 (Jan. 28, 2008) (JA )
(“Oxenford”)). In that unpublished decision, the Bureau waived the
permittee’s construction deadline after the Federal Aviation Administration
barred it from modifying its facilities due to concerns about interference with
air traffic control signals. Oxenford at 1 (JA ). The Bureau reasoned that
the permittee “merit[ed] a waiver because it is unusual for an auction winner
to potentially create an air hazard within the entire area in which it could
locate a Commission-allotted channel.” Id. at 3. Royce, by contrast, failed to
“establish that [the City of] Montebello’s zoning processes are unique or even
unusual so as to warrant an exception to the general principle that initial
zoning problems do not form a basis for grant of additional construction
time.” July 8, 2004 Bureau Letter at 4 (JA ).

Like the staff-level decisions discussed above, the sole Commission-
level waiver case cited by Royce lends no support to its claim of disparate
treatment. See Br. 51-52 (discussing Texas Grace Commc’ns, 16 FCC Rcd
19167, 19170-71 (2001) (“Texas Grace”)). In Texas Grace, the Commission
found that the permittee “might have concluded” from the Streamlining
Reconsideration Order, 14 FCC Rcd at 18538, “that reliance on mere
40

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 49 of 105
facilities modifications involving frequency or class would be insufficient to
trigger tolling, but that a facility change coupled with a community of license
change might be treated differently.” 16 FCC Rcd at 19171 (¶ 10). “In view
of this circumstance,” the Commission waived its rules to provide the
permittee an additional three years to complete construction. Id.
Contrary to Royce’s claim (Br. 51) that it was entitled to a similar
waiver “because it too proposed a facilities change coupled with a community
of license change,” the Commission explained in the Order on appeal that
“[t]he equities applicable to the permittee in Texas Grace, which had initiated
a rulemaking and modification process well before adoption of the revised
construction rules, are not present for Royce, which filed its modification
application after the rule change, and whose application did not stem from a
41

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 50 of 105
14
rulemaking proceeding.”
Order (¶ 15, n.60) (JA ) (emphasis added). In
other words, while the Commission’s “intent” in the 1998 Streamlining
Reconsideration Order “may not have been completely clear to permittees
[like Texas Grace] with then-outstanding modification requests,” Texas
Grace, 16 FCC Rcd at 19171 (¶ 10), it should have been clear to Royce,
which did not propose a facilities change coupled with a community of
15
license change until three years later, in 2001. Order (¶ 4) (JA ). The
Commission, moreover, released Texas Grace prior to Royce’s December 7,

14 Royce further contends that the Commission’s rulemaking distinction is
“arbitrary.” Br. 52. It is not. Texas Grace involved a two-part commercial
FM licensing procedure. Under the Commission’s former rules, the permittee
in Texas Grace had to initiate a rulemaking to change its community of
license – a process that usually took one to three years to complete. Texas
Grace,
16 FCC Rcd at 19167 (¶ 2). Only after the permittee successfully
completed the rulemaking could it file an application to modify the facilities
designated in its construction permit. Id. Based on the foregoing, it was not
unreasonable for the permittee in Texas Grace to conclude that the
Commission devised a different construction rule for those cases where the
licensing process is likely to stretch across the entire three-year construction
period. This assumption would have been unreasonable in the context of AM
licensing, however. A permittee like Royce (during the relevant period and
now) may use a single application to request a change in its community of
license and modification of its facilities.
15 If Royce believed that the Streamlining Reconsideration Order did not
hold permittees requesting both facilities modification and a community of
license change to the three-year construction deadline in rule 73.3598(a), then
it should have objected when the Bureau issued the revised construction
permit for KIEV(AM) on September 28, 2001. Order (¶ 4) (JA ). That
permit held Royce to its December 21, 2001 construction deadline. Id.
42

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 51 of 105
2001 waiver request, and that decision unambiguously placed permittees like
Royce on notice that the FCC in “future cases” would toll a construction
permit “only [in] the circumstances explicitly identified in [s]ection
73.3598(b) of [its] rules.” 16 FCC Rcd at 19171 (¶ 10).

CONCLUSION

For the above reasons, the Order should be affirmed.
Respectfully
submitted,

AUSTIN C. SCHLICK
GENERAL COUNSEL
PETER KARANJIA
DEPUTY GENERAL COUNSEL
RICHARD K. WELCH
DEPUTY ASSOCIATE GENERAL
COUNSEL
/s/ Maureen K. Flood
MAUREEN K. FLOOD
COUNSEL
FEDERAL COMMUNICATIONS
COMMISSION
WASHINGTON, D.C. 20554
(202) 418-1740
February 9, 2012
43

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 52 of 105
IN THE UNITED STATES COURT OF APPEALS
FOR THE DISTRICT OF COLUMBIA CIRCUIT
ROYCE INTERNATIONAL BROADCASTING
COMPANY,
APPELLANT,
NO. 11-1270
v.
FEDERAL COMMUNICATIONS COMMISSION
APPELLEE.
CERTIFICATE OF COMPLIANCE
Pursuant to the requirements of Fed. R. App. P. 32(a)(7), I hereby
certify that the accompanying “Brief for Appellee” in the captioned case
contains 9,176 words.
/s/ Maureen K. Flood
Maureen K. Flood

Counsel
Federal Communications Commission
Washington, D.C. 20554
(202) 418-1740 (Telephone)
(202) 418-2819 (Fax)
February 9, 2012

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 53 of 105

Statutory and Regulatory Appendix

5 U.S.C. § 706
47 U.S.C. § 155
47 U.S.C § 301
47 U.S.C. § 307
47 U.S.C. § 308
47 U.S.C. § 309
47 U.S.C. § 319
47 U.S.C. § 402
47 U.S.C. § 405
47 C.F.R. § 1.46
47 C.F.R. § 1.115
47 C.F.R. § 73.3958


USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 54 of 105
5 U.S.C. § 706
To the extent necessary to decision and when presented, the reviewing court shall
decide all relevant questions of law, interpret constitutional and statutory
provisions, and determine the meaning or applicability of the terms of an agency
action. The reviewing court shall--
(1) compel agency action unlawfully withheld or unreasonably delayed; and
(2) hold unlawful and set aside agency action, findings, and conclusions found to
be--
(A) arbitrary, capricious, an abuse of discretion, or otherwise not in accordance
with law;
(B) contrary to constitutional right, power, privilege, or immunity;
(C) in excess of statutory jurisdiction, authority, or limitations, or short of statutory
right;
(D) without observance of procedure required by law;
(E) unsupported by substantial evidence in a case subject to sections 556 and 557
of this title or otherwise reviewed on the record of an agency hearing provided by
statute; or
(F) unwarranted by the facts to the extent that the facts are subject to trial de novo
by the reviewing court.
In making the foregoing determinations, the court shall review the whole record or
those parts of it cited by a party, and due account shall be taken of the rule of
prejudicial error.
2

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 55 of 105
47 U.S.C. § 155
(a) Chairman; duties; vacancy
The member of the Commission designated by the President as chairman shall be
the chief executive officer of the Commission. It shall be his duty to preside at all
meetings and sessions of the Commission, to represent the Commission in all
matters relating to legislation and legislative reports, except that any commissioner
may present his own or minority views or supplemental reports, to represent the
Commission in all matters requiring conferences or communications with other
governmental officers, departments or agencies, and generally to coordinate and
organize the work of the Commission in such manner as to promote prompt and
efficient disposition of all matters within the jurisdiction of the Commission. In the
case of a vacancy in the office of the chairman of the Commission, or the absence
or inability of the chairman to serve, the Commission may temporarily designate
one of its members to act as chairman until the cause or circumstance requiring
such designation shall have been eliminated or corrected.
(b) Organization of staff
From time to time as the Commission may find necessary, the Commission shall
organize its staff into (1) integrated bureaus, to function on the basis of the
Commission's principal workload operations, and (2) such other divisional
organizations as the Commission may deem necessary. Each such integrated
bureau shall include such legal, engineering, accounting, administrative, clerical,
and other personnel as the Commission may determine to be necessary to perform
its functions.
(c) Delegation of functions; exceptions to initial orders; force, effect and
enforcement of orders; administrative and judicial review; qualifications and
compensation of delegates; assignment of cases; separation of review and
investigative or prosecuting functions; secretary; seal
(1) When necessary to the proper functioning of the Commission and the prompt
and orderly conduct of its business, the Commission may, by published rule or by
order, delegate any of its functions (except functions granted to the Commission by
this paragraph and by paragraphs (4), (5), and (6) of this subsection and except any
action referred to in sections 204(a)(2), 208(b), and 405(b) of this title) to a panel
of commissioners, an individual commissioner, an employee board, or an
individual employee, including functions with respect to hearing, determining,
3

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 56 of 105
ordering, certifying, reporting, or otherwise acting as to any work, business, or
matter; except that in delegating review functions to employees in cases of
adjudication (as defined in section 551 of Title 5), the delegation in any such case
may be made only to an employee board consisting of two or more employees
referred to in paragraph (8) of this subsection. Any such rule or order may be
adopted, amended, or rescinded only by a vote of a majority of the members of the
Commission then holding office. Except for cases involving the authorization of
service in the instructional television fixed service, or as otherwise provided in this
chapter, nothing in this paragraph shall authorize the Commission to provide for
the conduct, by any person or persons other than persons referred to in paragraph
(2) or (3) of section 556(b) of Title 5, of any hearing to which such section applies.
(2) As used in this subsection the term “order, decision, report, or action” does not
include an initial, tentative, or recommended decision to which exceptions may be
filed as provided in section 409(b) of this title.
(3) Any order, decision, report, or action made or taken pursuant to any such
delegation, unless reviewed as provided in paragraph (4) of this subsection, shall
have the same force and effect, and shall be made, evidenced, and enforced in the
same manner, as orders, decisions, reports, or other actions of the Commission.
(4) Any person aggrieved by any such order, decision, report or action may file an
application for review by the Commission within such time and in such manner as
the Commission shall prescribe, and every such application shall be passed upon
by the Commission. The Commission, on its own initiative, may review in whole
or in part, at such time and in such manner as it shall determine, any order,
decision, report, or action made or taken pursuant to any delegation under
paragraph (1) of this subsection.
(5) In passing upon applications for review, the Commission may grant, in whole
or in part, or deny such applications without specifying any reasons therefor. No
such application for review shall rely on questions of fact or law upon which the
panel of commissioners, individual commissioner, employee board, or individual
employee has been afforded no opportunity to pass.
(6) If the Commission grants the application for review, it may affirm, modify, or
set aside the order, decision, report, or action, or it may order a rehearing upon
such order, decision, report, or action in accordance with section 405 of this title.
4

