State of Maine - MSCommNet Project

Download Options

Released: July 31, 2012

Federal Communications Commission

DA 12-1218

Before the

Federal Communications Commission

Washington, D.C. 20554

In the Matter of
)
)
STATE OF MAINE –
)
File Nos. Listed in Attached Appendix
MSCOMMNET PROJECT
)
)
Request For Waiver of Sections 90.35(a),
)
20.9(a)(6), 22.377, and 22.565(f) of the
)
Commission’s Rules

ORDER

Adopted: July 31, 2012

Released: July 31, 2012

By the Chief, Policy and Licensing Division, Public Safety and Homeland Security Bureau and the Chief,
Mobility Division, Wireless Telecommunications Bureau:

I.

INTRODUCTION

1.
The State of Maine – MSCommNet Project (Maine) filed numerous applications seeking
authorization to build out a trunked statewide private land mobile radio (PLMR) system using several
frequencies in the VHF band.1 In connection with a subset of these applications, Maine seeks a waiver of
Section 90.35(a) of the Commission's rules in order to operate on frequencies from the Industrial/Business
Pool.2 Furthermore, Maine seeks a waiver of Sections 20.9(a)(6), 22.377 and 22.565(f) in order to
incorporate Part 22 Paging frequencies into its statewide system.3 For the reasons detailed below, we
grant Maine’s waiver requests.

II.

BACKGROUND

2.
Maine is in the process of upgrading its state-wide public safety radio communications
network. At the present time, Maine’s agencies and departments operate multiple independent PLMR
systems, which Maine describes as “outdated, difficult to maintain, and no longer adequate to serve
respective departments’ critical needs.”4 According to Maine, these radio systems are four to five
generations obsolete, are suffering an increased number of outages, and do not meet the narrowbanding
requirements that will go into effect for all VHF and UHF PLMR systems on January 1, 2013.5


1 Since October 2011, Maine has filed over one-hundred applications under the FCC Registration Number (FRN)
0019538925.
2 See waiver request included with the applications listed in Tables 1 and 2 of the attached appendix (I/B Waiver
Request).
3 See waiver request included with the application listed in the Table 3 of the attached appendix (Part 22 Waiver
Request).
4 I/B Waiver Request at 2.
5 Id. at 2-3.

Federal Communications Commission

DA 12-1218

3.
Consequently, Maine plans to consolidate all of its legacy radio systems into a new statewide
narrowbanded (12.5 kHz channel bandwidth) VHF trunked Project 25 radio system.6 Once constructed,
the new statewide system will provide “improved geographic radio coverage, voice quality/clarity and
channel capacity.”7 Furthermore, the new statewide system will “allow for seamless interoperability
across all levels of government (including non-State agencies).”8
4.
Due to a sparse population and heavily forested terrain, Maine contends that the VHF band
(150-170 MHz) is the only viable frequency band for its statewide network because of the band’s
“excellent propagation characteristics.”9 Maine states that higher frequency bands, including the 700
MHz and 800 MHz bands, offer limited coverage and are subject to increased foliage attenuation, which
is “a particularly serious problem in a heavily forested state such as Maine.”10 Maine estimates that a
statewide VHF system requires only 42 upgraded/updated radio sites at a total cost of $49 million while
an 800 MHz-based statewide system would require 146 sites at an overall cost of over $177 million.11
Aside from cost and engineering advantages, Maine also notes that the VHF band is the only band that
provides “state-wide interoperability among federal, state and local public safety agencies.”12
5.
Maine argues, however, that there are insufficient VHF band channels available in the Public
Safety Pool to meet its requirements for the new statewide system.13 Maine notes that it is already
incorporating all channels currently assigned to it into the new statewide system and that it has applied for
all remaining Public Safety Pool channels that can be used without causing interference to other users.14
Claiming it lacks any other viable alternative, Maine seeks to obtain additional VHF frequencies from the
Industrial/Business Pool for inclusion in its proposed system.15 However, because Maine, a public safety
entity, is ineligible for licensing on Industrial/Business Pool frequencies, it requires a waiver of the
eligibility requirements set forth in Section 90.35(a) of the Commission’s rules.16
6.
In support of its waiver request, Maine submits a study from a Public Safety Frequency
Coordinator confirming the lack of available Public Safety Pool frequencies in the VHF band to serve
Maine’s needs.17 With each application seeking an Industrial/Business Pool frequency, Maine also


