Skip Navigation

Federal Communications Commission

English Display Options

Commission Document

Space Station Accepted for Filing PN 02/28/2013

Download Options

Released: March 1, 2013

PUBLIC NOTICE
FEDERAL COMMUNICATIONS COMMISSION
445 12th STREET S.W.
WASHINGTON D.C. 20554

News media information 202-418-0500
Internet: http://www.fcc.gov (or ftp.fcc.gov)
TTY (202) 418-2555

Report No. SAT-00933

Friday March 1, 2013

Policy Branch Information

Satellite Space Applications Accepted for Filing

The applications listed below have been found, upon initial review, to be acceptable for filing. The Commission
reserves the right to return any of the applications if, upon further examination, it is determined the application is not in
conformance with the Commission's rules or its policies. Consideration of each satellite application in this Public
Notice may depend on the Commission's action on another satellite application earlier in the queue. Petitions,
oppositions and other pleadings filed in response to this notice should conform to Section 25.154 of the Commission's
rules, unless otherwise noted. 47 C.F.R. ยง 25.154.

SAT-AMD-20130212-00020

E S2103
ORBCOMM License Corp.
Date Filed:
02/12/2013 14:47:28:32300
Amendment
Orbcomm License Corp. has filed a further amendment to its application to modify its non-voice, non-geostationary mobile satellite service (Little
LEO) system. See IBFS File No. SAT-MOD-20111021-00207. Orbcomm clarifies that its pending applications seek authority to add a feeder
link channel centered at 150.025 MHz for use by all satellites in the Orbcomm system, including in-orbit satellites, as well as Orbcomm
Generation 2 satellites that are not yet launched.
Orbcomm confirms that it will maintain the operational orbit and deployment plan proposed in its previous amendment, as well as the orbital
debris mitigation statement submitted with that amendment. See IBFS File No. SAT-AMD-20120809-00125.
Orbcomm requests waivers of its fourth and fifth satellite implementation milestones, which require Orbcomm to complete construction of and
launch its first two next-generation satellites by September 21, 2012, and to certify the entire Generation 2 system operational by March 21, 2014.
Alternatively, in the event waivers of both milestones are not granted, Orbcomm requests a waiver of the fourth milestone, and extension of the
fifth milestone deadline to December 31, 2015, or, alternatively, an extension of the fourth milestone to December 31, 2014, and an extension of
the fifth milestone deadline to December 31, 2015.

SAT-STA-20130212-00019

E S2110
Iridium Constellation LLC
Date Filed:
02/12/2013 13:02:32:60000
Special Temporary Authority
Iridium Constellation LLC requests special temporary authority for a period of 180 days to continue to operate three space stations in its
non-geostationary orbit constellation in a manner consistent with a revised post-mission disposal plan proposed in a pending license modification
application. See IBFS File No. SAT-MOD-20080701-00140.
Page 1 of 2

For more information concerning this Notice, contact the Satellite Division at 202-418-0719; TTY 202-418-2555.
Page 2 of 2

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.