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 57 of 105
(7) The filing of an application for review under this subsection shall be a
condition precedent to judicial review of any order, decision, report, or action
made or taken pursuant to a delegation under paragraph (1) of this subsection. The
time within which a petition for review must be filed in a proceeding to which
section 402(a) of this title applies, or within which an appeal must be taken under
section 402(b) of this title, shall be computed from the date upon which public
notice is given of orders disposing of all applications for review filed in any case.
(8) The employees to whom the Commission may delegate review functions in any
case of adjudication (as defined in section 551 of Title 5) shall be qualified, by
reason of their training, experience, and competence, to perform such review
functions, and shall perform no duties inconsistent with such review functions.
Such employees shall be in a grade classification or salary level commensurate
with their important duties, and in no event less than the grade classification or
salary level of the employee or employees whose actions are to be reviewed. In the
performance of such review functions such employees shall be assigned to cases in
rotation so far as practicable and shall not be responsible to or subject to the
supervision or direction of any officer, employee, or agent engaged in the
performance of investigative or prosecuting functions for any agency.
(9) The secretary and seal of the Commission shall be the secretary and seal of
each panel of the Commission, each individual commissioner, and each employee
board or individual employee exercising functions delegated pursuant to paragraph
(1) of this subsection.
(d) Meetings
Meetings of the Commission shall be held at regular intervals, not less frequently
than once each calendar month, at which times the functioning of the Commission
and the handling of its work load shall be reviewed and such orders shall be
entered and other action taken as may be necessary or appropriate to expedite the
prompt and orderly conduct of the business of the Commission with the objective
of rendering a final decision (1) within three months from the date of filing in all
original application, renewal, and transfer cases in which it will not be necessary to
hold a hearing, and (2) within six months from the final date of the hearing in all
hearing cases.
(e) Managing Director; appointment, functions, pay
5

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 58 of 105
The Commission shall have a Managing Director who shall be appointed by the
Chairman subject to the approval of the Commission. The Managing Director,
under the supervision and direction of the Chairman, shall perform such
administrative and executive functions as the Chairman shall delegate. The
Managing Director shall be paid at a rate equal to the rate then payable for level V
of the Executive Schedule.
6

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 59 of 105
47 U.S.C. § 301
It is the purpose of this chapter, among other things, to maintain the control of the
United States over all the channels of radio transmission; and to provide for the use
of such channels, but not the ownership thereof, by persons for limited periods of
time, under licenses granted by Federal authority, and no such license shall be
construed to create any right, beyond the terms, conditions, and periods of the
license. No person shall use or operate any apparatus for the transmission of
energy or communications or signals by radio (a) from one place in any State,
Territory, or possession of the United States or in the District of Columbia to
another place in the same State, Territory, possession, or District; or (b) from any
State, Territory, or possession of the United States, or from the District of
Columbia to any other State, Territory, or possession of the United States; or (c)
from any place in any State, Territory, or possession of the United States, or in the
District of Columbia, to any place in any foreign country or to any vessel; or (d)
within any State when the effects of such use extend beyond the borders of said
State, or when interference is caused by such use or operation with the
transmission of such energy, communications, or signals from within said State to
any place beyond its borders, or from any place beyond its borders to any place
within said State, or with the transmission or reception of such energy,
communications, or signals from and/or to places beyond the borders of said State;
or (e) upon any vessel or aircraft of the United States (except as provided in section
303(t) of this title); or (f) upon any other mobile stations within the jurisdiction of
the United States, except under and in accordance with this chapter and with a
license in that behalf granted under the provisions of this chapter.

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 60 of 105
47 U.S.C. § 307
(a) Grant
The Commission, if public convenience, interest, or necessity will be served
thereby, subject to the limitations of this chapter, shall grant to any applicant
therefor a station license provided for by this chapter.
(b) Allocation of facilities
In considering applications for licenses, and modifications and renewals thereof,
when and insofar as there is demand for the same, the Commission shall make such
distribution of licenses, frequencies, hours of operation, and of power among the
several States and communities as to provide a fair, efficient, and equitable
distribution of radio service to each of the same.
(c) Terms of licenses
(1) Initial and renewal licenses
Each license granted for the operation of a broadcasting station shall be for a term
of not to exceed 8 years. Upon application therefor, a renewal of such license may
be granted from time to time for a term of not to exceed 8 years from the date of
expiration of the preceding license, if the Commission finds that public interest,
convenience, and necessity would be served thereby. Consistent with the foregoing
provisions of this subsection, the Commission may by rule prescribe the period or
periods for which licenses shall be granted and renewed for particular classes of
stations, but the Commission may not adopt or follow any rule which would
preclude it, in any case involving a station of a particular class, from granting or
renewing a license for a shorter period than that prescribed for stations of such
class if, in its judgment, the public interest, convenience, or necessity would be
served by such action.
(2) Materials in application
In order to expedite action on applications for renewal of broadcasting station
licenses and in order to avoid needless expense to applicants for such renewals, the
8

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 61 of 105
Commission shall not require any such applicant to file any information which
previously has been furnished to the Commission or which is not directly material
to the considerations that affect the granting or denial of such application, but the
Commission may require any new or additional facts it deems necessary to make
its findings.
(3) Continuation pending decision
Pending any administrative or judicial hearing and final decision on such an
application and the disposition of any petition for rehearing pursuant to section 405
or section 402 of this title, the Commission shall continue such license in effect.
(d) Renewals
No renewal of an existing station license in the broadcast or the common carrier
services shall be granted more than thirty days prior to the expiration of the
original license.
(e) Operation of certain radio stations without individual licenses
(1) Notwithstanding any license requirement established in this chapter, if the
Commission determines that such authorization serves the public interest,
convenience, and necessity, the Commission may by rule authorize the operation
of radio stations without individual licenses in the following radio services: (A) the
citizens band radio service; (B) the radio control service; (C) the aviation radio
service for aircraft stations operated on domestic flights when such aircraft are not
otherwise required to carry a radio station; and (D) the maritime radio service for
ship stations navigated on domestic voyages when such ships are not otherwise
required to carry a radio station.
(2) Any radio station operator who is authorized by the Commission to operate
without an individual license shall comply with all other provisions of this chapter
and with rules prescribed by the Commission under this chapter.
(3) For purposes of this subsection, the terms “citizens band radio service”, “radio
control service”, “aircraft station” and “ship station” shall have the meanings given
9

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 62 of 105
them by the Commission by rule.
(f) Notwithstanding any other provision of law, (1) any holder of a broadcast
license may broadcast to an area of Alaska that otherwise does not have access to
over the air broadcasts via translator, microwave, or other alternative signal
delivery even if another holder of a broadcast license begins broadcasting to such
area, (2) any holder of a broadcast license who has broadcast to an area of Alaska
that did not have access to over the air broadcasts via translator, microwave, or
other alternative signal delivery may continue providing such service even if
another holder of a broadcast license begins broadcasting to such area, and shall
not be fined or subject to any other penalty, forfeiture, or revocation related to
providing such service including any fine, penalty, forfeiture, or revocation for
continuing to operate notwithstanding orders to the contrary.
10

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 63 of 105
47 U.S.C. § 308
(a) Writing; exceptions
The Commission may grant construction permits and station licenses, or
modifications or renewals thereof, only upon written application therefor received
by it: Provided, That (1) in cases of emergency found by the Commission
involving danger to life or property or due to damage to equipment, or (2) during a
national emergency proclaimed by the President or declared by the Congress and
during the continuance of any war in which the United States is engaged and when
such action is necessary for the national defense or security or otherwise in
furtherance of the war effort, or (3) in cases of emergency where the Commission
finds, in the nonbroadcast services, that it would not be feasible to secure renewal
applications from existing licensees or otherwise to follow normal licensing
procedure, the Commission may grant construction permits and station licenses, or
modifications or renewals thereof, during the emergency so found by the
Commission or during the continuance of any such national emergency or war, in
such manner and upon such terms and conditions as the Commission shall by
regulation prescribe, and without the filing of a formal application, but no
authorization so granted shall continue in effect beyond the period of the
emergency or war requiring it: Provided further, That the Commission may issue
by cable, telegraph, or radio a permit for the operation of a station on a vessel of
the United States at sea, effective in lieu of a license until said vessel shall return to
a port of the continental United States.
(b) Conditions
All applications for station licenses, or modifications or renewals thereof, shall set
forth such facts as the Commission by regulation may prescribe as to the
citizenship, character, and financial, technical, and other qualifications of the
applicant to operate the station; the ownership and location of the proposed station
and of the stations, if any, with which it is proposed to communicate; the
frequencies and the power desired to be used; the hours of the day or other periods
of time during which it is proposed to operate the station; the purposes for which
the station is to be used; and such other information as it may require. The
Commission, at any time after the filing of such original application and during the
term of any such license, may require from an applicant or licensee further written
statements of fact to enable it to determine whether such original application
should be granted or denied or such license revoked. Such application and/or such
statement of fact shall be signed by the applicant and/or licensee in any manner or
11

