NORS -- CSRIC Best Practices Result

CSRIC Best Practices Result

Detailed Information for the Best Practice: 9-7-0499

Number 9-7-0499
Priority Critical
Description Network Operators and Service Providers should consider ensuring that the back-haul facility equipment located at the cell site is provided with backup power duration is equal to that provided for the other equipment at the cell site.
Network Type(s) Wireless
Industry Role(s) Service Provider; Network Operator
Keyword(s) Facilities - Transport;Network Design;Power;