6 Id. at 3.
7 Id.
8 Id.
9 Id. at 4.
10 Id.
11 Id. at 4-5.
12 Id. at 5.
13 Id. at 6.
14 Id.
15 Id.
16 47 C.F.R. § 90.35(a).
17 See the frequency study attached to each application listed in Tables 1 and 2 of the attached appendix (collectively
Maine Frequency Studies).
2

Federal Communications Commission

DA 12-1218

includes a statement from an Industrial/Business Frequency Coordinator confirming it concurs with the
coordination of Maine’s proposed facilities on the Industrial/Business frequencies.18
7.
On March 13, 2012, the Public Safety and Homeland Security Bureau released a Public
Notice seeking comment on Maine’s request for a waiver of Section 90.35(a) to license frequencies from
the Industrial/Business Pool.19 The two commenting parties who responded to the public notice both
supported Maine’s request for waiver.20
8.
In addition to Public Safety Pool and Industrial/Business Pool frequencies, Maine also seeks
to incorporate a number of VHF band Part 22 paging frequencies into its statewide system.21 To
accomplish this, the Harris Corporation (Harris), a licensee of certain Part 22 VHF paging channels in the
State of Maine, has filed an application to assign its paging licenses to Maine.22 In connection with the
Harris assignment application, Maine seeks a waiver of Section 20.9(a)(6), which requires licensees on
Part 22 paging channels to operate as common carriers, of Section 22.377, which requires transmitters
operating on Part 22 frequencies to be certificated for use under Part 22, and of Section 22.565(f), which
limits the power of Part 22 mobile radios to 60 watts transmitter output power.23
9.
In its request for waiver of Section 20.9(a)(6), Maine argues that “common carriage is
inconsistent with the provision of public safety communications” and that “[a]ccess to the statewide radio
system must be limited to authorized state, local and federal users.”24 With regard to Section 22.565(f),
Maine states that it intends to program the Part 22 paging frequencies into its statewide mobile units,
which operate at 110 watts output power, and contends that limiting the mobile units to 60 watts would be
unduly costly because it would require Maine to build additional base stations to ensure adequate “talk-
back” capability from the mobile units in the field.25 With regard to Section 22.377, Maine notes it will
operate its “entire state-wide radio system pursuant to Part 90” and that all equipment used on the system
will conform to Part 90 requirements.26 Thus, Maine claims that requiring it to deploy Part 22 equipment
on the Part 22 frequencies is not a viable option.27


18 See the statement from an Industrial/Business Frequency Coordinator attached to each application listed in Tables
1 and 2 (collectively Industrial/Business Coordinator Statements).
19 See Public Safety and Homeland Security Bureau Seeks Comment on Applications and Waiver Request Filed by
the State of Maine for 150 MHz Industrial/Business Frequencies, Public Notice, 27 FCC Rcd 2521 (2012).
20 See statement from the State of Wisconsin Department of Transportation attached to application no. 0004825917
on Mar 26, 2012 (Wisconsin DOT Comments); and the comments of the Enterprise Wireless Alliance attached to
applications application nos. 0004825917, 0004825918, 0004885388, 0004905098, 0004912404, 0004931902,
0004933177, 0004938501 on Mar. 27, 2012 (EWA Comments).
21 See justification for unpaired frequencies attached to the applications listed in Tables 2 and 4 in the attached
appendix.
22 See application listed in Table 3 of the attached appendix.
23 Part 22 Wavier Request at 1.
24 Id.
25 Id. at 2.
26 Id.
27 Id.
3

Federal Communications Commission

DA 12-1218

III.