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 64 of 105
form, including by electronic means, as the Commission may prescribe by
regulation.
(c) Commercial communication
The Commission in granting any license for a station intended or used for
commercial communication between the United States or any Territory or
possession, continental or insular, subject to the jurisdiction of the United States,
and any foreign country, may impose any terms, conditions, or restrictions
authorized to be imposed with respect to submarine-cable licenses by section 35 of
this title.
(d) Summary of complaints
Each applicant for the renewal of a commercial or noncommercial television
license shall attach as an exhibit to the application a summary of written comments
and suggestions received from the public and maintained by the licensee (in
accordance with Commission regulations) that comment on the applicant's
programming, if any, and that are characterized by the commentor as constituting
violent programming.
12

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 65 of 105
47 U.S.C. § 309
(a) Considerations in granting application
Subject to the provisions of this section, the Commission shall determine, in the
case of each application filed with it to which section 308 of this title applies,
whether the public interest, convenience, and necessity will be served by the
granting of such application, and, if the Commission, upon examination of such
application and upon consideration of such other matters as the Commission may
officially notice, shall find that public interest, convenience, and necessity would
be served by the granting thereof, it shall grant such application.
(b) Time of granting application
Except as provided in subsection (c) of this section, no such application--
(1) for an instrument of authorization in the case of a station in the broadcasting or
common carrier services, or
(2) for an instrument of authorization in the case of a station in any of the
following categories:
(A) industrial radio positioning stations for which frequencies are assigned on an
exclusive basis,
(B) aeronautical en route stations,
(C) aeronautical advisory stations,
(D) airdrome control stations,
(E) aeronautical fixed stations, and
(F) such other stations or classes of stations, not in the broadcasting or common
carrier services, as the Commission shall by rule prescribe, shall be granted by the
Commission earlier than thirty days following issuance of public notice by the
Commission of the acceptance for filing of such application or of any substantial
amendment thereof.
(c) Applications not affected by subsection (b)
13

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 66 of 105
Subsection (b) of this section shall not apply--
(1) to any minor amendment of an application to which such subsection is
applicable, or
(2) to any application for--
(A) a minor change in the facilities of an authorized station,
(B) consent to an involuntary assignment or transfer under section 310(b) of this
title or to an assignment or transfer thereunder which does not involve a substantial
change in ownership or control,
(C) a license under section 319(c) of this title or, pending application for or grant
of such license, any special or temporary authorization to permit interim operation
to facilitate completion of authorized construction or to provide substantially the
same service as would be authorized by such license,
(D) extension of time to complete construction of authorized facilities,
(E) an authorization of facilities for remote pickups, studio links and similar
facilities for use in the operation of a broadcast station,
(F) authorizations pursuant to section 325(c) of this title where the programs to be
transmitted are special events not of a continuing nature,
(G) a special temporary authorization for nonbroadcast operation not to exceed
thirty days where no application for regular operation is contemplated to be filed or
not to exceed sixty days pending the filing of an application for such regular
operation, or
(H) an authorization under any of the proviso clauses of section 308(a) of this title.
(d) Petition to deny application; time; contents; reply; findings
(1) Any party in interest may file with the Commission a petition to deny any
application (whether as originally filed or as amended) to which subsection (b) of
this section applies at any time prior to the day of Commission grant thereof
without hearing or the day of formal designation thereof for hearing; except that
with respect to any classification of applications, the Commission from time to
14

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 67 of 105
time by rule may specify a shorter period (no less than thirty days following the
issuance of public notice by the Commission of the acceptance for filing of such
application or of any substantial amendment thereof), which shorter period shall be
reasonably related to the time when the applications would normally be reached for
processing. The petitioner shall serve a copy of such petition on the applicant. The
petition shall contain specific allegations of fact sufficient to show that the
petitioner is a party in interest and that a grant of the application would be prima
facie inconsistent with subsection (a) of this section (or subsection (k) of this
section in the case of renewal of any broadcast station license). Such allegations of
fact shall, except for those of which official notice may be taken, be supported by
affidavit of a person or persons with personal knowledge thereof. The applicant
shall be given the opportunity to file a reply in which allegations of fact or denials
thereof shall similarly be supported by affidavit.
(2) If the Commission finds on the basis of the application, the pleadings filed, or
other matters which it may officially notice that there are no substantial and
material questions of fact and that a grant of the application would be consistent
with subsection (a) of this section (or subsection (k) of this section in the case of
renewal of any broadcast station license), it shall make the grant, deny the petition,
and issue a concise statement of the reasons for denying the petition, which
statement shall dispose of all substantial issues raised by the petition. If a
substantial and material question of fact is presented or if the Commission for any
reason is unable to find that grant of the application would be consistent with
subsection (a) of this section (or subsection (k) of this section in the case of
renewal of any broadcast station license), it shall proceed as provided in subsection
(e) of this section.
(e) Hearings; intervention; evidence; burden of proof
If, in the case of any application to which subsection (a) of this section applies, a
substantial and material question of fact is presented or the Commission for any
reason is unable to make the finding specified in such subsection, it shall formally
designate the application for hearing on the ground or reasons then obtaining and
shall forthwith notify the applicant and all other known parties in interest of such
action and the grounds and reasons therefor, specifying with particularity the
matters and things in issue but not including issues or requirements phrased
generally. When the Commission has so designated an application for hearing the
parties in interest, if any, who are not notified by the Commission of such action
may acquire the status of a party to the proceeding thereon by filing a petition for
intervention showing the basis for their interest not more than thirty days after
15

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 68 of 105
publication of the hearing issues or any substantial amendment thereto in the
Federal Register. Any hearing subsequently held upon such application shall be a
full hearing in which the applicant and all other parties in interest shall be
permitted to participate. The burden of proceeding with the introduction of
evidence and the burden of proof shall be upon the applicant, except that with
respect to any issue presented by a petition to deny or a petition to enlarge the
issues, such burdens shall be as determined by the Commission.
(f) Temporary authorization of temporary operations under subsection (b)
When an application subject to subsection (b) of this section has been filed, the
Commission, notwithstanding the requirements of such subsection, may, if the
grant of such application is otherwise authorized by law and if it finds that there
are extraordinary circumstances requiring temporary operations in the public
interest and that delay in the institution of such temporary operations would
seriously prejudice the public interest, grant a temporary authorization,
accompanied by a statement of its reasons therefor, to permit such temporary
operations for a period not exceeding 180 days, and upon making like findings
may extend such temporary authorization for additional periods not to exceed 180
days. When any such grant of a temporary authorization is made, the Commission
shall give expeditious treatment to any timely filed petition to deny such
application and to any petition for rehearing of such grant filed under section 405
of this title.
(g) Classification of applications
The Commission is authorized to adopt reasonable classifications of applications
and amendments in order to effectuate the purposes of this section.
(h) Form and conditions of station licenses
Such station licenses as the Commission may grant shall be in such general form as
it may prescribe, but each license shall contain, in addition to other provisions, a
statement of the following conditions to which such license shall be subject: (1)
The station license shall not vest in the licensee any right to operate the station nor
any right in the use of the frequencies designated in the license beyond the term
thereof nor in any other manner than authorized therein; (2) neither the license nor
the right granted thereunder shall be assigned or otherwise transferred in violation
of this chapter; (3) every license issued under this chapter shall be subject in terms
to the right of use or control conferred by section 606 of this title.
16

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 69 of 105
(i) Random selection
(1) General authority
Except as provided in paragraph (5), if there is more than one application for any
initial license or construction permit, then the Commission shall have the authority
to grant such license or permit to a qualified applicant through the use of a system
of random selection.
(2) No license or construction permit shall be granted to an applicant selected
pursuant to paragraph (1) unless the Commission determines the qualifications of
such applicant pursuant to subsection (a) of this section and section 308(b) of this
title. When substantial and material questions of fact exist concerning such
qualifications, the Commission shall conduct a hearing in order to make such
determinations. For the purpose of making such determinations, the Commission
may, by rule, and notwithstanding any other provision of law--
(A) adopt procedures for the submission of all or part of the evidence in written
form;
(B) delegate the function of presiding at the taking of written evidence to
Commission employees other than administrative law judges; and
(C) omit the determination required by subsection (a) of this section with respect to
any application other than the one selected pursuant to paragraph (1).
(3)(A) The Commission shall establish rules and procedures to ensure that, in the
administration of any system of random selection under this subsection used for
granting licenses or construction permits for any media of mass communications,
significant preferences will be granted to applicants or groups of applicants, the
grant to which of the license or permit would increase the diversification of
ownership of the media of mass communications. To further diversify the
ownership of the media of mass communications, an additional significant
preference shall be granted to any applicant controlled by a member or members of
a minority group.
(B) The Commission shall have authority to require each qualified applicant
seeking a significant preference under subparagraph (A) to submit to the
Commission such information as may be necessary to enable the Commission to
make a determination regarding whether such applicant shall be granted such
17

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 70 of 105
preference. Such information shall be submitted in such form, at such times, and in
accordance with such procedures, as the Commission may require.
(C) For purposes of this paragraph:
(i) The term “media of mass communications” includes television, radio, cable
television, multipoint distribution service, direct broadcast satellite service, and
other services, the licensed facilities of which may be substantially devoted toward
providing programming or other information services within the editorial control
of the licensee.
(ii) The term “minority group” includes Blacks, Hispanics, American Indians,
Alaska Natives, Asians, and Pacific Islanders.
(4)(A) The Commission shall, after notice and opportunity for hearing, prescribe
rules establishing a system of random selection for use by the Commission under
this subsection in any instance in which the Commission, in its discretion,
determines that such use is appropriate for the granting of any license or permit in
accordance with paragraph (1).
(B) The Commission shall have authority to amend such rules from time to time to
the extent necessary to carry out the provisions of this subsection. Any such
amendment shall be made after notice and opportunity for hearing.
(C) Not later than 180 days after August 10, 1993, the Commission shall prescribe
such transfer disclosures and antitrafficking restrictions and payment schedules as
are necessary to prevent the unjust enrichment of recipients of licenses or permits
as a result of the methods employed to issue licenses under this subsection.
(5) Termination of authority
(A) Except as provided in subparagraph (B), the Commission shall not issue any
license or permit using a system of random selection under this subsection after
July 1, 1997.
(B) Subparagraph (A) of this paragraph shall not apply with respect to licenses or
permits for stations described in section 397(6) of this title.
(j) Use of competitive bidding
18

