Skip Navigation

Federal Communications Commission

English Display Options

Commission Document

Erratum - Connect America Fund; ETC Annual Reports and Certifications

Download Options

Released: July 17, 2014

Federal Communications Commission

Before the

Federal Communications Commission

Washington, D.C. 20554

In the Matter of



Connect America Fund


WC Docket No. 10-90


ETC Annual Reports and Certifications


WC Docket No. 14-58



July 17, 2014

By the Acting Chief, Wireline Competition Bureau:

On July 14, 2014, the Commission released a Report and Order and Further Notice of Proposed

Rulemaking (Rural Broadband Experiments Report and Order and FNPRM), FCC 14-98, in the above

captioned proceedings. This Erratum amends the Rural Broadband Experiments Report and Order and

FNPRM as indicated below:


In Paragraph 15, in the second sentence, add the words “price cap” before “locations.”


In Paragraph 18, in the fourth sentence, replace “Bureau” with “Wireline Competition Bureau



In Paragraph 20, in the first sentence, replace “its” with “their.”


In Paragraph 51, in the first sentence, delete the words “Wireline Competition” and “(Bureau).”


In Paragraph 60, in the third sentence, replace “deposits” with “obligations.”


In Footnote 89, add the word “submitted” after “initially.”


In Paragraph 82, in the second sentence, delete the words “selected for the rural broadband

experiment recipient”.


In Paragraph 95, in the fourth sentence after the word “issued,” delete “a decision.”


Paragraph 115 is corrected to read as follows:

“IT IS FURTHER ORDERED, that the Commission’s Consumer and Governmental Affairs

Bureau, Reference Information Center, SHALL SEND a copy of this Report and Order and Further

Notice of Proposed Rulemaking in WC Docket No. 10-90 and WC Docket No. 14-58, including the

Further Regulatory Flexibility Analysis and the Initial Regulatory Flexibility Analysis, to the Chief

Counsel for Advocacy of the Small Business Administration.”

10. In Appendix B, in the first sentence of paragraph 63, replace “projected” with “projects.”


Carol E. Mattey

Acting Chief

Wireline Competition Bureau

Note: We are currently transitioning our documents into web compatible formats for easier reading. We have done our best to supply this content to you in a presentable form, but there may be some formatting issues while we improve the technology. The original version of the document is available as a PDF, Word Document, or as plain text.


You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.