DISCUSSION

10.
Section 1.925 states that to obtain a waiver of the Commission’s rules, a petitioner must
demonstrate either that: (i) the underlying purpose of the rule(s) would not be served or would be
frustrated by application to the present case, and that a grant of the waiver would be in the public
interest;28 or (ii) in view of unique or unusual factual circumstances of the instant case, application of the
rule(s) would be inequitable, unduly burdensome, or contrary to the public interest, or the applicant has
no reasonable alternative.29 We find that Maine satisfies the second prong of the waiver standard for each
of its waiver requests as detailed below.
11.
Section 90.35(a) Eligibility Requirements. We concur with Maine that there are insufficient
available Public Safety Pool frequencies in the VHF band to serve Maine’s needs for its statewide radio
system.30 We also acknowledge Maine’s unique terrain, with its heavily forested areas, which are
difficult to penetrate for adequate radio coverage in frequency bands above the VHF band.31
Consequently, we find it unduly burdensome to require Maine to build a statewide radio system on
frequency bands higher than the VHF band—where adequate radio coverage is difficult to achieve—
solely to use frequencies from the Public Safety Pool (i.e. frequencies for which it is typically eligible to
license). Furthermore, we find it contrary to the public interest for Maine to build a statewide PLMR
system incapable of interoperating with federal, state and local public safety officials throughout the state
because it operates in a different frequency band.32
12.
We also find it unlikely that Maine will cause interference to other Industrial/Business Pool
users because Maine’s applications were approved by coordinators certified to coordinate
Industrial/Business Pool frequencies.33 Consequently, we find that Maine has satisfied the waiver
standard with respect to its request for relief from the eligibility requirements specified in Section
90.35(a) of the Commission’s rules.
13.
Section 20.9(a)(6) Common Carrier Requirement. We agree with Maine that the requirement
to operate as a common carrier on Part 22 paging channels and offer telecommunications service to the
public is “inconsistent with the provision of public safety communications,” which is premised on
limiting network access to authorized state, local, and federal users.34 Consequently, having found that
Maine has a legitimate need to incorporate Part 22 paging channels into its statewide system, it would be
contrary to the public interest to require Maine to comply with the common carrier requirement.
Therefore, we find Maine has satisfied the standard for waiver of this requirement.


28 47 C.F.R. § 1.925(b)(3)(i).
29 47 C.F.R. § 1.925(b)(3)(ii).
30 See Maine Frequency Studies.
31 Foliage loss can be calculated using the following formula: L = 1.33 (f0.284d0.588), where L is the foliage loss in
decibels along a path blocked by dense, dry, in-leaf temperate-climate trees, f is the frequency in GHz, and d is the
path length in meters. See Weissberger, M. A., "An Initial Critical Summary of Models for Predicting the
Attenuation of Radio Waves by Trees, " ESD-TR-81- 101, Electromagnetic Compatibility Analysis Center,
Annapolis, MD, August 1981.
32 I/B Waiver Request at 5 (noting that all federal, state and local agencies operate in the VHF band except for the
City of Portland).
33 See Industrial/Business Coordinator Statements. See also EWA Comments at 2-3.
34 Part 22 Waiver Request at 1-2.
4