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 71 of 105
(1) General authority
If, consistent with the obligations described in paragraph (6)(E), mutually
exclusive applications are accepted for any initial license or construction permit,
then, except as provided in paragraph (2), the Commission shall grant the license
or permit to a qualified applicant through a system of competitive bidding that
meets the requirements of this subsection.
(2) Exemptions
The competitive bidding authority granted by this subsection shall not apply to
licenses or construction permits issued by the Commission--
(A) for public safety radio services, including private internal radio services used
by State and local governments and non-government entities and including
emergency road services provided by not-for-profit organizations, that--
(i) are used to protect the safety of life, health, or property; and
(ii) are not made commercially available to the public;
(B) for initial licenses or construction permits for digital television service given to
existing terrestrial broadcast licensees to replace their analog television service
licenses; or
(C) for stations described in section 397(6) of this title.
(3) Design of systems of competitive bidding
For each class of licenses or permits that the Commission grants through the use of
a competitive bidding system, the Commission shall, by regulation, establish a
competitive bidding methodology. The Commission shall seek to design and test
multiple alternative methodologies under appropriate circumstances. The
Commission shall, directly or by contract, provide for the design and conduct (for
purposes of testing) of competitive bidding using a contingent combinatorial
bidding system that permits prospective bidders to bid on combinations or groups
of licenses in a single bid and to enter multiple alternative bids within a single
bidding round. In identifying classes of licenses and permits to be issued by
competitive bidding, in specifying eligibility and other characteristics of such
licenses and permits, and in designing the methodologies for use under this
19

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 72 of 105
subsection, the Commission shall include safeguards to protect the public interest
in the use of the spectrum and shall seek to promote the purposes specified in
section 151 of this title and the following objectives:
(A) the development and rapid deployment of new technologies, products, and
services for the benefit of the public, including those residing in rural areas,
without administrative or judicial delays;
(B) promoting economic opportunity and competition and ensuring that new and
innovative technologies are readily accessible to the American people by avoiding
excessive concentration of licenses and by disseminating licenses among a wide
variety of applicants, including small businesses, rural telephone companies, and
businesses owned by members of minority groups and women;
(C) recovery for the public of a portion of the value of the public spectrum
resource made available for commercial use and avoidance of unjust enrichment
through the methods employed to award uses of that resource;
(D) efficient and intensive use of the electromagnetic spectrum;
(E) ensure that, in the scheduling of any competitive bidding under this subsection,
an adequate period is allowed; and
(i) before issuance of bidding rules, to permit notice and comment on proposed
auction procedures; and
(ii) after issuance of bidding rules, to ensure that interested parties have a sufficient
time to develop business plans, assess market conditions, and evaluate the
availability of equipment for the relevant services.
(F) for any auction of eligible frequencies described in section 923(g)(2) of this
title, the recovery of 110 percent of estimated relocation costs as provided to the
Commission pursuant to section 923(g)(4) of this title.
(4) Contents of regulations
In prescribing regulations pursuant to paragraph (3), the Commission shall--
(A) consider alternative payment schedules and methods of calculation, including
lump sums or guaranteed installment payments, with or without royalty payments,
20

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 73 of 105
or other schedules or methods that promote the objectives described in paragraph
(3)(B), and combinations of such schedules and methods;
(B) include performance requirements, such as appropriate deadlines and penalties
for performance failures, to ensure prompt delivery of service to rural areas, to
prevent stockpiling or warehousing of spectrum by licensees or permittees, and to
promote investment in and rapid deployment of new technologies and services;
(C) consistent with the public interest, convenience, and necessity, the purposes of
this chapter, and the characteristics of the proposed service, prescribe area
designations and bandwidth assignments that promote (i) an equitable distribution
of licenses and services among geographic areas, (ii) economic opportunity for a
wide variety of applicants, including small businesses, rural telephone companies,
and businesses owned by members of minority groups and women, and (iii)
investment in and rapid deployment of new technologies and services;
(D) ensure that small businesses, rural telephone companies, and businesses owned
by members of minority groups and women are given the opportunity to participate
in the provision of spectrum-based services, and, for such purposes, consider the
use of tax certificates, bidding preferences, and other procedures;
(E) require such transfer disclosures and antitrafficking restrictions and payment
schedules as may be necessary to prevent unjust enrichment as a result of the
methods employed to issue licenses and permits; and
(F) prescribe methods by which a reasonable reserve price will be required, or a
minimum bid will be established, to obtain any license or permit being assigned
pursuant to the competitive bidding, unless the Commission determines that such a
reserve price or minimum bid is not in the public interest.
(5) Bidder and licensee qualification
No person shall be permitted to participate in a system of competitive bidding
pursuant to this subsection unless such bidder submits such information and
assurances as the Commission may require to demonstrate that such bidder's
application is acceptable for filing. No license shall be granted to an applicant
selected pursuant to this subsection unless the Commission determines that the
applicant is qualified pursuant to subsection (a) of this section and sections 308(b)
and 310 of this title. Consistent with the objectives described in paragraph (3), the
Commission shall, by regulation, prescribe expedited procedures consistent with
21

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 74 of 105
the procedures authorized by subsection (i)(2) of this section for the resolution of
any substantial and material issues of fact concerning qualifications.
(6) Rules of construction
Nothing in this subsection, or in the use of competitive bidding, shall--
(A) alter spectrum allocation criteria and procedures established by the other
provisions of this chapter;
(B) limit or otherwise affect the requirements of subsection (h) of this section,
section 301, 304, 307, 310, or 606 of this title, or any other provision of this
chapter (other than subsections (d)(2) and (e) of this section);
(C) diminish the authority of the Commission under the other provisions of this
chapter to regulate or reclaim spectrum licenses;
(D) be construed to convey any rights, including any expectation of renewal of a
license, that differ from the rights that apply to other licenses within the same
service that were not issued pursuant to this subsection;
(E) be construed to relieve the Commission of the obligation in the public interest
to continue to use engineering solutions, negotiation, threshold qualifications,
service regulations, and other means in order to avoid mutual exclusivity in
application and licensing proceedings;
(F) be construed to prohibit the Commission from issuing nationwide, regional, or
local licenses or permits;
(G) be construed to prevent the Commission from awarding licenses to those
persons who make significant contributions to the development of a new
telecommunications service or technology; or
(H) be construed to relieve any applicant for a license or permit of the obligation to
pay charges imposed pursuant to section 158 of this title.
(7) Consideration of revenues in public interest determinations
(A) Consideration prohibited
22

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 75 of 105
In making a decision pursuant to section 303(c) of this title to assign a band of
frequencies to a use for which licenses or permits will be issued pursuant to this
subsection, and in prescribing regulations pursuant to paragraph (4)(C) of this
subsection, the Commission may not base a finding of public interest, convenience,
and necessity on the expectation of Federal revenues from the use of a system of
competitive bidding under this subsection.
(B) Consideration limited
In prescribing regulations pursuant to paragraph (4)(A) of this subsection, the
Commission may not base a finding of public interest, convenience, and necessity
solely or predominantly on the expectation of Federal revenues from the use of a
system of competitive bidding under this subsection.
(C) Consideration of demand for spectrum not affected
Nothing in this paragraph shall be construed to prevent the Commission from
continuing to consider consumer demand for spectrum-based services.
(8) Treatment of revenues
(A) General rule
Except as provided in subparagraphs (B), (D), and (E), all proceeds from the use of
a competitive bidding system under this subsection shall be deposited in the
Treasury in accordance with chapter 33 of Title 31.
(B) Retention of revenues
Notwithstanding subparagraph (A), the salaries and expenses account of the
Commission shall retain as an offsetting collection such sums as may be necessary
from such proceeds for the costs of developing and implementing the program
required by this subsection. Such offsetting collections shall be available for
obligation subject to the terms and conditions of the receiving appropriations
account, and shall be deposited in such accounts on a quarterly basis. Such
offsetting collections are authorized to remain available until expended. No sums
may be retained under this subparagraph during any fiscal year beginning after
September 30, 1998, if the annual report of the Commission under section 154(k)
of this title for the second preceding fiscal year fails to include in the itemized
statement required by paragraph (3) of such section a statement of each
23

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 76 of 105
expenditure made for purposes of conducting competitive bidding under this
subsection during such second preceding fiscal year.
(C) Deposit and use of auction escrow accounts
Any deposits the Commission may require for the qualification of any person to
bid in a system of competitive bidding pursuant to this subsection shall be
deposited in an interest bearing account at a financial institution designated for
purposes of this subsection by the Commission (after consultation with the
Secretary of the Treasury). Within 45 days following the conclusion of the
competitive bidding--
(i) the deposits of successful bidders shall be paid to the Treasury, except as
otherwise provided in subparagraph (E)(ii);
(ii) the deposits of unsuccessful bidders shall be returned to such bidders; and
(iii) the interest accrued to the account shall be transferred to the
Telecommunications Development Fund established pursuant to section 614 of this
title.
(D) Disposition of cash proceeds
Cash proceeds attributable to the auction of any eligible frequencies described in
section 923(g)(2) of this title shall be deposited in the Spectrum Relocation Fund
established under section 928 of this title, and shall be available in accordance with
that section.
(E) Transfer of receipts
(i) Establishment of fund
There is established in the Treasury of the United States a fund to be known as the
Digital Television Transition and Public Safety Fund.
(ii) Proceeds for funds
Notwithstanding subparagraph (A), the proceeds (including deposits and upfront
payments from successful bidders) from the use of a competitive bidding system
24

