NORS -- CSRIC Best Practices Result

CSRIC Best Practices Result

Detailed Information for the Best Practice: 9-7-0651

Number 9-7-0651
Priority Critical
Description Network Operators, Service Providers and Property Managers should consider providing diversity within power supply and distribution systems so that single point failures (SPOF) are not catastrophic. For large battery plants in critical offices, consider providing dual AC feeds (odd/even power service cabinets for rectifiers). Transfer switches should be listed to a UL standard for Transfer Switch Equipment. When transfer breaker systems are used, they must be mechanically and electrically interlocked.
Network Type(s) Cable; Internet/Data; Satellite; Wireless; Wireline
Industry Role(s) Service Provider; Network Operator; Property Manager
Keyword(s) Buildings;Network Design;Power;