Federal Communications Commission

DA 12-1218

14.
Section 22.565(f) Mobile Radio Power Limit. Maine has designed its system for 110 watt
mobile units to ensure adequate “talk-back” ability. We agree with Maine that it would be unduly
burdensome to limit mobile units operating on Part 22 paging frequencies to 60 watts while the rest of its
mobile fleet operates at 110 watts as permitted under the higher Part 90 power limits. Applying the rule
in this manner would be spectrally inefficient, would force Maine to redesign its network, and would
likely require construction of additional base stations at substantial cost. 35
15.
However, to reduce the potential for interference to Part 22 licensees in adjacent regions, we
limit the area in which Maine may operate mobile units at 110 watts on Part 22 frequencies. Specifically,
we require Maine to operate its mobile units at least 8 kilometers from the edge of its Part 22 service area
when transmitting at power levels above 60 watts on Part 22 paging frequencies.36 This restriction
remains in effect unless Maine obtains the consent of the Part 22 licensee in the adjacent regions. By
restricting the distance at which Maine’s overpowered mobile units can operate from the border of its
service area, we limit the interference potential of these units to that of a 60-watt mobile unit operating at
the edge of the Part 22 service area. 37
16.
With this condition, we find Maine has satisfied the standard for waiver of the 60-watt limit
for mobile units specified in Section 22.565(f) of our rules.
17.
Section 22.377 Certifications of Transmitters. Having waived Maine’s requirement to
operate as a common carrier and having waived the 60 watt power limit for mobile units, we agree with
Maine that it would be unduly burdensome to require it to operate its Part 22 frequencies only on
equipment certified under Part 22. Maine intends to operate its entire statewide system on equipment
approved under Part 90.38 Therefore, in this instance, we find it unnecessarily burdensome to require
Maine to also get its equipment certified for operation under Part 22. Consequently, we find Maine has
satisfied its request for waiver of the equipment certification requirement of Section 22.377.

IV.

ORDERING CLAUSES

18.
Accordingly, we GRANT the waiver requests associated with the applications listed in
Tables 1, 2, and 4 of the attached appendix filed by State of Maine – MSCommNet Project, pursuant to
Section 1.925 of the Commission’s rules, 47 C.F.R. § 1.925, and we will PROCESS the associated
application accordingly.
19.
Furthermore, we GRANT the waiver requests associated with the application listed in Table 3
of the attached appendix filed by Harris Corporation, pursuant to Section 1.925 of the Commission’s rules,
47 C.F.R. § 1.925, with the condition that mobile units must maintain at least an eight kilometer
separation from the edge of the service area when operating at power levels above 60 watts transmitter
output power unless concurrence is obtained from the adjacent Part 22 licensee, and we will PROCESS
this application accordingly.


35 Id. at 2.
36 We calculate that a mobile unit operating at 110 watts extends the Part 22 interference contour approximately
eight kilometers beyond the interference contour produced by a mobile unit operating at 60 watts. We assumed the
minimum radial antenna height above average terrain of 30 meters for this calculation. See 47 C.F.R. § 22.567.
37 The Part 22 service area is specified on each Part 22 license associated with assignment application no.
0005129300.
38 Part 22 Waiver Request at 2.
5

Federal Communications Commission

DA 12-1218

20.
We take this action under delegated authority pursuant to Sections 0.131, 0.191, 0.331 and
0.392 of the Commission’s rules, 47 C.F.R. §§ 0.131, 0.191, 0.331, 0.392.
FEDERAL COMMUNICATIONS COMMISSION
Thomas J, Beers
Chief, Policy and Licensing Division
Public Safety and Homeland Security Bureau
Roger Noel
Chief, Mobility Division
Wireless Telecommunications Bureau
6

Federal Communications Commission

DA 12-1218

Appendix

Table 1 – Maine Applications Seeking Industrial/Business Frequencies but No Paring with Part 22
Frequencies
0004825918
0004905098
0004885388
0004933177
Table 2 – Maine Applications Seeking Industrial/Business Frequencies and Paring with Part 22
Frequencies
0004825917
0005023482
0004912404
0005023483
0004931902
0005023484
0004938501
0005025387
0005021444
0005025393
0005021983
0005025399
0005023471
0005025402
0005023476
0005028257
0005023478
0005028258
Table 3 – Harris Application for Assignment of Part 22 Paging Channels to Maine
0005129300
Table 4 – Maine Applications Seeking Public Safety Pool Frequencies and Pairing with Part 22
Frequencies
0004916345
0004969944
0004916346
0004984161
0004924517
0004984164
0004925729
0004984165
0004925876
0005016781
0004932247
0005018789
0004935091
0005018793
0004935092
0005018796
0004935093
0005018798
0004935095
0005018799
0004935097
0005021447
0004935098
0005021982
0004935099
0005021989
0004935100
0005021992
0004935101
0005023026
0004935102
0005023480
0004935532
0005023488
0004944714
0005028838
0004969940
0005119124
7

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.

close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.