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 77 of 105
under this subsection with respect to recovered analog spectrum shall be deposited
in the Digital Television Transition and Public Safety Fund.
(iii) Transfer of amount to Treasury
On September 30, 2009, the Secretary shall transfer $7,363,000,000 from the
Digital Television Transition and Public Safety Fund to the general fund of the
Treasury.
(iv) Recovered analog spectrum
For purposes of clause (i), the term “recovered analog spectrum” has the meaning
provided in paragraph (15)(C)(vi).
(9) Use of former government spectrum
The Commission shall, not later than 5 years after August 10, 1993, issue licenses
and permits pursuant to this subsection for the use of bands of frequencies that--
(A) in the aggregate span not less than 10 megahertz; and
(B) have been reassigned from Government use pursuant to part B of the National
Telecommunications and Information Administration Organization Act [47
U.S.C.A. § 921 et. seq.].
(10) Authority contingent on availability of additional spectrum
(A) Initial conditions
The Commission's authority to issue licenses or permits under this subsection shall
not take effect unless--
(i) the Secretary of Commerce has submitted to the Commission the report
required by section 113(d)(1) of the National Telecommunications and Information
Administration Organization Act [47 U.S.C.A. § 923(d)(1)];
(ii) such report recommends for immediate reallocation bands of frequencies that,
in the aggregate, span not less than 50 megahertz;
25

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 78 of 105
(iii) such bands of frequencies meet the criteria required by section 113(a) of such
Act [47 U.S.C.A. § 923(a)]; and
(iv) the Commission has completed the rulemaking required by section
332(c)(1)(D) of this title.
(B) Subsequent conditions
The Commission's authority to issue licenses or permits under this subsection on
and after 2 years after August 10, 1993, shall cease to be effective if--
(i) the Secretary of Commerce has failed to submit the report required by section
113(a) of the National Telecommunications and Information Administration
Organization Act [47 U.S.C.A. § 923(a)];
(ii) the President has failed to withdraw and limit assignments of frequencies as
required by paragraphs (1) and (2) of section 114(a) of such Act [47 U.S.C.A. §
924(a)];
(iii) the Commission has failed to issue the regulations required by section 115(a)
of such Act [47 U.S.C.A. § 925(a)];
(iv) the Commission has failed to complete and submit to Congress, not later than
18 months after August 10, 1993, a study of current and future spectrum needs of
State and local government public safety agencies through the year 2010, and a
specific plan to ensure that adequate frequencies are made available to public
safety licensees; or
(v) the Commission has failed under section 332(c)(3) of this title to grant or deny
within the time required by such section any petition that a State has filed within
90 days after August 10, 1993; until such failure has been corrected.
(11) Termination
The authority of the Commission to grant a license or permit under this subsection
shall expire September 30, 2012.
(12) Evaluation
26

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 79 of 105
Not later than September 30, 1997, the Commission shall conduct a public inquiry
and submit to the Congress a report--
(A) containing a statement of the revenues obtained, and a projection of the future
revenues, from the use of competitive bidding systems under this subsection;
(B) describing the methodologies established by the Commission pursuant to
paragraphs (3) and (4);
(C) comparing the relative advantages and disadvantages of such methodologies in
terms of attaining the objectives described in such paragraphs;
(D) evaluating whether and to what extent--
(i) competitive bidding significantly improved the efficiency and effectiveness of
the process for granting radio spectrum licenses;
(ii) competitive bidding facilitated the introduction of new spectrum-based
technologies and the entry of new companies into the telecommunications market;
(iii) competitive bidding methodologies have secured prompt delivery of service to
rural areas and have adequately addressed the needs of rural spectrum users; and
(iv) small businesses, rural telephone companies, and businesses owned by
members of minority groups and women were able to participate successfully in
the competitive bidding process; and
(E) recommending any statutory changes that are needed to improve the
competitive bidding process.
(13) Recovery of value of public spectrum in connection with pioneer preferences
(A) In general
Notwithstanding paragraph (6)(G), the Commission shall not award licenses
pursuant to a preferential treatment accorded by the Commission to persons who
make significant contributions to the development of a new telecommunications
service or technology, except in accordance with the requirements of this
paragraph.
27

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 80 of 105
(B) Recovery of value
The Commission shall recover for the public a portion of the value of the public
spectrum resource made available to such person by requiring such person, as a
condition for receipt of the license, to agree to pay a sum determined by--
(i) identifying the winning bids for the licenses that the Commission determines
are most reasonably comparable in terms of bandwidth, scope of service area,
usage restrictions, and other technical characteristics to the license awarded to such
person, and excluding licenses that the Commission determines are subject to
bidding anomalies due to the award of preferential treatment;
(ii) dividing each such winning bid by the population of its service area
(hereinafter referred to as the per capita bid amount);
(iii) computing the average of the per capita bid amounts for the licenses identified
under clause (i);
(iv) reducing such average amount by 15 percent; and
(v) multiplying the amount determined under clause (iv) by the population of the
service area of the license obtained by such person.
(C) Installments permitted
The Commission shall require such person to pay the sum required by
subparagraph (B) in a lump sum or in guaranteed installment payments, with or
without royalty payments, over a period of not more than 5 years.
(D) Rulemaking on pioneer preferences
Except with respect to pending applications described in clause (iv) of this
subparagraph, the Commission shall prescribe regulations specifying the
procedures and criteria by which the Commission will evaluate applications for
preferential treatment in its licensing processes (by precluding the filing of
mutually exclusive applications) for persons who make significant contributions to
the development of a new service or to the development of new technologies that
substantially enhance an existing service. Such regulations shall--
28

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 81 of 105
(i) specify the procedures and criteria by which the significance of such
contributions will be determined, after an opportunity for review and verification
by experts in the radio sciences drawn from among persons who are not employees
of the Commission or by any applicant for such preferential treatment;
(ii) include such other procedures as may be necessary to prevent unjust
enrichment by ensuring that the value of any such contribution justifies any
reduction in the amounts paid for comparable licenses under this subsection;
(iii) be prescribed not later than 6 months after December 8, 1994;
(iv) not apply to applications that have been accepted for filing on or before
September 1, 1994; and
(v) cease to be effective on the date of the expiration of the Commission's authority
under subparagraph (F).
(E) Implementation with respect to pending applications.
--In applying this paragraph to any broadband licenses in the personal
communications service awarded pursuant to the preferential treatment accorded
by the Federal Communications Commission in the Third Report and Order in
General Docket 90-314 (FCC 93-550, released February 3, 1994)--
(i) the Commission shall not reconsider the award of preferences in such Third
Report and Order, and the Commission shall not delay the grant of licenses based
on such awards more than 15 days following December 8, 1994, and the award of
such preferences and licenses shall not be subject to administrative or judicial
review;
(ii) the Commission shall not alter the bandwidth or service areas designated for
such licenses in such Third Report and Order;
(iii) except as provided in clause (v), the Commission shall use, as the most
reasonably comparable licenses for purposes of subparagraph (B)(i), the broadband
licenses in the personal communications service for blocks A and B for the 20
largest markets (ranked by population) in which no applicant has obtained
preferential treatment;
29

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 82 of 105
(iv) for purposes of subparagraph (C), the Commission shall permit guaranteed
installment payments over a period of 5 years, subject to--
(I) the payment only of interest on unpaid balances during the first 2 years,
commencing not later than 30 days after the award of the license (including any
preferential treatment used in making such award) is final and no longer subject to
administrative or judicial review, except that no such payment shall be required
prior to the date of completion of the auction of the comparable licenses described
in clause (iii); and
(II) payment of the unpaid balance and interest thereon after the end of such 2
years in accordance with the regulations prescribed by the Commission; and
(v) the Commission shall recover with respect to broadband licenses in the
personal communications service an amount under this paragraph that is equal to
not less than $400,000,000, and if such amount is less than $400,000,000, the
Commission shall recover an amount equal to $400,000,000 by allocating such
amount among the holders of such licenses based on the population of the license
areas held by each licensee.
The Commission shall not include in any amounts required to be collected under
clause (v) the interest on unpaid balances required to be collected under clause (iv).
(F) Expiration
The authority of the Commission to provide preferential treatment in licensing
procedures (by precluding the filing of mutually exclusive applications) to persons
who make significant contributions to the development of a new service or to the
development of new technologies that substantially enhance an existing service
shall expire on August 5, 1997.
(G) Effective date
This paragraph shall be effective on December 8, 1994, and apply to any licenses
issued on or after August 1, 1994, by the Federal Communications Commission
pursuant to any licensing procedure that provides preferential treatment (by
precluding the filing of mutually exclusive applications) to persons who make
significant contributions to the development of a new service or to the
development of new technologies that substantially enhance an existing service.
30

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 83 of 105
(14) Auction of recaptured broadcast television spectrum
(A) Limitations on terms of terrestrial full-power television broadcast licenses
A full-power television broadcast license that authorizes analog television service
may not be renewed to authorize such service for a period that extends beyond
June 12, 2009.
(B) Spectrum reversion and resale
(i) The Commission shall--
(I) ensure that, as licenses for analog television service expire pursuant to
subparagraph (A), each licensee shall cease using electromagnetic spectrum
assigned to such service according to the Commission's direction; and
(II) reclaim and organize the electromagnetic spectrum in a manner consistent with
the objectives described in paragraph (3) of this subsection.
(ii) Licensees for new services occupying spectrum reclaimed pursuant to clause (i)
shall be assigned in accordance with this subsection.
(C) Certain limitations on qualified bidders prohibited
In prescribing any regulations relating to the qualification of bidders for spectrum
reclaimed pursuant to subparagraph (B)(i), the Commission, for any license that
may be used for any digital television service where the grade A contour of the
station is projected to encompass the entirety of a city with a population in excess
of 400,000 (as determined using the 1990 decennial census), shall not--
(i) preclude any party from being a qualified bidder for such spectrum on the basis
of--
(I) the Commission's duopoly rule (47 C.F.R. 73.3555(b)); or
(II) the Commission's newspaper cross-ownership rule (47 C.F.R. 73.3555(d)); or
(ii) apply either such rule to preclude such a party that is a winning bidder in a
competitive bidding for such spectrum from using such spectrum for digital
television service.
31

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 84 of 105
(D) Redesignated (C)
(15) Commission to determine timing of auctions
(A) Commission authority
Subject to the provisions of this subsection (including paragraph (11)), but
notwithstanding any other provision of law, the Commission shall determine the
timing of and deadlines for the conduct of competitive bidding under this
subsection, including the timing of and deadlines for qualifying for bidding;
conducting auctions; collecting, depositing, and reporting revenues; and
completing licensing processes and assigning licenses.
(B) Termination of portions of auctions 31 and 44
Except as provided in subparagraph (C), the Commission shall not commence or
conduct auctions 31 and 44 on June 19, 2002, as specified in the public notices of
March 19, 2002, and March 20, 2002 (DA 02-659 and DA 02-563).
(C) Exception
(i) Blocks excepted
Subparagraph (B) shall not apply to the auction of--
(I) the C-block of licenses on the bands of frequencies located at 710-716
megahertz, and 740-746 megahertz; or
(II) the D-block of licenses on the bands of frequencies located at 716-722
megahertz.
(ii) Eligible bidders
The entities that shall be eligible to bid in the auction of the C-block and D-block
licenses described in clause (i) shall be those entities that were qualified entities,
and that submitted applications to participate in auction 44, by May 8, 2002, as part
of the original auction 44 short form filing deadline.
(iii) Auction deadlines for excepted blocks
32

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 85 of 105
Notwithstanding subparagraph (B), the auction of the C-block and D-block
licenses described in clause (i) shall be commenced no earlier than August 19,
2002, and no later than September 19, 2002, and the proceeds of such auction shall
be deposited in accordance with paragraph (8) not later than December 31, 2002.
(iv) Report
Within one year after the date of enactment of this paragraph, the Commission
shall submit a report to Congress--
(I) specifying when the Commission intends to reschedule auctions 31 and 44
(other than the blocks excepted by clause (i)); and
(II) describing the progress made by the Commission in the digital television
transition and in the assignment and allocation of additional spectrum for advanced
mobile communications services that warrants the scheduling of such auctions.
(v) Additional deadlines for recovered analog spectrum
Notwithstanding subparagraph (B), the Commission shall conduct the auction of
the licenses for recovered analog spectrum by commencing the bidding not later
than January 28, 2008, and shall deposit the proceeds of such auction in
accordance with paragraph (8)(E)(ii) not later than June 30, 2008.
(vi) Recovered analog spectrum
For purposes of clause (v), the term “recovered analog spectrum” means the
spectrum between channels 52 and 69, inclusive (between frequencies 698 and 806
megahertz, inclusive) reclaimed from analog television service broadcasting under
paragraph (14), other than--
(I) the spectrum required by section 337 to be made available for public safety
services; and
(II) the spectrum auctioned prior to February 8, 2006.
(D) Return of payments
Within one month after the date of enactment of this paragraph, the Commission
shall return to the bidders for licenses in the A-block, B-block, and E-block of
33

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 86 of 105
auction 44 the full amount of all upfront payments made by such bidders for such
licenses.
(16) Special auction provisions for eligible frequencies
(A) Special regulations
The Commission shall revise the regulations prescribed under paragraph (4)(F) of
this subsection to prescribe methods by which the total cash proceeds from any
auction of eligible frequencies described in section 923(g)(2) of this title shall at
least equal 110 percent of the total estimated relocation costs provided to the
Commission pursuant to section 923(g)(4) of this title.
(B) Conclusion of auctions contingent on minimum proceeds
The Commission shall not conclude any auction of eligible frequencies described
in section 923(g)(2) of this title if the total cash proceeds attributable to such
spectrum are less than 110 percent of the total estimated relocation costs provided
to the Commission pursuant to section 923(g)(4) of this title. If the Commission is
unable to conclude an auction for the foregoing reason, the Commission shall
cancel the auction, return within 45 days after the auction cancellation date any
deposits from participating bidders held in escrow, and absolve such bidders from
any obligation to the United States to bid in any subsequent reauction of such
spectrum.
(C) Authority to issue prior to deauthorization
In any auction conducted under the regulations required by subparagraph (A), the
Commission may grant a license assigned for the use of eligible frequencies prior
to the termination of an eligible Federal entity's authorization. However, the
Commission shall condition such license by requiring that the licensee cannot
cause harmful interference to such Federal entity until such entity's authorization
has been terminated by the National Telecommunications and Information
Administration.
(k) Broadcast station renewal procedures
(1) Standards for renewal
34

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 87 of 105
If the licensee of a broadcast station submits an application to the Commission for
renewal of such license, the Commission shall grant the application if it finds, with
respect to that station, during the preceding term of its license--
(A) the station has served the public interest, convenience, and necessity;
(B) there have been no serious violations by the licensee of this chapter or the rules
and regulations of the Commission; and
(C) there have been no other violations by the licensee of this chapter or the rules
and regulations of the Commission which, taken together, would constitute a
pattern of abuse.
(2) Consequence of failure to meet standard
If any licensee of a broadcast station fails to meet the requirements of this
subsection, the Commission may deny the application for renewal in accordance
with paragraph (3), or grant such application on terms and conditions as are
appropriate, including renewal for a term less than the maximum otherwise
permitted.
(3) Standards for denial
If the Commission determines, after notice and opportunity for a hearing as
provided in subsection (e) of this section, that a licensee has failed to meet the
requirements specified in paragraph (1) and that no mitigating factors justify the
imposition of lesser sanctions, the Commission shall--
(A) issue an order denying the renewal application filed by such licensee under
section 308 of this title; and
(B) only thereafter accept and consider such applications for a construction permit
as may be filed under section 308 of this title specifying the channel or
broadcasting facilities of the former licensee.
(4) Competitor consideration prohibited
In making the determinations specified in paragraph (1) or (2), the Commission
shall not consider whether the public interest, convenience, and necessity might be
served by the grant of a license to a person other than the renewal applicant.
35

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 88 of 105
(l) Applicability of competitive bidding to pending comparative licensing cases
With respect to competing applications for initial licenses or construction permits
for commercial radio or television stations that were filed with the Commission
before July 1, 1997, the Commission shall--
(1) have the authority to conduct a competitive bidding proceeding pursuant to
subsection (j) of this section to assign such license or permit;
(2) treat the persons filing such applications as the only persons eligible to be
qualified bidders for purposes of such proceeding; and
(3) waive any provisions of its regulations necessary to permit such persons to
enter an agreement to procure the removal of a conflict between their applications
during the 180-day period beginning on August 5, 1997.
36

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 89 of 105
47 U.S.C. § 319
(a) Requirements
No license shall be issued under the authority of this chapter for the operation of
any station unless a permit for its construction has been granted by the
Commission. The application for a construction permit shall set forth such facts as
the Commission by regulation may prescribe as to the citizenship, character, and
the financial, technical, and other ability of the applicant to construct and operate
the station, the ownership and location of the proposed station and of the station or
stations with which it is proposed to communicate, the frequencies desired to be
used, the hours of the day or other periods of time during which it is proposed to
operate the station, the purpose for which the station is to be used, the type of
transmitting apparatus to be used, the power to be used, the date upon which the
station is expected to be completed and in operation, and such other information as
the Commission may require. Such application shall be signed by the applicant in
any manner or form, including by electronic means, as the Commission may
prescribe by regulation.
(b) Time limitation; forfeiture
Such permit for construction shall show specifically the earliest and latest dates
between which the actual operation of such station is expected to begin, and shall
provide that said permit will be automatically forfeited if the station is not ready
for operation within the time specified or within such further time as the
Commission may allow, unless prevented by causes not under the control of the
grantee.
(c) Licenses for operation
Upon the completion of any station for the construction or continued construction
of which a permit has been granted, and upon it being made to appear to the
Commission that all the terms, conditions, and obligations set forth in the
application and permit have been fully met, and that no cause or circumstance
arising or first coming to the knowledge of the Commission since the granting of
the permit would, in the judgment of the Commission, make the operation of such
station against the public interest, the Commission shall issue a license to the
lawful holder of said permit for the operation of said station. Said license shall
conform generally to the terms of said permit. The provisions of section 309(a)-(g)
37

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 90 of 105
of this title shall not apply with respect to any station license the issuance of which
is provided for and governed by the provisions of this subsection.
(d) Government, amateur, or mobile station; waiver
A permit for construction shall not be required for Government stations, amateur
stations, or mobile stations. A permit for construction shall not be required for
public coast stations, privately owned fixed microwave stations, or stations
licensed to common carriers, unless the Commission determines that the public
interest, convenience, and necessity would be served by requiring such permits for
any such stations. With respect to any broadcasting station, the Commission shall
not have any authority to waive the requirement of a permit for construction,
except that the Commission may by regulation determine that a permit shall not be
required for minor changes in the facilities of authorized broadcast stations. With
respect to any other station or class of stations, the Commission shall not waive the
requirement for a construction permit unless the Commission determines that the
public interest, convenience, and necessity would be served by such a waiver.
38

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 91 of 105
47 U.S.C. § 402
(a) Procedure
Any proceeding to enjoin, set aside, annul, or suspend any order of the
Commission under this chapter (except those appealable under subsection (b) of
this section) shall be brought as provided by and in the manner prescribed in
chapter 158 of Title 28.
(b) Right to appeal
Appeals may be taken from decisions and orders of the Commission to the United
States Court of Appeals for the District of Columbia in any of the following cases:
(1) By any applicant for a construction permit or station license, whose application
is denied by the Commission.
(2) By any applicant for the renewal or modification of any such instrument of
authorization whose application is denied by the Commission.
(3) By any party to an application for authority to transfer, assign, or dispose of
any such instrument of authorization, or any rights thereunder, whose application is
denied by the Commission.
(4) By any applicant for the permit required by section 325 of this title whose
application has been denied by the Commission, or by any permittee under said
section whose permit has been revoked by the Commission.
(5) By the holder of any construction permit or station license which has been
modified or revoked by the Commission.
(6) By any other person who is aggrieved or whose interests are adversely affected
by any order of the Commission granting or denying any application described in
paragraphs (1), (2), (3), (4), and (9) of this subsection.
(7) By any person upon whom an order to cease and desist has been served under
section 312 of this title.
(8) By any radio operator whose license has been suspended by the Commission.
39

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 92 of 105
(9) By any applicant for authority to provide interLATA services under section 271
of this title whose application is denied by the Commission.
(10) By any person who is aggrieved or whose interests are adversely affected by a
determination made by the Commission under section 618(a)(3) of this title.
(c) Filing notice of appeal; contents; jurisdiction; temporary orders
Such appeal shall be taken by filing a notice of appeal with the court within thirty
days from the date upon which public notice is given of the decision or order
complained of. Such notice of appeal shall contain a concise statement of the
nature of the proceedings as to which the appeal is taken; a concise statement of
the reasons on which the appellant intends to rely, separately stated and numbered;
and proof of service of a true copy of said notice and statement upon the
Commission. Upon filing of such notice, the court shall have jurisdiction of the
proceedings and of the questions determined therein and shall have power, by
order, directed to the Commission or any other party to the appeal, to grant such
temporary relief as it may deem just and proper. Orders granting temporary relief
may be either affirmative or negative in their scope and application so as to permit
either the maintenance of the status quo in the matter in which the appeal is taken
or the restoration of a position or status terminated or adversely affected by the
order appealed from and shall, unless otherwise ordered by the court, be effective
pending hearing and determination of said appeal and compliance by the
Commission with the final judgment of the court rendered in said appeal.
(d) Notice to interested parties; filing of record
Upon the filing of any such notice of appeal the appellant shall, not later than five
days after the filing of such notice, notify each person shown by the records of the
Commission to be interested in said appeal of the filing and pendency of the same.
The Commission shall file with the court the record upon which the order
complained of was entered, as provided in section 2112 of Title 28.
(e) Intervention
Within thirty days after the filing of any such appeal any interested person may
intervene and participate in the proceedings had upon said appeal by filing with the
court a notice of intention to intervene and a verified statement showing the nature
of the interest of such party, together with proof of service of true copies of said
notice and statement, both upon appellant and upon the Commission. Any person
40

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 93 of 105
who would be aggrieved or whose interest would be adversely affected by a
reversal or modification of the order of the Commission complained of shall be
considered an interested party.
(f) Records and briefs
The record and briefs upon which any such appeal shall be heard and determined
by the court shall contain such information and material, and shall be prepared
within such time and in such manner as the court may by rule prescribe.
(g) Time of hearing; procedure
The court shall hear and determine the appeal upon the record before it in the
manner prescribed by section 706 of Title 5.
(h) Remand
In the event that the court shall render a decision and enter an order reversing the
order of the Commission, it shall remand the case to the Commission to carry out
the judgment of the court and it shall be the duty of the Commission, in the
absence of the proceedings to review such judgment, to forthwith give effect
thereto, and unless otherwise ordered by the court, to do so upon the basis of the
proceedings already had and the record upon which said appeal was heard and
determined.
(i) Judgment for costs
The court may, in its discretion, enter judgment for costs in favor of or against an
appellant, or other interested parties intervening in said appeal, but not against the
Commission, depending upon the nature of the issues involved upon said appeal
and the outcome thereof.
(j) Finality of decision; review by Supreme Court
The court's judgment shall be final, subject, however, to review by the Supreme
Court of the United States upon writ of certiorari on petition therefor under section
1254 of Title 28, by the appellant, by the Commission, or by any interested party
intervening in the appeal, or by certification by the court pursuant to the provisions
of that section.
41

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 94 of 105
47 U.S.C. § 405
(a) After an order, decision, report, or action has been made or taken in any
proceeding by the Commission, or by any designated authority within the
Commission pursuant to a delegation under section 155(c)(1) of this title, any party
thereto, or any other person aggrieved or whose interests are adversely affected
thereby, may petition for reconsideration only to the authority making or taking the
order, decision, report, or action; and it shall be lawful for such authority, whether
it be the Commission or other authority designated under section 155(c)(1) of this
title, in its discretion, to grant such a reconsideration if sufficient reason therefor be
made to appear. A petition for reconsideration must be filed within thirty days
from the date upon which public notice is given of the order, decision, report, or
action complained of. No such application shall excuse any person from complying
with or obeying any order, decision, report, or action of the Commission, or
operate in any manner to stay or postpone the enforcement thereof, without the
special order of the Commission. The filing of a petition for reconsideration shall
not be a condition precedent to judicial review of any such order, decision, report,
or action, except where the party seeking such review (1) was not a party to the
proceedings resulting in such order, decision, report, or action, or (2) relies on
questions of fact or law upon which the Commission, or designated authority
within the Commission, has been afforded no opportunity to pass. The
Commission, or designated authority within the Commission, shall enter an order,
with a concise statement of the reasons therefor, denying a petition for
reconsideration or granting such petition, in whole or in part, and ordering such
further proceedings as may be appropriate: Provided, That in any case where such
petition relates to an instrument of authorization granted without a hearing, the
Commission, or designated authority within the Commission, shall take such
action within ninety days of the filing of such petition. Reconsiderations shall be
governed by such general rules as the Commission may establish, except that no
evidence other than newly discovered evidence, evidence which has become
available only since the original taking of evidence, or evidence which the
Commission or designated authority within the Commission believes should have
been taken in the original proceeding shall be taken on any reconsideration. The
time within which a petition for review must be filed in a proceeding to which
section 402(a) of this title applies, or within which an appeal must be taken under
section 402(b) of this title in any case, shall be computed from the date upon which
the Commission gives public notice of the order, decision, report, or action
complained of.
42

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 95 of 105
(b)(1) Within 90 days after receiving a petition for reconsideration of an order
concluding a hearing under section 204(a) of this title or concluding an
investigation under section 208(b) of this title, the Commission shall issue an order
granting or denying such petition.
(2) Any order issued under paragraph (1) shall be a final order and may be
appealed under section 402(a) of this title.
43

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 96 of 105
47 C.F.R. § 1.46
(a) It is the policy of the Commission that extensions of time shall not be routinely
granted.
(b) Motions for extension of time in which to file responses to petitions for
rulemaking, replies to such responses, comments filed in response to notice of
proposed rulemaking, replies to such comments and other filings in rulemaking
proceedings conducted under Subpart C of this part shall be filed at least 7 days
before the filing date. If a timely motion is denied, the responses and comments,
replies thereto, or other filings need not be filed until 2 business days after the
Commission acts on the motion. In emergency situations, the Commission will
consider a late-filed motion for a brief extension of time related to the duration of
the emergency and will consider motions for acceptance of comments, reply
comments or other filings made after the filing date.
(c) If a motion for extension of time in which to make filings in proceedings other
than notice and comment rule making proceedings is filed less than 7 days prior to
the filing day, the party filing the motion shall (in addition to serving the motion on
other parties) orally notify other parties and Commission staff personnel
responsible for acting on the motion that the motion has been (or is being) filed.
44

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 97 of 105
47 C.F.R. § 1.115
(a) Any person aggrieved by any action taken pursuant to delegated authority may
file an application requesting review of that action by the Commission. Any person
filing an application for review who has not previously participated in the
proceeding shall include with his application a statement describing with
particularity the manner in which he is aggrieved by the action taken and showing
good reason why it was not possible for him to participate in the earlier stages of
the proceeding. Any application for review which fails to make an adequate
showing in this respect will be dismissed.
(b)(1) The application for review shall concisely and plainly state the questions
presented for review with reference, where appropriate, to the findings of fact or
conclusions of law.
(2) The application for review shall specify with particularity, from among the
following, the factor(s) which warrant Commission consideration of the questions
presented:
(i) The action taken pursuant to delegated authority is in conflict with statute,
regulation, case precedent, or established Commission policy.
(ii) The action involves a question of law or policy which has not previously been
resolved by the Commission.
(iii) The action involves application of a precedent or policy which should be
overturned or revised.
(iv) An erroneous finding as to an important or material question of fact.
(v) Prejudicial procedural error.
(3) The application for review shall state with particularity the respects in which
the action taken by the designated authority should be changed.
(4) The application for review shall state the form of relief sought and, subject to
this requirement, may contain alternative requests.
(c) No application for review will be granted if it relies on questions of fact or law
upon which the designated authority has been afforded no opportunity to pass.
45

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 98 of 105
Note: Subject to the requirements of § 1.106, new questions of fact or law may be
presented to the designated authority in a petition for reconsideration.
(d) Except as provided in paragraph (e) of this section, the application for review
and any supplemental thereto shall be filed within 30 days of public notice of such
action, as that date is defined in section 1.4(b). Opposition to the application shall
be filed within 15 days after the application for review is filed. Except as provided
in paragraph (e)(3) of this section, replies to oppositions shall be filed within 10
days after the opposition is filed and shall be limited to matters raised in the
opposition.
(e)(1) Applications for review of interlocutory rulings made by the Chief
Administrative Law Judge (see § 0.351) shall be deferred until the time when
exceptions are filed unless the Chief Judge certifies the matter to the Commission
for review. A matter shall be certified to the Commission only if the Chief Judge
determines that it presents a new or novel question of law or policy and that the
ruling is such that error would be likely to require remand should the appeal be
deferred and raised as an exception. The request to certify the matter to the
Commission shall be filed within 5 days after the ruling is made. The application
for review shall be filed within 5 days after the order certifying the matter to the
Commission is released or such ruling is made. Oppositions shall be filed within 5
days after the application is filed. Replies to oppositions shall be filed only if they
are requested by the Commission. Replies (if allowed) shall be filed within 5 days
after they are requested. A ruling certifying or not certifying a matter to the
Commission is final: Provided, however, That the Commission may, on its own
motion, dismiss the application for review on the ground that objections to the
ruling should be deferred and raised as an exception.
(2) The failure to file an application for review of an interlocutory ruling made by
the Chief Administrative Law Judge or the denial of such application by the
Commission, shall not preclude any party entitled to file exceptions to the initial
decision from requesting review of the ruling at the time when exceptions are filed.
Such requests will be considered in the same manner as exceptions are considered.
(3) Applications for review of a hearing designation order issued under delegated
authority shall be deferred until exceptions to the initial decision in the case are
filed, unless the presiding Administrative Law Judge certifies such an application
for review to the Commission. A matter shall be certified to the Commission only
if the presiding Administrative Law Judge determines that the matter involves a
46

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 99 of 105
controlling question of law as to which there is substantial ground for difference of
opinion and that immediate consideration of the question would materially
expedite the ultimate resolution of the litigation. A ruling refusing to certify a
matter to the Commission is not appealable. In addition, the Commission may
dismiss, without stating reasons, an application for review that has been certified,
and direct that the objections to the hearing designation order be deferred and
raised when exceptions in the initial decision in the case are filed. A request to
certify a matter to the Commission shall be filed with the presiding Administrative
Law Judge within 5 days after the designation order is released. Any application
for review authorized by the Administrative Law Judge shall be filed within 5 days
after the order certifying the matter to the Commission is released or such a ruling
is made. Oppositions shall be filed within 5 days after the application for review is
filed. Replies to oppositions shall be filed only if they are requested by the
Commission. Replies (if allowed) shall be filed within 5 days after they are
requested.
(4) Applications for review of final staff decisions issued on delegated authority in
formal complaint proceedings on the Enforcement Bureau's Accelerated Docket
(see, e.g., § 1.730) shall be filed within 15 days of public notice of the decision, as
that date is defined in § 1.4(b). These applications for review oppositions and
replies in Accelerated Docket proceedings shall be served on parties to the
proceeding by hand or facsimile transmission.
(f) Applications for review, oppositions, and replies shall conform to the
requirements of §§ 1.49, 1.51, and 1.52, and shall be submitted to the Secretary,
Federal Communications Commission, Washington, DC 20554. Except as
provided below, applications for review and oppositions thereto shall not exceed
25 double-space typewritten pages. Applications for review of interlocutory
actions in hearing proceedings (including designation orders) and oppositions
thereto shall not exceed 5 double-spaced typewritten pages. When permitted (see
paragraph (e)(3) of this section), reply pleadings shall not exceed 5 double-spaced
typewritten pages. The application for review shall be served upon the parties to
the proceeding. Oppositions to the application for review shall be served on the
person seeking review and on parties to the proceeding. When permitted (see
paragraph (e)(3) of this section), replies to the opposition(s) to the application for
review shall be served on the person(s) opposing the application for review and on
parties to the proceeding.
(g) The Commission may grant the application for review in whole or in part, or it
may deny the application with or without specifying reasons therefor. A petition
47

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 100 of 105
requesting reconsideration of a ruling which denies an application for review will
be entertained only if one or more of the following circumstances is present:
(1) The petition relies on facts which related to events which have occurred or
circumstances which have changed since the last opportunity to present such
matters; or
(2) The petition relies on facts unknown to petitioner until after his last opportunity
to present such matters which could not, through the exercise of ordinary diligence,
have been learned prior to such opportunity.
(h)(1) If the Commission grants the application for review in whole or in part, it
may, in its decision:
(i) Simultaneously reverse or modify the order from which review is sought;
(ii) Remand the matter to the designated authority for reconsideration in
accordance with its instructions, and, if an evidentiary hearing has been held, the
remand may be to the person(s) who conducted the hearing; or
(iii) Order such other proceedings, including briefs and oral argument, as may be
necessary or appropriate.
(2) In the event the Commission orders further proceedings, it may stay the effect
of the order from which review is sought. (See § 1.102.) Following the completion
of such further proceedings the Commission may affirm, reverse or modify the
order from which review is sought, or it may set aside the order and remand the
matter to the designated authority for reconsideration in accordance with its
instructions. If an evidentiary hearing has been held, the Commission may remand
the matter to the person(s) who conducted the hearing for rehearing on such issues
and in accordance with such instructions as may be appropriate.
Note: For purposes of this section, the word “order” refers to that portion of its
action wherein the Commission announces its judgment. This should be
distinguished from the “memorandum opinion” or other material which often
accompany and explain the order.
(i) An order of the Commission which reverses or modifies the action taken
pursuant to delegated authority is subject to the same provisions with respect to
reconsideration as an original order of the Commission. In no event, however, shall
48

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 101 of 105
a ruling which denies an application for review be considered a modification of the
action taken pursuant to delegated authority.
(j) No evidence other than newly discovered evidence, evidence which has become
available only since the original taking of evidence, or evidence which the
Commission believes should have been taken in the original proceeding shall be
taken on any rehearing ordered pursuant to the provisions of this section.
(k) The filing of an application for review shall be a condition precedent to judicial
review of any action taken pursuant to delegated authority.
49

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 102 of 105
47 C.F.R. § 73.3598
(a) Except as provided in the last two sentences of this paragraph, each original
construction permit for the construction of a new TV, AM, FM or International
Broadcast; low power TV; TV translator; TV booster; FM translator; or FM
booster station, or to make changes in such existing stations, shall specify a period
of three years from the date of issuance of the original construction permit within
which construction shall be completed and application for license filed. Except as
provided in the last two sentences of this paragraph, each original construction
permit for the construction of a new LPFM station shall specify a period of
eighteen months from the date of issuance of the construction permit within which
construction shall be completed and application for license filed. A LPFM
permittee unable to complete construction within the time frame specified in the
original construction permit may apply for an eighteen month extension upon a
showing of good cause. The LPFM permittee must file for an extension on or
before the expiration of the construction deadline specified in the original
construction permit. An eligible entity that acquires an issued and outstanding
construction permit for a station in any of the services listed in this paragraph shall
have the time remaining on the construction permit or eighteen months from the
consummation of the assignment or transfer of control, whichever is longer, within
which to complete construction and file an application for license. For purposes of
the preceding sentence, an “eligible entity” shall include any entity that qualifies as
a small business under the Small Business Administration's size standards for its
industry grouping, as set forth in 13 CFR 121 through 201, at the time the
transaction is approved by the FCC, and holds
(1) 30 percent or more of the stock or partnership interests and more than 50
percent of the voting power of the corporation or partnership that will hold the
construction permit; or
(2) 15 percent or more of the stock or partnership interests and more than 50
percent of the voting power of the corporation or partnership that will hold the
construction permit, provided that no other person or entity owns or controls more
than 25 percent of the outstanding stock or partnership interests; or
(3) More than 50 percent of the voting power of the corporation that will hold the
construction permit if such corporation is a publicly traded company.
50

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 103 of 105
(b) The period of construction for an original construction permit shall toll when
construction is prevented by the following causes not under the control of the
permittee:
(1) Construction is prevented due to an act of God, defined in terms of natural
disasters (e.g., floods, tornados, hurricanes, or earthquakes);
(2) The grant of the permit is the subject of administrative or judicial review (i.e.,
petitions for reconsideration and applications for review of the grant of a
construction permit pending before the Commission and any judicial appeal of any
Commission action thereon), or construction is delayed by any cause of action
pending before any court of competent jurisdiction relating to any necessary local,
state or federal requirement for the construction or operation of the station,
including any zoning or environmental requirement; or
(3) A request for international coordination, with respect to an original
construction permit for a new DTV station, has been sent to Canada or Mexico on
behalf of the station and no response from the country affected has been received,
or the licensee or permittee is challenging the response from Canada or Mexico on
the grounds that the facility as approved would not permit the station to serve the
population that is both approved by the Commission and served by the station's TV
(analog) facility to be vacated by June 12, 2009.
(c) A permittee must notify the Commission as promptly as possible and, in any
event, within 30 days, of any pertinent event covered by paragraph (b) of this
section, and provide supporting documentation. All notifications must be filed in
triplicate with the Secretary and must be placed in the station's local public file.
(d) A permittee must notify the Commission promptly when a relevant
administrative or judicial review is resolved. Tolling resulting from an act of God
will automatically cease six months from the date of the notification described in
paragraph (c) of this section, unless the permittee submits additional notifications
at six month intervals detailing how the act of God continues to cause delays in
construction, any construction progress, and the steps it has taken and proposes to
take to resolve any remaining impediments.
(e) Any construction permit for which construction has not been completed and for
which an application for license has not been filed, shall be automatically forfeited
upon expiration without any further affirmative cancellation by the Commission.
51

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 104 of 105
52

USCA Case #11-1270 Document #1357489 Filed: 02/09/2012 Page 105 of 105
11-1270

IN THE UNITED STATES COURT OF APPEALS

FOR THE DISTRICT OF COLUMBIA CIRCUIT

Royce International Broadcasting Company, Appellant

v.

Federal Communications Commission, Appellee.

CERTIFICATE OF SERVICE

I, Maureen K. Flood, hereby certify that on February 9, 2012, I
electronically filed the foregoing Brief for Appellee with the Clerk of the
Court for the United States Court of Appeals for the D.C. Circuit by using
the CM/ECF system. Participants in the case who are registered CM/ECF
users will be served by the CM/ECF system.
Mark F. Dever
Mark B. Denbo
Drinker Biddle & Realth LLP
1500 K Street, N.W., Suite 1100
Washington, D.C. 20005
Counsel for: Royce International
Broadcasting Company

/s/ Maureen K. Flood

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.